@ INSTALLATION
6555650 | MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6545260 - 6545273)
6555583 MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6549370 - 6549377)
PIN 6548992 is repalced by PIN 6555650
PIN 6550532 Is replaced by PIN 6555583.
REPLACING THE E-BOX MODULES
STEP 1. EMPTY MBR TANK ET002
1. Before commencing the emptying of the MBR tank ensure, on the control panel, that all pump control switches,
‘except the MBR tank air blower EB001 are in the "OFF" position.
2. Empty the equalizing tank ETO01 to make enough room to pump the contents of the MBR tank ET002 into
the equalizing tank:
+ Tum the motor three-way valve ECVOO1 on the control panel to sludge recycling position (switch to indicate
*CIRC’)
+ Make sure that the valve EV039 is open. Close valve EV013 and turn the 3-way valve EV009 to the discharge
position.
+ Run the sludge removal pump EPO06 manually from the control panel unti the equalizing tank is empty.
3. Stop the ftration operation by closing the shut-off valves EVO1S to 18 and tur off the air blower E8001
4, Move the sludge from the MBR tank to the equalizing tank to empty the MBR tank:
+ Switch on the equalizing tank air blower EB002 manually from the control panel.
+ Close the valve EV039 in the equalizing tank discharge line at the bottom of the tank.
+ Open valve EV013 in the MBR tank bottom discharge line.
+ Tum the motor three-way valve ECVO001 on the control panel to sludge return position (Switch $09 to indicate
“RETURN’). c
+ Turn the valve EV009 towards the equalizing tank (ports 1-2 open).
+ Run the sludge removal pump EPO06 until the MBR tank is empty.
‘STEP 2. REMOVE OLD MEMBRANE MODULES:
1. Before opening the MBR service hatch, wash down the tank internals through the top hatch to remove the
sludge that has adhered to the door and to the tank walls and the pH-sensor.
2. Remove the pH-sensor QE001 and put the sensor head into a container of clean water.
3, Empty rinsing water in the equalizing tank by using pump EP006 manually from the control panel. You will hear
‘when the pump is starting to suck air. Stop the pump.
4. Open the membrane tank access hatch on the side of the MBR unit, Collect all nuts and washers and retain,
58, Remove sewage water from the bottom of the MBR tank by using a small pump or external vacuum system.
‘no mainos thera ona trator hi opostcaten witout pornaion
Scare OF als seed ADate: 23 Jan 2016 0038285] *
INSTALLATION
6555650 | MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6545260 - 6545273)
6555583 | MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6549370 - 6549377)
If neither is available use @ hand bailing system
Clean the tank until the bottom plate is clearly
visible. Use clean rinsing water to keep the sludge
moving. Enter the tank.
6. Disconnect the flexible air hoses installed on the
membrane module casings. A knife may be used
to cut off the old hoses. New hoses are included
in the delivery of the new membrane panels.
Disconnect the effluent output lines from the tank
wall connections,
7. Unlock the captive quick release clips on the top of
the membrane casing frame. |
8. Lift up the membrane casing frame from the
locating pins on the MBR tank floor and remove the
membrane casing frame from the MBR tank. Collect
the rubber feet from the bottom of the MBR tank
Disconnect the effluent line bottom flexible hose
from the blue permeste header box and retain
Undo the retaining bolts from the stifening strips | _
from both sides of the front ofthe membrane casing
Loosen the side retaining bolts to allow movement
of the membrane cartridge unit. Carefully pull the
membrane cartridge unit out from the membrane
module's casing
STEP 3. CLEAN UP THE PERMEATE LINE
1. Rinse all effluent from the permeate line. Remove
permeate line for cleaning if membranes were
broken.
2. Feed clean water to the permeate line through the
cend-caps in the line to enable the cleaning of the in-
line sight glasses. Also use the membrane washing
valve £V020 to rinse all ditt from the pipeline.
3, Valve EV019 must also be thoroughly cleaned and
when completed this valve must be tumed to the
“closed position.
‘STEP 4. CLEANING OF THE EFFLUENT TANK
1. Use pump EP003 operated from the control panel to
empty as much of the contents of the effluent tank
as possible and then insert a container under the
bottom drain plug. Open the drain plug to allow the
remaining water to empty.
2.Open the effluent tank cover. Use ‘a dréinage
container to contain any overspil
See mere arene tacts he monn 5Date:23 Jan 2016
INSTALLATION
Doe, 0083285
6555650 MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6545260 - 6545273)
6555583 MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6549370 - 6549377)
3, Clean the effluent tank and then replace and secure
the effluent hatch,
STEP 5, INSTALL THE NEW MEMBRANES.
1, Replace the membrane cartridge into the casing or
install a new complete membrane module. A new
membrane-is more easily installed into the frame
When the frame is rotated onto its side and ‘the
‘module inserted from the top.
1 NOTE:
When installing the new membrane module, make
sure that the lower membrane effluent connection is
plugged with the plug included in the delivery of the
new E-box.
I NOTE:
Handle the membrane cartridge with extreme care.
Do not damage the membrane surface by striking
with a sharp object or by rubbing with hard materials.
I NOTE:
When cleaning the membrane cartridge outside
of the bioreactor tank don't expose the membrane
cartridge to the atmosphere for any period that
could enable the membrane panels to dry out. In thé
event of a membrane panel drying out contact Evac
Oy for further advice
2. Fasten rubber feet with cable ties to the E-Box
bottom to aid installation.
3. Install rear membrane rack into the tank.
4. Attach the stiffening strips and tighten all the bolts
on the membrane module casing.
5. Reattach the flexible permeate line to the blue
permeate header box.
6. Place the membrane casing frame onto the locating
pins on the MBR tank floor.
7. Connect the effluent output line to the tank wall
connection.
8. Connect the air supply hoses to the aerators.
9. Lock the captive quick release clips on the top of the
membrane casing frame. Instalithe new membranes,
starting from the rear of the MBR unit and work
forward. Test the steadiness of the assembly of
each module.
‘2G ames hei mata sraara i apatenin wot pra,@
6555650
6555583
10. Refit and secure the membrane tank access hatch
on the side of the MBR unit.
STEP 6. CALIBRATE AND INSTALL THE pH SENSOR
1. Wah pH-sensor head with a pH7 liquid and submerge
it into clean pH7 liquid,
2. Check accuracy of the ph sensor and calibrate it if
required. If there is a control knobs for pH adjustment,
sett to 7 while within the pH7 liquid. Otherwise you will
need pH7 and pH liquid for calibration, First, immerse
the probe into the 7 pH liquid, then "press Yes’. Weit
Until the value 4-figure is stabilized, then “Press Yes"
Now move the probe into the pH liquid and wait until
the value has stabilized, then “Press Yes’. The sensor
is now calibrated,
3. Assemble the pH-sensor back into place.
STEP 7. REFILL THE MBR TANK
1. Ensure that the valve EV009 is returned to the position
Where port 1-2 is open.
2. Open the valve EV039 and close the valve EVO13.
3. Start filing the MBR tank using the MBR feeding pump
EP0O1 until the water level-reaches the high level
switch in the MBR tank. Observe the water levels in
the equalizing and MBR tank from the top of the tank,
4. Start the air blower EB001.
5. Open valve EV013,
6. Set the switches on the control panel back to their
normal positions as described in the Evac MBR user's
manual section "Operation - 7.3”
1 NOTE: The E-Box 2 membranes require a lower
operating air pressure. Replace the throttling washer
from the airation manifold.
‘The correct hole diameter for the washers the following
when using the blower PIN 6546810 or P/N 6546812;
MBR 8: (50Hz) 12.5mm P/N 6558754
(60 Hz) 16.5mm P/N 6568755
MBR 16: (50Hz) 10mm P/N 6558756
(60 Hz) 13mm —_P/N.6558757
MBR 24: (50Hz) 5.6mm P/N 6558758
(60 Hz) 10.5mm P/N 6558759
MBR 32 (50Hz) Omm P/N 6558760
(60Hz) 9mm P/N 6558761
See
Date. 23 Jan 2015
INSTALLATION
~Bes._008828-5
MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6545260 - 6545273)
MEMBRANE MODULE E-BOX 2, (FOR MBR UNITS 6549370 - 6549377)