You are on page 1of 1

PROJECT: CABLE TERMINATION WORKS-OUTLET MALL

ELECT.CONT.
SITE TEST CERTIFICATE
CABLE IR TEST

Date : 26.11.2020 Page :1

CABLE TERMINATION WORKS-OUTLET MALL


Contract No Email Confirmation. Location Switch Gear Room
Main Contractor M/s Sunshine Engineering Circuit Name Switch Gear to
Works Transformer room
Consultant - Equipment 3Cx185 cables
Sub-Contractor M/s EHVEMC Cable Testing Before termination in

INSULATION RESISTANCE TEST

Core (R)- Core (Y)- Core (B)- Core (R) – Core (Y) –
Circuit Name Armor Armor Armor Core (Y) Core (B)

Switch Gear Panel 1 – 657 GΩ 735 GΩ 662 GΩ 2.04 TΩ 2.04 TΩ


Transformer 1
Switch Gear Panel 2 – 651 GΩ 819 GΩ 986 GΩ 2.52 TΩ >3.0 TΩ
Transformer 2
Switch Gear Panel 3 – 749 GΩ 729 GΩ 848 GΩ >3.0 TΩ 2.33 TΩ
Transformer 3
Switch Gear Panel 4 – 486 GΩ 592 GΩ 612 GΩ 1.62 TΩ 1.75 TΩ
Transformer 4
Switch Gear Panel 5 – 498 GΩ 583 GΩ 644 GΩ 1.46 TΩ 1.91 TΩ
Transformer 5

INSTRUMENTS Megger-5 KV Calibration Date : 08.10.2020


Calibration Due Date :07.10.2021
SERIAL 100310/23088
NUMBER

TESTED BY RECEIVED BY
Muhammed Niyaz Arun Prasath
NAME
EHV EMC LLC M/s Sunshine Engineering works
COMPANY

SIGNATURE