TRANSMITTAL LETTER

PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) SP SUBANG


(PT. RAMAI JAYA ABADI)
Kepada : PT. RAMAI JAYA ABADI PT. PERTAMINA EP Regional 2 Zona 7
Jl. Patra Raya Klayan No.1
Cirebon 45151

TELP/FAX : - TELP : 0231 - 220555


FAX : 0231 - 206960

Cirebon, 27 Sep 2022

Transmittal letter No. : PEPR2Z7-TR-B-09-2022-012


THE FOLLOWING ITEMS ARE TRANSMITTED
Specification Material requisition/PO/MTO
Drawing Vendor
Reports X Others

NO. DOCUMENT REV STATUS TITLE/DESCRIPTION Comment REMARKS

1 3900520395-11-PE-03-CS-003 A IFR Line Sizing Calculation Report Approved As Noted Original

2 3900520395-60-PE-03-CS-006 A IFR Indoor Sprinkler Calculation Approved As Noted Original

3 3900520395-60-CI-01-GA-001 A IFR Foundation Plan, Section & Detail for Waterpond Not Approved Original

4 3900520395-60-CI-01-GA-002 A IFR Structural Plan, Section & Detail for Fire Pump Shelter Not Approved Original

5 3900520395-60-CI-01-GA-003 A IFR Foundation Plan, Section & Detail for Diesel Fire Pump Not Approved Original

6 3900520395-60-CI-01-GA-004 A IFR Foundation Plan, Section & Detail for Jockey Fire Pump Not Approved Original

7 3900520395-60-CI-01-GA-005 A IFR Foundation Plan, Section & Detail for Hydrant Box, Fire Hydrant Approved As Noted Original

8 3900520395-60-CI-01-GA-006 A IFR Foundation Plan, Section & Detail for Bladder Tank Not Approved Original

9 3900520395-60-CI-01-GA-007 A IFR Foundation Plan, Section & Detail for Pipe Support & Structur Not Approved Original

10 3900520395-60-CI-01-GA-008 A IFR Foundation Plan, Section & Detail for Diesel Daily Tank Not Approved Original

Prepared By : Received By :
Name Sign Nama
Sign Date

Dhea