You are on page 1of 1

STAGE 3 - TECHNICAL DESIGN

LAND KEY:
NORTH

B
2
B

1 7A 3

B
7B
4 5 6 7
B

G
E
N
E
R
A
L
N
O
T
E
S
:
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. ALL LEVELS SHOWN ON DRAWINGS ARE FINISHED FLOOR LEVELS UNLESS
SPECIFIED OTHERWISE.
3. THIS DRAWING IS A COPYRIGHT AND PROPERTY OF THE ARCHITECT, IS NOT
TO BE PRODUCED, COPIED, HANDED OVER TO THIRD PARTY OR USED FOR
ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS INTENDED.
4. ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK ANY
DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT.
5. THE CONSTRUCTION MANAGER/CONTRACTOR MUST CHECK ALL DIMENSIONS
-R -Q -P -N -M -L -K -J -H -G -F -E -D -C -B -A Y +A +B +C +D +E +F +G +H +J +K +L +M +N +P +Q +R AND DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY DISCREPANCY
SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT.
6. THIS DRAWING IS TO BE READ AND NOT SCALED.
7. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT
5900 9000 9000 9000 9000 9000 5900 8000 9000 9000 9000 9000 9000 9000 9000 4500 4500 9000 9000 9000 9000 9000 9000 4500 9000 9000 9000 9000 4500 9000 4500 9000 ARCHITECTURAL, STRUCTURAL AND SERVICES DRAWINGS. ANY
DISCREPANCY NOTICED SHALL BE BROUGHT TO THE ATTENTION OF THE
CONSULTANTS WITHIN PROCUREMENT / EXECUTION OF WORKS.
8. ANY DRAWING PREPARED BY THE CONTRACTOR/SUB-CONTRACTOR/ VENDOR
AND APPROVED BY THE ARCHITECT/PROJECT MANAGER IS FOR GENERAL
CONFORMITY WITH THE OUTLINE DESIGN INTENT ONLY. SUCH APPROVALS DO
NOT RELIEVE THE CONTRACTOR TOGETHER WITH THE SUB-
CONTRACTOR/VENDOR FOR FULL RESPONSIBILITY FOR ACCURACY,
INTEGRATION AND FITNESS OF DESIGN (TO THE EXTENT APPLICABLE) AND
LEGEND : FOR MEETING THE PURPOSE OF DESIGN.
CONSTRUCTION

REFER TO DWG No. Booster Cold Water Supply Pipe Line (BCWS)
A101-CEC-MH43-DWG-GF0102 Hot water Supply Pipe Line (HWS)
Hot water Return Pipe Line (HWR)
Water Feature Line
AIR LOCK
Main Incoming Potable Water Line
Tanker Inlet Line
Control Cable
WM WATER METER

ACCESSIBLE TOILET
TOILET (M)

SECURITY OFFICE U/G UNDER GROUND


SECURITY ENTRANCE
?
DETENTION ROOM
SERVICE CORRIDOR H/L HIGH LEVEL
SERVICE CORRIDOR TOILET (F)

+8 L/L LOW LEVEL


ELECTRICAL ROOM ?
T/A TO ABOVE
IT ROOM
WARDROBE ASSISTANT DESK
T/B TO BELOW
9000

IT ROOM

IDF

STORAGE IDF

MEP ROOM F/A FROM ABOVE


OPERATION OFFICE

CORRIDOR
ELECTRICAL ROOM AIR LOCK

F/B FROM BELOW


+7 VESTIBULE
FIRE ALARM CHECK VALVE + WATER CABINET
GARBAGE HOLDING

PLUMBING SHAFT

ST-04
IV ISOLATION VALVE
WASTE HOLDING FHC
PLUMBING+ CHWS/R SHAFT

DRV DOUBLE REGULATING VALVE


9000

PL-02 FIRE ALARM CHECK VALVE


IDF GSM
ELECTRICAL ROOM
IDF
ST-05
1200x1200x1000
VALVE CHAMBER PRV PRESSURE REGULATING VALVE
CHWS/R SHAFT
ARCHIVE RECORD ROOM
GURU LOBBY

COMMUNITY OFFICE PLUMBING SHAFT


BOH CORRIDOR WC WATER CLOSET
+6 WORK STATIONS
WB WASH HAND BASIN
MEETING ROOM 01

STORAGE
HR WALL MOUNTED HOSE REEL
9000

COMMUNITY OFFICE

REFER TO DWG No. VVIP LOBBY VESTIBULE


WHA WATER HAMMER ARRESTER
REFER TO DWG No.

BOH CORRIDOR
A101-CEC-MH43-DWG-GF0101
MEETING ROOM 02

MECHANICAL ROOM
SERVER ROOM

BT BIP TAP
COMMUNITY OFFICE
STORAGE A101-CEC-MH43-DWG-GF0103
+5 FIRE ALARM CHECK VALVE
PP POTATO PEELER
VVIP LIFT LOBBY
TOILET
STORAGE
CCTV ROOM
GCO GAS COMBI OVEN

CORRIDOR
ELECTRICAL ROOM
9000

COMMUNITY OFFICE

PL-03 PL-04
UR URINAL
STORAGE ELECTRICAL ROOM IDF
FHC MEP ROOM
BATTERY AND FA ROOM-02
FIRST AID ROOM

? ? STORAGE
FHC
SH SHOWER
ELECTRICAL ROOM

BOH CORRIDOR VESTIBULE


BOH CORRIDOR

+4 EWH ELECTRIC WATER HEATER


PLUMBING SHAFT ?

?
SHOE HOUSE ? BOP BOTTOM OF PIPE
CORRIDOR
9000

BOOKSHOP

MAJLIS (F) MAJLIS (M)


BOH CORRIDOR
STORAGE
? DWF DRINKING WATER FOUNTAIN
CORRIDOR

DEVOTEES ARRIVAL LOBBY


EXHIBITION HALL
SHOE HOUSE LOBBY
ORIENTATION ROOM F/H/L FROM HIGH LEVEL
STORAGE

SHOE HOUSE WMC WASHING MACHINE


+3 ?
2655

JS JANITOR SINK

Ve ntusDo ub le Doo r
BOTT L E COOLER
+2

F 76 /2 00
V90
Ve ntusDo ub le Doo r
BOTT L E COOLER
ST STRAINER

F 76 /2 00
V90
TOILET (M)
TOILET (F)

Ve ntusDo ub le Doo r
BOTT L E COOLER
F 76 /2 00
V90
ORIENTATION ROOM

Ve ntusDo ub le Doo r
BOTT L E COOLER
F 76 /2 00
V90
MAJLIS LOBBY
CAFE SHOE HOUSE CV CHECK VALVE
ACCESSIBLE TOILET
?
FOR FUTURE CONNECTION
VESTIBULE
?
ICM ICE CUBE MACHINE
12845

1200x1200x1000

COLD CABINET PARKING


SPACE FOR HOT AND
FOR FUTURE CONNECTION
VALVE CHAMBER VW VEG. WASHER
CORRIDOR
VIP DINING
REFER TO DWG No. 1200x1200x1000
PC97/ 4
PREPTOP

CORRIDOR CORRIDOR VESTIBULE ?

VALVE CHAMBER KS KITCHEN SINK


PANTRY
A101-CEC-MH43-DWG-GF0108
?
PWM POT WASH MACHINE
+1 TOILET
TOILET MAINTENANCE CORRIDOR

DCV DIRECTIONAL CONTROL VALVE

STR STRAINER

IDF SV SOLENOID VALVE

? DEVOTEES COURTYARD

GSM PHASE-01 (MANDIR BUILDING) ?


22000

STORAGE ARRIVAL PAVILION 02


?
? ARRIVAL PAVILION 01 MAINTENANCE
PUMP ROOM CORRIDOR
?

STORAGE

0
0
0
7
.
0
4
.
2
2

I
S
S
U
E
D
F
O
R
T
E
N
D
E
R

A
K

A
V
TOURIST COURTYARD

? REV. DATE REVISIONS CHECKED APPROVED

O
W
N
E
R
:
MAINTENANCE CORRIDOR
?

BOH CORRIDOR
REFER TO DWG No. ?

A101-CEC-MH43-DWG-GF0109
-1 MEP ROOM + WATER CABINET PLUMBING SHAFT

ELECTRICAL ROOM FHC


FHC
CABINET FHC
ST-06 BABY'S ROOM BABY'S ROOM
CORRIDOR

E
L
V
S
P
E
C
I
A
L
I
S
T
CORRIDOR WATER PUMP ROOM
6500

CHWS/R SHAFT

TOILET (F)
PLUMBING SHAFT
GSM BOH CORRIDOR VESTIBULE CORRIDOR
CORRIDOR
LOBBY
ST-03
SHRIJIMCO TECHNICAL SYSTEMS FZC
-2 SHOE RACK STORE

P
.
O
.
B
o
x
1
6
1
1
1
SHOE STORE PL-01
ACCESSIBLE TOILET CLASS ROOM-01 CLASS ROOM-02 CLASS ROOM-03 VESTIBULE
FHC FHC

U
.
A
.
E
GSM

LOBBY

T
e
l
:
+
9
7
1
7
2
0
4
2
8
0
3
TOILET (F) MAJLIS (F)
9000

F
a
x
:
+
9
7
1
7
2
0
4
1
0
1
0
STORE
PRE-FUNCTION B
STORE SHOE RACK STORE
SHOE RACK SHOE RACK STORE MECHANICAL ROOM
ELECTRICAL ROOM
LOBBY
CORRIDOR MAJLIS (M)

L
I
G
H
T
I
N
G
C
O
N
S
U
L
T
A
N
T
TOILET (M)
CORRIDOR ELV ROOM
MAKE-UP AIR SHAFT RAMP
SHOE RACK SHOE RACK
ELECTRICAL ROOM IDF ROOM ELECTRICAL ROOM
CONTROL CUPBOARD SERVER ROOM
DIVIDER STORAGE MAKE-UP AIR SHAFT

-3 CORRIDOR
?

Studio Lumen
CLASS ROOM-04 CORRIDOR
? ACCESSIBLE TOILET
SHOE RACK ELECTRICAL ROOM

MEETING ROOM

BOH CORRIDOR
SHOE RACK CORRIDOR
ACCESSIBLE TOILET
9000

TOILET (F)

PUTM
.
OA
.E:b
B
o
x
7
3
8
8
9
,
D
u
b
a
i
,
TOILET (M)
STORAGE STORAGE
IT ROOM
CCC ROOM

eo
l
+0
95
76
19
44
38
34
85
53
86
0
6
MAKE-UP AIR SHAFT TOILET (M) CAFE
ELV ROOM
CONTROL CUPBOARD

:
ELECTRICAL ROOM
? OFFICE

-4
SHOE RACK STORE

? TOILET

LEAD CONSULTANT :

STAFF CHANGING ROOM (M)

STAFF CHANGING ROOM (F)


HANDWASH
HALL-B3
HALL-B1 PROJECTOR MAINTANENCE ACCESS
PROJECTOR MAINTENANCE ACCESS

ELECTRICAL ROOM
MAINTANENCE STAFF STAFF DINING
?
ARCHITECTURE, INTERIOR & LANDSCAPE
GSM PROJECTOR MAINTENANCE ACCESS 1100

MAKE-UP AIR SHAFT IDF PUMP ROOM


9000

TOILET (M)

TOILET (F)
MAINTENANCE WORKSHOP HOUSEKEEPING STORAGE

IDF ROOM IDF ROOM

ACTIVITIES OFFICE

BOH CORRIDOR (CLEAN) BOH CORRIDOR (CLEAN)


BOH CORRIDOR (CLEAN) BOH CORRIDOR (CLEAN)

320
V90 V90 V90 V90

320
Ve ntus Dou bl e Do or Ve ntus Dou bl e Do or Ve ntus Dou bl e Do or Ve ntus Dou bl e Do or

-5
BOTT L E COOLER BOTT L E COOLER BOTT L E COOLER BOTT L E COOLER
F 76 /2 00 F 76 /2 00 F 76 /2 00 F 76 /2 00

C D C D C D
CG CG CG

SHOE RACK FOR FUTURE CONNECTION CHAPATTI CHAPATTI


COLD KITCHEN

VEG PREP AREA

STAFF ENTRY AND CLOCK IN/OUT


4
3
7
.9
2

OO
MOB
R DP
R
C
E
T
L
1
0 U
E
?

BUILDING SERVICE CONSULTANTS :


MAIN KITCHEN

1
SHOE RACK

OO
MOB
R DP
R
C
E
T
L
1
0 U
E
9000

EP1440 G
0
.4
1

9
2
.8
4
M
O
BIL

EP1440 G
E

0
.4
1

CHILLER PUMP ROOM


M

REFER TO DWG No.


O
BIL
E

EP1440 G

0
.4
1
TROLLEY PARKING AREA

DIVIDER STORAGE
425

DIVIDER STORAGE

-6 BOH CORRIDOR (CLEAN)


EP1440G EP1440G

A101-CEC-MH43-DWG-GF0107
BOH CORRIDOR (CLEAN)

FLOOR GRAT ING


FROM PUMP ROOM
?
M

M
M

M
O

O
O

O
BIL

BIL

BIL
BIL

BIL

BIL
E

E
E

REFER TO DWG No.


GENERAL FREEZER

HOSE DOWN WASHING AREA


STORE
9000

STORE

ARCHITECT OF RECORD :
HEAVY DUTY RACKS

HEAVY DUTY RACKS


SIZE 2MTRX1.2MTR

SIZE 2MTRX1.2MTR
4 SHELVES

4 SHELVES

VEG CHILLER BOH CORRIDOR

A101-CEC-MH43-DWG-GF0106
MAKE-UP AIR SHAFT CHILLER
MAKE-UP AIR SHAFT HEAVY DUTY RACKS HEAVY DUTY RACKS HEAVY DUTY RACKS HEAVY DUTY RACKS
PRE-FUNCTION B HALL-A1 4 SHELVES 4 SHELVES 4 SHELVES 4 SHELVES
SIZE 2MTRX1.2MTR SIZE 2MTRX1.2MTR SIZE 2MTRX1.2MTR SIZE 2MTRX1.2MTR
EZ

? CHILLER PUMP PANEL


HEAVY DUTY RACKS

HEAVY DUTY RACKS

?
SIZE 2MTRX1.2MTR

SIZE 2MTRX1.2MTR
EZ
Front door

4 SHELVES

4 SHELVES

MAIN STORE/ DRY STORE


CHILLED GARBAGE BAKERY
Front side door

GENERALCENTRAL DISH WASH AREA CLEAN DISH/TRAY STORAGE AREA STORAGE


HEAVY DUTY RACKS HEAVY DUTY RACKS HEAVY DUTY RACKS
HEAVY DUTY RACKS

4 SHELVES 4 SHELVES 4 SHELVES


SIZE 2MTRX1.2MTR

SIZE 2MTRX1.2MTR SIZE 2MTRX1.2MTR SIZE 2MTRX1.2MTR


4 SHELVES

-7
HEAVY DUTY RACKS

HEAVY DUTY RACKS


SIZE 2MTRX1.2MTR

SIZE 2MTRX1.2MTR

200
4 SHELVES

4 SHELVES

REFER TO DWG No.


AW

EP1440 G EP1440 G

?
HEAVY DUTY RACKS

SIZE 2MTRX1.2MTR

FROM PUMP ROOM


4 SHELVES

9
3
2
1
.5

A101-CEC-MH43-DWG-GF0104
HEAVY DUTY RACKS
PRE-FUNCTION B HEAVY DUTY RACKS
4 SHELVES
4 SHELVES HEAVY DUTY RACKS
4 SHELVES SANITISING AREA
SIZE 2MTRX1.2MTR 0
2
9
5
.7

UPS ROOM SIZE 2MTRX1.2MTR SIZE 2MTRX1.2MTR

TO PUMP ROOM
STORAGE
DE-WATERING ROOM
9000

FHC
ST-01
BOH CORRIDOR

P
U
R
P
O
S
E
O
F
I
S
S
U
E
:
SHOE RACK SL-01
TEMPORARY REFUSE HOLDING AREA
SHOE RACK ELV ROOM
1
3
4
. 1
3
7
6
.4
2

LOBBY
ST-02 SL-02
GENERAL GARBAGE ELECTRICAL ROOM
DE-BOXING AREA
SORTING ROOM
TENDER SUBMISSION
-8
9
2
5
1
.4

LV ROOM

PB
RA
OP
JS
E
CH
TI
ND
AU
M
EM
:A
FIRE ALARM CHECK VALVE
ELECTRICAL ROOM BOH CORRIDOR
TOILET ?
FOR FUTURE CONNECTION

N
D
I
R
,
A
B
U
D
H
A
B
I
RECEIVING AREA

REFER TO DWG No.


AV/IT ROOM + CONTROL ROOM
BOH CORRIDOR (DIRTY)
STAGE
FOR FUTURE CONNECTION
ELECTRICAL ROOM

GREEN ROOM
9000

STORAGE
FCC ROOM TOILET

A101-CEC-MH43-DWG-GF0105
CLEAN AGENT ROOM STORAGE
ENTRANCE CORRIDOR

P
R
O
J
E
C
T
D
E
S
C
R
I
P
T
I
O
N
:
IDF ROOM

HV ROOM TRANSFORMER ROOM


1200x1200x1000 1200x1200x1000
GENERATOR ROOM
BATTERY AND FA ROOM-01
CORRIDOR
? STAIRCASE FOR MEZZANINE RECEIVING OFFICE MTR+GSM
VALVE CHAMBER UNDER GROUND TRENCH VALVE CHAMBER The Project is Spiritual Centre to Serve the Hindu Community and the
-9 ?
FHC

People of the UAE. Through the Universal Values of Love, Peace and
1200x1200x1000 Harmony with Buildings Surround the Temple
VALVE CHAMBER Ø100 TANKER INLET LINE
Ø100 TANKER INLET LINE FOR

D
R
A
W
I
N
G
T
I
T
L
E
:
IRRIGATION WATER TANK

O
V
E
R
A
L
L
G
R
O
U
N
D
F
L
O
O
R
W
A
T
E
R
L
A
Y
O
U
T
Ø150 MAIN INCOMING POTABLE WATER LINE

DN DN DN

Ø100 BREACHING INLET FOR NOTE:

DA
R1
A0
W1
I
N-
GC
NC
O
.-
:M
JA
O
B1
N0
O1
:
FINAL LOCATION OF THE WATER METER LOCAL AUTHORITY MAIN SHEET SIZE:

H
2
2
-
D
W
G
-
G
F
0
1
0
1
DOMESTIC WATER TANK REV NO. :
SHALL BE COORDINATED AS PER SITE WATER METER WITH WATER
Ø100 BREACHING INLET CONDITION MANHOLE CHAMBER A0 R0

D
R
A
W
N
B
Y
C
H
E
C
K
E
D
B
Y

A A
P V
P
R
O
V
E
D
B
Y
D
A
T
E
:

S
C
A
L
E
:
FOR IRRIGATION TANK
INCOMING DOMESTIC WATER
CONNECTION FROM ADDC MQS AK 07.04.22 As indicated

UNLESS OTHERWISE ADVISED, COPYRIGHT IN THIS DRAWING BELONGS TO


CAPITAL ENGINEERING CONSULTANCY(LLC) AND BAPS HINDU MANDIR . THIS
DRAWING MAY NOT BE REPRODUCED IN WHOLE OR IN PART, IN ANY FORM OR
MANNER WHATSOEVER, WITHOUT THE PERMISSION OF CAPITAL ENGINEERING
CONSULTANCY(LLC) AND BAPS HINDU MANDIR .

You might also like