Professional Documents
Culture Documents
Direct Cost:
Total Material Cost, Php 12,000,000.00
Labor Cost (30% of TMC), Php 3,600,000.00
Indirect Cost:
Freight (10% of TMC), Php 1,200,000.00
Contractor's Profit (10%) 1,560,000.00
VAT & BARMM Tax (5% + 1%) 1,101,600.00
Engineering & Admin Overhead (3%) 550,800.00
20% 3,120.00
10%
6%
3%
#REF! 40,024.80