Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.
dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 11:15 6/10/2022 15:15 4:00 128+128 110 221 210 196 N 211 107 15000
Type ESP
ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load
06-October-2022
2022/10/06 10:40 ESWT # 2 arrived on location well no : M-337
2022/10/06 10:41 Held safety meeting prior to rig up.
2022/10/06 10:43 Checked well Existing conditions :- WHP=210 psig .GC= 200 psig .
2022/10/06 10:45 Started spot equipment, commenced rig up .
2022/10/06 11:00 Completed rig up and started to perform pressure test.
2022/10/06 11:06 Completed pressure test for U/S and D/S @ 750 psig (OK).
2022/10/06 11:08 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
2022/10/06 11:10 Diverted flow to separator .
2022/10/06 11:13 Lowered 0.250" orifice plate into gas line.
2022/10/06 11:15 Started Flow measurements .
2022/10/06 11:30 128+128 110 220 195 102 209 410 0.941 76.00 31.804 0.868 78 35.76 113 1324 60000 76.3 1733.75
2022/10/06 11:45 128+128 110 220 195 102 210 459 0.941 74.00 31.014 0.868 68 35.79 103 1331 60000 74.4 1790.45
2022/10/06 12:00 128+128 110 219 193 103 209 437 0.941 76.00 30.083 0.868 69 35.62 104 1409 60000 76.3 1846.03
2022/10/06 12:15 N/A N/A 128+128 110 219 196 103 209 473 0.941 74.00 30.284 0.868 64 35.72 100 1370 60000 74.4 1842.83
2022/10/06 12:30 128+128 110 220 195 104 210 433 0.941 76.00 30.495 0.868 70 35.88 106 1396 60000 76.3 1828.52
2022/10/06 12:45 128+128 110 220 196 104 211 466 0.941 74.00 31.063 0.868 67 35.98 103 1352 60000 74.4 1817.83
2022/10/06 13:00 128+128 110 220 195 104 211 393 0.941 78.00 31.609 0.868 80 36.03 116 1421 60000 78.3 1814.20
2022/10/06 13:15 N/A N/A 128+128 110 221 197 104 211 460 0.941 74.00 31.926 0.868 69 36.07 105 1335 60000 74.4 1795.37
2022/10/06 13:30 128+128 110 221 197 104 211 424 0.941 76.00 32.196 0.868 76 36.10 112 1369 60000 76.3 1793.55
2022/10/06 13:45 128+128 110 221 197 105 212 458 0.941 74.00 32.221 0.868 70 36.15 107 1328 60000 74.4 1785.38
2022/10/06 14:00 128+128 110 221 198 105 211 424 0.941 76.00 32.435 0.868 77 36.13 113 1367 60000 76.3 1791.05
2022/10/06 14:15 N/A N/A 128+128 110 222 197 104 212 492 0.941 72.00 32.600 0.868 66 36.19 102 1290 60000 72.4 1782.20
2022/10/06 14:30 128+128 110 221 196 104 211 422 0.941 76.00 32.796 0.868 78 36.09 114 1362 60000 76.3 1783.57
2022/10/06 14:45 128+128 110 222 195 104 211 457 0.941 74.00 32.739 0.868 72 36.10 108 1326 60000 74.4 1782.90
2022/10/06 15:00 128+128 110 222 196 104 211 423 0.941 76.00 32.808 0.868 78 36.09 114 1365 60000 76.3 1788.56
2022/10/06 15:15 N/A N/A 128+128 110 222 197 104 212 456 0.941 74.00 32.627 0.868 72 36.17 108 1322 60000 74.4 1777.89
2022/10/06 15:15 End of test . Bypass separator .
2022/10/06 15:20 Started rig down surface lines.
2022/10/06 15:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
06-October-2022
2022/10/06 11:30 15 18.1 106 18.14 76.00 4.35 0.981 60 0.941 60 0.941 1.000 1.000 4.27 410.2 4.27 18.8
2022/10/06 11:45 30 36.9 106 18.74 74.00 4.87 0.981 60 0.941 60 0.941 1.000 1.000 4.78 459.1 9.05 18.8
2022/10/06 12:00 45 56.2 106 19.32 76.00 4.64 0.981 60 0.941 60 0.941 1.000 1.000 4.55 436.8 13.60 18.8
2022/10/06 12:15 60 75.5 107 19.29 74.00 5.02 0.981 60 0.941 60 0.941 1.000 1.000 4.92 472.5 18.53 18.8
2022/10/06 12:30 75 94.6 107 19.13 76.00 4.59 0.981 60 0.941 60 0.941 1.000 1.000 4.51 432.6 23.03 18.8
2022/10/06 12:45 90 113.6 107 19.03 74.00 4.95 0.981 60 0.941 60 0.941 1.000 1.000 4.85 466.1 27.89 18.8
2022/10/06 13:00 105 132.6 107 18.98 78.00 4.17 0.981 60 0.941 60 0.941 1.000 1.000 4.10 393.3 31.98 18.8
2022/10/06 13:15 120 151.4 107 18.79 74.00 4.89 0.981 60 0.941 60 0.941 1.000 1.000 4.79 460.3 36.78 18.8
2022/10/06 13:30 135 170.2 107 18.77 76.00 4.50 0.981 60 0.941 60 0.941 1.000 1.000 4.42 424.3 41.20 18.8
2022/10/06 13:45 150 188.9 107 18.69 74.00 4.86 0.981 60 0.941 60 0.941 1.000 1.000 4.77 457.7 45.97 18.8
2022/10/06 14:00 165 207.6 107 18.74 76.00 4.50 0.981 60 0.941 60 0.941 1.000 1.000 4.41 423.7 50.38 18.8
2022/10/06 14:15 180 226.3 107 18.66 72.00 5.23 0.981 60 0.941 60 0.941 1.000 1.000 5.13 492.2 55.51 18.8
2022/10/06 14:30 195 244.9 107 18.66 76.00 4.48 0.981 60 0.941 60 0.941 1.000 1.000 4.39 421.9 59.90 18.8
2022/10/06 14:45 210 263.6 107 18.66 74.00 4.85 0.981 60 0.941 60 0.941 1.000 1.000 4.76 457.1 64.66 18.8
2022/10/06 15:00 225 282.3 107 18.72 76.00 4.49 0.981 60 0.941 60 0.941 1.000 1.000 4.41 423.1 69.07 18.8
2022/10/06 15:15 240 300.9 107 18.61 74.00 4.84 0.981 60 0.941 60 0.941 1.000 1.000 4.75 455.8 73.82 18.8
2022/10/06 15:15 End of test . Bypass separator .
2022/10/06 15:20 Started rig down surface lines.
2022/10/06 15:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
2022/10/06 11:30 15 102 224 42 97.54 0.250 0.868 12.71 1.0733 1.0023 0.9619 1.0331 13.586 31.804 0.331 15000 11
2022/10/06 11:45 30 102 224 40 95.18 0.250 0.868 12.71 1.0733 1.0022 0.9615 1.0330 13.578 31.014 0.654 15000 11
2022/10/06 12:00 45 103 223 38 92.37 0.250 0.868 12.71 1.0733 1.0021 0.9612 1.0328 13.569 30.083 0.968 15000 11
2022/10/06 12:15 60 103 224 39 93.01 0.250 0.868 12.71 1.0733 1.0021 0.9610 1.0328 13.567 30.284 1.283 15000 11
2022/10/06 12:30 75 104 225 39 93.70 0.250 0.868 12.71 1.0733 1.0021 0.9605 1.0328 13.561 30.495 1.601 15000 11
2022/10/06 12:45 90 104 225 40 95.44 0.250 0.868 12.71 1.0733 1.0022 0.9604 1.0329 13.561 31.063 1.924 15000 11
2022/10/06 13:00 105 104 226 42 97.15 0.250 0.868 12.71 1.0733 1.0023 0.9601 1.0329 13.557 31.609 2.254 15000 11
2022/10/06 13:15 120 104 226 43 98.13 0.250 0.868 12.71 1.0733 1.0023 0.9600 1.0329 13.556 31.926 2.586 15000 11
2022/10/06 13:30 135 104 226 43 98.97 0.250 0.868 12.71 1.0733 1.0024 0.9599 1.0329 13.555 32.196 2.922 15000 11
2022/10/06 13:45 150 105 226 43 99.07 0.250 0.868 12.71 1.0733 1.0024 0.9597 1.0328 13.552 32.221 3.257 15000 11
2022/10/06 14:00 165 105 226 44 99.72 0.250 0.868 12.71 1.0733 1.0024 0.9597 1.0328 13.552 32.435 3.595 15000 11
2022/10/06 14:15 180 104 227 44 100.17 0.250 0.868 12.71 1.0733 1.0024 0.9601 1.0330 13.560 32.600 3.935 15000 11
2022/10/06 14:30 195 104 226 45 100.75 0.250 0.868 12.71 1.0733 1.0025 0.9603 1.0329 13.563 32.796 4.276 15000 11
2022/10/06 14:45 210 104 226 45 100.60 0.250 0.868 12.71 1.0733 1.0024 0.9601 1.0329 13.560 32.739 4.617 15000 11
2022/10/06 15:00 225 104 226 45 100.82 0.250 0.868 12.71 1.0733 1.0025 0.9600 1.0329 13.558 32.808 4.959 15000 11
2022/10/06 15:15 240 104 226 44 100.24 0.250 0.868 12.71 1.0733 1.0024 0.9602 1.0330 13.562 32.627 5.299 15000 11
2022/10/06 15:15 End of test . Bypass separator .
2022/10/06 15:20 Started rig down surface lines.
2022/10/06 15:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
6-Oct-2022
Eastern United Petroleum Services
SEQUENCE OF EVENTS
FLP (psi(g))
SP (psi(g))
0 0 0 0 0 0
11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00
October 06 2022 (Thursday)