Professional Documents
Culture Documents
S-300 Gor Test 06102022
S-300 Gor Test 06102022
INDEX
1.WELL TESTING DATA SUMMARY
7. SEQUENCE OF EVENTS
Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.
dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 06:15 6/10/2022 10:15 4:00 128+128 97 85 100 74 N 79 94 42000
Type SRP
ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load
06-October-2022
2022/10/06 5:40 ESWT # 2 arrived on location well no : S-300
2022/10/06 5:41 Held safety meeting prior to rig up.
2022/10/06 5:43 Checked well Existing conditions :- WHP=90 psig .GC= 80 psig .
2022/10/06 5:45 Started spot equipment, commenced rig up .
2022/10/06 6:00 Completed rig up and started to perform pressure test.
2022/10/06 6:06 Completed pressure test for U/S and D/S @ 750 psig (OK).
2022/10/06 6:08 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
2022/10/06 6:10 Diverted flow to separator .
2022/10/06 6:13 Lowered 0.250" orifice plate into gas line.
2022/10/06 6:15 Started Flow measurements .
2022/10/06 6:30 128+128 97 77 69 76 73 88 0.949 72.00 6.813 0.868 78 7.57 85 227 58000 72.1 315.09
2022/10/06 6:45 128+128 97 77 70 77 75 111 0.949 64.00 7.591 0.868 68 7.93 76 199 58000 64.1 309.69
2022/10/06 7:00 128+128 96 81 73 78 78 111 0.949 70.00 5.719 0.868 51 8.56 60 261 58000 70.1 372.62
2022/10/06 7:15 N/A N/A 128+128 96 85 75 80 81 130 0.949 60.00 6.624 0.868 51 9.14 60 197 58000 60.1 326.95
2022/10/06 7:30 128+128 96 84 73 82 79 90 0.949 72.00 5.365 0.868 59 8.81 68 234 58000 72.1 324.02
2022/10/06 7:45 128+128 96 84 73 84 79 125 0.949 60.00 6.733 0.868 54 8.85 63 188 58000 60.1 313.42
2022/10/06 8:00 128+128 96 86 74 85 81 93 0.949 70.00 4.665 0.868 50 9.19 59 219 58000 70.1 312.75
2022/10/06 8:15 N/A N/A 128+128 97 85 74 86 80 105 0.949 61.00 4.321 0.868 41 8.93 50 165 58000 61.1 269.68
2022/10/06 8:30 128+128 97 87 75 88 81 81 0.949 74.00 4.989 0.868 62 9.06 71 231 58000 74.1 312.00
2022/10/06 8:45 128+128 98 92 82 88 86 141 0.949 60.00 5.819 0.868 41 10.13 52 212 58000 60.2 352.66
2022/10/06 9:00 128+128 98 90 78 90 83 98 0.949 71.00 6.559 0.868 67 9.58 77 240 58000 71.1 337.99
2022/10/06 9:15 N/A N/A 128+128 99 86 74 91 79 111 0.949 60.00 5.056 0.868 46 8.74 54 167 58000 60.1 277.78
2022/10/06 9:30 128+128 98 85 73 92 79 106 0.949 64.00 5.729 0.868 54 8.80 63 190 58000 64.1 295.57
2022/10/06 9:45 128+128 99 85 72 91 79 86 0.949 70.00 5.029 0.868 59 8.67 67 201 58000 70.1 287.07
2022/10/06 10:00 128+128 98 85 73 91 79 131 0.949 60.00 6.112 0.868 47 8.72 56 197 58000 60.1 327.70
2022/10/06 10:15 N/A N/A 128+128 99 85 73 92 79 101 0.949 70.00 6.443 0.868 64 8.66 72 237 58000 70.1 338.60
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
06-October-2022
2022/10/06 6:30 15 3.3 92 3.29 72.00 0.92 0.995 60 0.949 60 0.949 1.000 1.000 0.92 87.9 0.92 17.6
2022/10/06 6:45 30 6.5 92 3.23 64.00 1.16 0.995 60 0.949 60 0.949 1.000 1.000 1.16 111.1 2.07 17.6
2022/10/06 7:00 45 10.4 93 3.89 70.00 1.17 0.995 60 0.949 60 0.949 1.000 1.000 1.16 111.4 3.23 17.6
2022/10/06 7:15 60 13.8 93 3.41 60.00 1.37 0.994 60 0.949 60 0.949 1.000 1.000 1.36 130.3 4.59 17.6
2022/10/06 7:30 75 17.2 93 3.38 72.00 0.95 0.994 60 0.949 60 0.949 1.000 1.000 0.94 90.4 5.53 17.6
2022/10/06 7:45 90 20.5 93 3.27 60.00 1.31 0.994 60 0.949 60 0.949 1.000 1.000 1.30 124.9 6.83 17.6
2022/10/06 8:00 105 23.7 93 3.26 70.00 0.98 0.994 60 0.949 60 0.949 1.000 1.000 0.97 93.4 7.81 17.6
2022/10/06 8:15 120 26.6 92 2.82 61.00 1.10 0.994 60 0.949 60 0.949 1.000 1.000 1.09 104.8 8.90 17.6
2022/10/06 8:30 135 29.8 93 3.25 74.00 0.85 0.994 60 0.949 60 0.949 1.000 1.000 0.84 80.8 9.74 17.6
2022/10/06 8:45 150 33.5 94 3.68 60.00 1.47 0.994 60 0.949 60 0.949 1.000 1.000 1.46 140.5 11.20 17.6
2022/10/06 9:00 165 37.0 94 3.53 71.00 1.02 0.994 60 0.949 60 0.949 1.000 1.000 1.02 97.6 12.22 17.6
2022/10/06 9:15 180 39.9 94 2.90 60.00 1.16 0.994 60 0.949 60 0.949 1.000 1.000 1.15 110.7 13.37 17.6
2022/10/06 9:30 195 43.0 96 3.09 64.00 1.11 0.994 60 0.949 60 0.949 1.000 1.000 1.10 106.0 14.48 17.6
2022/10/06 9:45 210 46.0 96 3.00 70.00 0.90 0.994 60 0.949 60 0.949 1.000 1.000 0.89 85.8 15.37 17.6
2022/10/06 10:00 225 49.4 95 3.42 60.00 1.37 0.994 60 0.949 60 0.949 1.000 1.000 1.36 130.6 16.73 17.6
2022/10/06 10:15 240 53.0 95 3.53 70.00 1.06 0.994 60 0.949 60 0.949 1.000 1.000 1.05 101.2 17.79 17.6
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
2022/10/06 6:30 15 76 88 5 20.80 0.250 0.868 12.71 1.0733 1.0007 0.9847 1.0155 13.649 6.813 0.071 42000 10
2022/10/06 6:45 30 77 90 6 23.18 0.250 0.868 12.71 1.0733 1.0008 0.9840 1.0157 13.644 7.591 0.150 42000 10
2022/10/06 7:00 45 78 93 3 17.48 0.250 0.868 12.71 1.0733 1.0004 0.9829 1.0161 13.629 5.719 0.210 42000 10
2022/10/06 7:15 60 80 96 4 20.27 0.250 0.868 12.71 1.0733 1.0006 0.9815 1.0165 13.616 6.624 0.279 42000 10
2022/10/06 7:30 75 82 94 3 16.46 0.250 0.868 12.71 1.0733 1.0004 0.9799 1.0160 13.585 5.365 0.335 42000 10
2022/10/06 7:45 90 84 94 5 20.69 0.250 0.868 12.71 1.0733 1.0006 0.9781 1.0158 13.560 6.733 0.405 42000 10
2022/10/06 8:00 105 85 96 2 14.36 0.250 0.868 12.71 1.0733 1.0003 0.9767 1.0159 13.538 4.665 0.453 42000 10
2022/10/06 8:15 120 86 95 2 13.32 0.250 0.868 12.71 1.0733 1.0002 0.9755 1.0156 13.516 4.321 0.498 42000 10
2022/10/06 8:30 135 88 95 2 15.41 0.250 0.868 12.71 1.0733 1.0003 0.9738 1.0155 13.493 4.989 0.550 42000 10
2022/10/06 8:45 150 88 101 3 17.95 0.250 0.868 12.71 1.0733 1.0004 0.9740 1.0164 13.508 5.819 0.611 42000 10
2022/10/06 9:00 165 90 98 4 20.27 0.250 0.868 12.71 1.0733 1.0005 0.9726 1.0157 13.482 6.559 0.679 42000 10
2022/10/06 9:15 180 91 94 3 15.66 0.250 0.868 12.71 1.0733 1.0003 0.9711 1.0149 13.448 5.056 0.732 42000 10
2022/10/06 9:30 195 92 94 3 17.76 0.250 0.868 12.71 1.0733 1.0004 0.9707 1.0149 13.444 5.729 0.791 42000 10
2022/10/06 9:45 210 91 93 3 15.58 0.250 0.868 12.71 1.0733 1.0003 0.9713 1.0148 13.450 5.029 0.844 42000 10
2022/10/06 10:00 225 91 94 4 18.93 0.250 0.868 12.71 1.0733 1.0005 0.9713 1.0149 13.452 6.112 0.908 42000 10
2022/10/06 10:15 240 92 93 4 19.97 0.250 0.868 12.71 1.0733 1.0006 0.9706 1.0148 13.442 6.443 0.975 42000 10
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
6-Oct-2022
Eastern United Petroleum Services
SEQUENCE OF EVENTS
FLP (psi(g))
900
SP (psi(g))
70 80 60 1200
800
60 80 70
50 1000 700
50 60
600
60 40 800
50
40 500
40 30 600
400
30 40
30 300
20 400
20
20 200
20
10 10 200
10 100
0 0 0 0 0 0
06:30 06:45 07:00 07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00 09:15 09:30 09:45 10:00
October 06 2022 (Thursday)