You are on page 1of 17

Eastern United Petroleum Services

WELL TEST REPORT


CLIENT Wafra Joint Operations (WJO)
CONTRACT JO/SA260/PO21
WELL S-300
S/C SC-19
DATE 06-Oct-2022

Eastern United Petroleum Services


Eastern United Petroleum Services

INDEX
1.WELL TESTING DATA SUMMARY

2.WELL TESTING DATA SHEET

3.OIL RATE CALCULATION SHEET

4.GAS RATE CALCULATION SHEET

5.DIFFERENTIAL PRESSURE CHARTS

6.SURFACE EQUIPMENT LAYOUT

7. SEQUENCE OF EVENTS

8. PARAMETERS CHART TRENDS

Eastern United Petroleum Services


Eastern United Petroleum Services

WELL TESTING DATA SUMMARY

Eastern United Petroleum Services


Field : WAFRA WELL TESTING UNIT
Well : S-300 Eastern United Petroleum Services
S/C : SC-19 WELL TESTING DATA SUMMARY Identification Number: EASTERN-02
Date : 6-Oct-2022 Operator name: Ronnie Montano

Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.

dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 06:15 6/10/2022 10:15 4:00 128+128 97 85 100 74 N 79 94 42000

Type SRP

ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load

psia Hz F amps V inch amps amps


168 4.9 N/A

Total GOR Specific Gravity Shrinkage CO2


Total Liquid Rate Total BS&W Gas Rate GOR1 Oil Rate Water Rate GOR2 Water Salinity
1+2 factor
Oil Gas
SG (1-Shrinkage)
bbl/d % Mscf/d SCF/bbl bbl/d bbl/d SCF/bbl SCF/bbl ppm SG @60 ºF %
(air = 1) @ 60 ºF
317.10 66.13 5.848 54.45 107.40 209.70 8.84 63.29 58,000 0.949 0.868 0.994 10.0
General comments:- S-300 has been flowing artificially by SRP through a 3"flowline.
Started flow period # 1 through fixed choke128+128/64".
The well was producing under stable conditions throughout the period of the test.
General comments
The data given here are the average readings of entire flow periods.
The test was witnessed by JO POD Engineer:- Mr.Saeed AL-Dossary.
Eastern United Petroleum Services

WELL TESTING DATA SHEET

Eastern United Petroleum Services


S-300
Unit EASTERN-02
WAFRA
6/10/2022 Data Sheet
BOTTOM HOLE WELL HEAD SEPARATOR OIL OR CONDENSATE GAS GOR WATER Total liquid rate
DATE Time
Pressure Temp. Choke WHT Tg.pres. Gc.pres. Temp. Press. Rate Gravity BSW Rate Gravity GOR1 GOR2 GORT RATE Salinity WLR RATE
yyyy/mm/dd hh:mm psia degF /64" degF psig psig degF psig BOPD g/cc % MSCFD Air=1 SCF/ bbl BWPD PPM % BBLS/D

06-October-2022
2022/10/06 5:40 ESWT # 2 arrived on location well no : S-300
2022/10/06 5:41 Held safety meeting prior to rig up.
2022/10/06 5:43 Checked well Existing conditions :- WHP=90 psig .GC= 80 psig .
2022/10/06 5:45 Started spot equipment, commenced rig up .
2022/10/06 6:00 Completed rig up and started to perform pressure test.
2022/10/06 6:06 Completed pressure test for U/S and D/S @ 750 psig (OK).
2022/10/06 6:08 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
2022/10/06 6:10 Diverted flow to separator .
2022/10/06 6:13 Lowered 0.250" orifice plate into gas line.
2022/10/06 6:15 Started Flow measurements .

2022/10/06 6:30 128+128 97 77 69 76 73 88 0.949 72.00 6.813 0.868 78 7.57 85 227 58000 72.1 315.09
2022/10/06 6:45 128+128 97 77 70 77 75 111 0.949 64.00 7.591 0.868 68 7.93 76 199 58000 64.1 309.69
2022/10/06 7:00 128+128 96 81 73 78 78 111 0.949 70.00 5.719 0.868 51 8.56 60 261 58000 70.1 372.62
2022/10/06 7:15 N/A N/A 128+128 96 85 75 80 81 130 0.949 60.00 6.624 0.868 51 9.14 60 197 58000 60.1 326.95
2022/10/06 7:30 128+128 96 84 73 82 79 90 0.949 72.00 5.365 0.868 59 8.81 68 234 58000 72.1 324.02
2022/10/06 7:45 128+128 96 84 73 84 79 125 0.949 60.00 6.733 0.868 54 8.85 63 188 58000 60.1 313.42
2022/10/06 8:00 128+128 96 86 74 85 81 93 0.949 70.00 4.665 0.868 50 9.19 59 219 58000 70.1 312.75
2022/10/06 8:15 N/A N/A 128+128 97 85 74 86 80 105 0.949 61.00 4.321 0.868 41 8.93 50 165 58000 61.1 269.68
2022/10/06 8:30 128+128 97 87 75 88 81 81 0.949 74.00 4.989 0.868 62 9.06 71 231 58000 74.1 312.00
2022/10/06 8:45 128+128 98 92 82 88 86 141 0.949 60.00 5.819 0.868 41 10.13 52 212 58000 60.2 352.66
2022/10/06 9:00 128+128 98 90 78 90 83 98 0.949 71.00 6.559 0.868 67 9.58 77 240 58000 71.1 337.99
2022/10/06 9:15 N/A N/A 128+128 99 86 74 91 79 111 0.949 60.00 5.056 0.868 46 8.74 54 167 58000 60.1 277.78
2022/10/06 9:30 128+128 98 85 73 92 79 106 0.949 64.00 5.729 0.868 54 8.80 63 190 58000 64.1 295.57
2022/10/06 9:45 128+128 99 85 72 91 79 86 0.949 70.00 5.029 0.868 59 8.67 67 201 58000 70.1 287.07
2022/10/06 10:00 128+128 98 85 73 91 79 131 0.949 60.00 6.112 0.868 47 8.72 56 197 58000 60.1 327.70
2022/10/06 10:15 N/A N/A 128+128 99 85 73 92 79 101 0.949 70.00 6.443 0.868 64 8.66 72 237 58000 70.1 338.60
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

OIL RATE CALCULATION SHEET

MEASUREMENT WITH METER

Vnet = Vo x OMF x ( 1 - Shr ) x K x (1 - BSW )

Vnet Corrected Oil Volume


Vo Volume of oil recorded by meter
OMF Meter factor
(Physical inaccuracy in meter when checked before the job with water)
Shrinkage Factor (1-SHR) is estimated based on KATZ Data.
K factor = 1 as KATZ table gives Shrinkage Factor already at 60 degF.

Eastern United Petroleum Services


S-300
WAFRA
06-October-2022 Oil Rate Measurement
DATE TIME METER OIL 1-Shr OIL GRAVITY Net volume Net STO Cumulative API
Time
cumul READING Temp Vs BSW V'O* Temp. Gravity Temp. Grav. 60°F OMF k of STO. Vo product. rate Production Gravity
Factor
yyyy/mm/dd hh.mm Mins bbl degF bbl % bbl degF g/cc degF g/cc bbl BOPD bbls at 60°F

06-October-2022

2022/10/06 6:30 15 3.3 92 3.29 72.00 0.92 0.995 60 0.949 60 0.949 1.000 1.000 0.92 87.9 0.92 17.6
2022/10/06 6:45 30 6.5 92 3.23 64.00 1.16 0.995 60 0.949 60 0.949 1.000 1.000 1.16 111.1 2.07 17.6
2022/10/06 7:00 45 10.4 93 3.89 70.00 1.17 0.995 60 0.949 60 0.949 1.000 1.000 1.16 111.4 3.23 17.6
2022/10/06 7:15 60 13.8 93 3.41 60.00 1.37 0.994 60 0.949 60 0.949 1.000 1.000 1.36 130.3 4.59 17.6
2022/10/06 7:30 75 17.2 93 3.38 72.00 0.95 0.994 60 0.949 60 0.949 1.000 1.000 0.94 90.4 5.53 17.6
2022/10/06 7:45 90 20.5 93 3.27 60.00 1.31 0.994 60 0.949 60 0.949 1.000 1.000 1.30 124.9 6.83 17.6
2022/10/06 8:00 105 23.7 93 3.26 70.00 0.98 0.994 60 0.949 60 0.949 1.000 1.000 0.97 93.4 7.81 17.6
2022/10/06 8:15 120 26.6 92 2.82 61.00 1.10 0.994 60 0.949 60 0.949 1.000 1.000 1.09 104.8 8.90 17.6
2022/10/06 8:30 135 29.8 93 3.25 74.00 0.85 0.994 60 0.949 60 0.949 1.000 1.000 0.84 80.8 9.74 17.6
2022/10/06 8:45 150 33.5 94 3.68 60.00 1.47 0.994 60 0.949 60 0.949 1.000 1.000 1.46 140.5 11.20 17.6
2022/10/06 9:00 165 37.0 94 3.53 71.00 1.02 0.994 60 0.949 60 0.949 1.000 1.000 1.02 97.6 12.22 17.6
2022/10/06 9:15 180 39.9 94 2.90 60.00 1.16 0.994 60 0.949 60 0.949 1.000 1.000 1.15 110.7 13.37 17.6
2022/10/06 9:30 195 43.0 96 3.09 64.00 1.11 0.994 60 0.949 60 0.949 1.000 1.000 1.10 106.0 14.48 17.6
2022/10/06 9:45 210 46.0 96 3.00 70.00 0.90 0.994 60 0.949 60 0.949 1.000 1.000 0.89 85.8 15.37 17.6
2022/10/06 10:00 225 49.4 95 3.42 60.00 1.37 0.994 60 0.949 60 0.949 1.000 1.000 1.36 130.6 16.73 17.6
2022/10/06 10:15 240 53.0 95 3.53 70.00 1.06 0.994 60 0.949 60 0.949 1.000 1.000 1.05 101.2 17.79 17.6
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

GAS RATE CALCULATION SHEET

GAS RATE MEASURED BY DANIEL ORIFICE PLATE METER


Reference is made to the rules and coefficients given in AGA gas measurement comittee report No 3
for orifice metering.
Q = C x SQRT( hw x Pf)
Q : Production rate at reference conditions.
C : Orifice flow coefficient.
hw : Differential pressure in inches of water.
Pf : Flowing pressure in psia.
C = Fu x Fb x Fg x Y x Ftf x Fpv
Fu : Unit conversion factor in desired reference conditions.
Fb : Basic orifice factor ( Q in Cu.ft / hour ).
Fg : Specific gravity factor.
Y : Expension factor
Ftf : Flowing temperature factor.
Fpv : Supercompressibility factor ( estimated ). Table of Fu factor
Reference conditions
Remarks: Units 60 deg.F 0 degC 15 degC 15 deg.C
Fm : Manometer factor is equal one since only bellows type meters are used. 14.73 psia 760 mmHg 760 mmHg 750 mmHg
Fr : Reynolds factor is considered to be one. Cu.ft / hour 1 0.9483 1.0004 1.0137
Fpv : All coefficients are taken from AGA NX 19 manual for natural gas Cu.ft / day 24 22.76 24.009 24.329
More accurate values could only be determined by laboratory measurement.
m3 / hour 0.02832 0.2685 0.02833 0.0287
m3 / day 0.6796 0.6445 0.6799 0.6889

Eastern United Petroleum Services


S-300

06-October-2022 WAFRA Gas Rate Measurement


Flowing SQR Orifice GAS Gas Production Cumul
DATE Time Cumul Pf Hw H2S CO2
Temp.
Hw * Pf Diameter Gravity Fb Fg Y Ftf Fpv C Rate Production
yyyy/mm/dd hh:mm Minutes degF psia " H2O Inches (air=1) MSCF/Day MSCF PPM %

06-October-2022 Gas Rate Measurement

2022/10/06 6:30 15 76 88 5 20.80 0.250 0.868 12.71 1.0733 1.0007 0.9847 1.0155 13.649 6.813 0.071 42000 10
2022/10/06 6:45 30 77 90 6 23.18 0.250 0.868 12.71 1.0733 1.0008 0.9840 1.0157 13.644 7.591 0.150 42000 10
2022/10/06 7:00 45 78 93 3 17.48 0.250 0.868 12.71 1.0733 1.0004 0.9829 1.0161 13.629 5.719 0.210 42000 10
2022/10/06 7:15 60 80 96 4 20.27 0.250 0.868 12.71 1.0733 1.0006 0.9815 1.0165 13.616 6.624 0.279 42000 10
2022/10/06 7:30 75 82 94 3 16.46 0.250 0.868 12.71 1.0733 1.0004 0.9799 1.0160 13.585 5.365 0.335 42000 10
2022/10/06 7:45 90 84 94 5 20.69 0.250 0.868 12.71 1.0733 1.0006 0.9781 1.0158 13.560 6.733 0.405 42000 10
2022/10/06 8:00 105 85 96 2 14.36 0.250 0.868 12.71 1.0733 1.0003 0.9767 1.0159 13.538 4.665 0.453 42000 10
2022/10/06 8:15 120 86 95 2 13.32 0.250 0.868 12.71 1.0733 1.0002 0.9755 1.0156 13.516 4.321 0.498 42000 10
2022/10/06 8:30 135 88 95 2 15.41 0.250 0.868 12.71 1.0733 1.0003 0.9738 1.0155 13.493 4.989 0.550 42000 10
2022/10/06 8:45 150 88 101 3 17.95 0.250 0.868 12.71 1.0733 1.0004 0.9740 1.0164 13.508 5.819 0.611 42000 10
2022/10/06 9:00 165 90 98 4 20.27 0.250 0.868 12.71 1.0733 1.0005 0.9726 1.0157 13.482 6.559 0.679 42000 10
2022/10/06 9:15 180 91 94 3 15.66 0.250 0.868 12.71 1.0733 1.0003 0.9711 1.0149 13.448 5.056 0.732 42000 10
2022/10/06 9:30 195 92 94 3 17.76 0.250 0.868 12.71 1.0733 1.0004 0.9707 1.0149 13.444 5.729 0.791 42000 10
2022/10/06 9:45 210 91 93 3 15.58 0.250 0.868 12.71 1.0733 1.0003 0.9713 1.0148 13.450 5.029 0.844 42000 10
2022/10/06 10:00 225 91 94 4 18.93 0.250 0.868 12.71 1.0733 1.0005 0.9713 1.0149 13.452 6.112 0.908 42000 10
2022/10/06 10:15 240 92 93 4 19.97 0.250 0.868 12.71 1.0733 1.0006 0.9706 1.0148 13.442 6.443 0.975 42000 10
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

DIFFERENTIAL PRESSURE CHARTS

Eastern United Petroleum Services


Eastern United Petroleum Services

SURFACE EQUIPMENT LAYOUT

Eastern United Petroleum Services


S-300
WAFRA

6-Oct-2022
Eastern United Petroleum Services

SEQUENCE OF EVENTS

Eastern United Petroleum Services


S-300
06-October-2022
WAFRA
Time
hh:mm
SEQUENCE OF EVENTS
06-October-2022
5:40 ESWT # 2 arrived on location well no : S-300
5:41 Held safety meeting prior to rig up.
5:43 Checked well Existing conditions :- WHP=90 psig .GC= 80 psig .
5:45 Started spot equipment, commenced rig up .
6:00 Completed rig up and started to perform pressure test.
6:06 Completed pressure test for U/S and D/S @ 750 psig (OK).
6:08 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
6:10 Diverted flow to separator .
6:13 Lowered 0.250" orifice plate into gas line.
6:15 Started Flow measurements .
10:15 End of test . Bypass separator .
10:20 Started rig down surface lines.
10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

PARAMETERS CHART TRENDS

Eastern United Petroleum Services


ESWT-02 | PARAMETERS CHART TREND
WELL NO. | S-300
110 2200
Legend CHOKE SIZE |128+128
120 160 140 WHP 1500
FLP
SP 100 2000
130 Total Fluids Rate 1400
110 Combined GORs
Gas Rate (Inst)
140 120 1300
90 1800
100
110 1200
90 120 80 1600
1100
100

Combined GORs (scf/bbl)

Total Fluids Rate (bbl/d)


Gas Rate (Inst) (Mscfd)
80 70 1400 1000
90
100
WHP (psi(g))

FLP (psi(g))

900
SP (psi(g))

70 80 60 1200
800
60 80 70
50 1000 700
50 60
600
60 40 800
50
40 500
40 30 600
400
30 40
30 300
20 400
20
20 200
20
10 10 200
10 100

0 0 0 0 0 0
06:30 06:45 07:00 07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00 09:15 09:30 09:45 10:00
October 06 2022 (Thursday)