PROYECTO: CAMBIO DE CUBIERTA Y MANTENIMIENTO DE LA CANCHA DE LA UNIDAD EDUCATIVA HERMANO MIGUEL”

UBICACION: UNIDAD EDUCATIVA HERMANO MIGUEL”

J503-841385
CRONOGRAMA VALORADO DE TRABAJOS PERIODOS (SEMANAS)
1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA
RUBRO DESCRIPCION UNIDAD CANTIDAD P. UNITARIO P. TOTAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MANTENIMIENTO Y PINTURA DE LA ESTRUCTURA METALICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 MANTENIMIENTO Y PINTURA PORTICOS DE PERFILERIA KG 5,161.06 0.59 3,045.03 456.75 761.26 761.26 761.26 304.50 0.00
2 PINTURA DE PERFILES DE ACERO EN CUBIERTA KG 2,814.40 0.29 816.18 0.00 0.00 0.00 81.62 489.71 244.85
PINTURA DE GRADERIO EXISTENTE 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 PINTURA DE CAUCHO ( DOS MANOS) M2 460.80 3.35 1,543.68 0.00 0.00 0.00 154.37 926.21 463.10
CUBIERTA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 DESMONTAJE DE CUBIERTA EXISTENTE M2 1,120.00 0.50 560.00 336.00 224.00 0.00 0.00 0.00 0.00
5 CUBIERTA GALVALUME O SIMILAR M2 1,120.00 16.38 18,345.60 0.00 1,834.56 8,255.52 8,255.52 0.00 0.00
SEÑALIZACION, ARCOS Y AROS, ILUMINACION 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 SEÑALIZACIONY PINTURA DE CANCHA ML 280.00 1.22 341.60 0.00 0.00 0.00 0.00 0.00 239.12
7 REPARACION DE LAMPARAS - CAMPANA CANCHA CUBIERTA PTO 6.00 133.37 800.22 0.00 0.00 0.00 0.00 0.00 560.15
INVERSION SEMANAL 25,452.31 792.75 2,819.82 9,016.78 9,252.77 1,720.42 1,507.22
AVANCE SEMANAL (%) 3.12 11.08 35.43 36.35 6.76 5.92
INVERSION ACUMULADA AL 100% (linea e=1p) 792.75 3,612.57 12,629.35 21,882.12 23,602.54 25,109.76
AVANCE ACUMULADO (%) 3.12 14.19 49.62 85.97 92.73 98.65
INVERSION ACUMULADA AL 80% (linea e=0.5p) 634.20 2,890.06 10,103.48 17,505.70 18,882.03 20,087.81
AVANCE ACUMULADO (%) 2.49 11.36 39.70 68.78 74.19 78.92
PLAZO TOTAL: 45

EGRE ING CIVIL MANUEL LLANO TENA, 09 DE OCTUBRE DE 2022


ELABORADO

----------------------------------------------------------------------------------------------------_x000D_ CAMBIO DE CUBIERTA


MIGUEL”

11
7 SEMANA
25 26 27 28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
102.48
240.07
342.55
1.35
25,452.31
100.00
20,361.85
80.00

----------------------------------------------------------------------------------------------------_x000D_ CAMBIO DE CUBIERTA

You might also like