You are on page 1of 1

Scenario 1- Horizontal Strutting

PROJECT : NSC - N106 Design : OYJ


Check : CCW
LOCATION : Qd2 Date : 24/7/19
SUBJECT : Toe Stability Check (Drained) BH RF : NB-063
Wall top : 104.80 RL(m) Strutted(1) or Cantilever(0) : 1 Uniform Load (1) or Strip Load(0) : 1 Slope angle = 0.0 degree

Excavation Depth : 34.50 m (b.g.l.) Lowest Strut or waler : 23.3 m (b.g.l.) Surcharge = 20.0 kN/m² Slope top : 104.80 RL(m)
GWL(active) : 0.00 m (b.g.l.) Wall friction ratio, / = 2/3 Moment capacity of Wall, Mw = 5700 kN-m/m Equivalent slope angle, = 0.0 degree

GWL(passive) : 34.50 m (b.g.l.) Wall adhesion ratio (undrained), cw/su = 1/2 Wall back incline 0.00 degree

Layer Material parameter Coeficient of earth pressure Active Side Passive Side Wall tip at RL. = 57.80 m
EL. Depth Soil t drain c' ' su Ka Kac Kp Kpc v u 'v qh a Pa ea Moment v u 'v p Moment Wall penetration = 47.00 m
o
RL(m) (m) Layer (kN/m³) condition (kN/m²) () (kN/m²) ' Cu ' Cu (kN/m²) (kN/m²) (kN/m²) (kN/m²) (kN/m²) (kN-m/m) (kN/m²) (kN/m²) (kN/m²) (kN/m²) (kN-m/m) = ( 12.50 ) m (below FEL)
104.8 0.00 P - 0.0 6.8 7 Moments are taken at lowest strut, RL 81.50 m
101.8 3.00 A FILL 18.5 d 0.0 25.7 - 0.339 - 3.72 - 55.5 30.0 25.5 6.8 45 78 1.9 0

101.8 3.00 P 18.5 u - - 20.0 30.0 20.0 30 F.O.S. = 1.17 > 1.0
98.8 6.00 A F2 18.5 u - - 20.0 - 2.45 - 2.45 111.0 60.0 51.0 20.0 82 168 4.7 0 (Resisting Moment / Driving Moment)

98.8 6.00 P 18.5 d 4.2 27.5 - 60.0 6.3 78 Earth Pressure Diagram
110
94.3 10.50 A GVI N=8 18.5 d 4.2 27.5 - 0.314 - 4.22 - 194.3 105.0 89.3 6.3 135 478 8.5 0 Total Lateral Pressure

94.3 10.50 P 18.5 d 4.2 27.5 - 105.0 6.3 135 104.8 104.8 Pore Water Pressure

83.8 21.00 A GVI N=8 18.5 d 4.2 27.5 - 0.314 - 4.22 - 388.5 210.0 178.5 6.3 268 2112 16.3 0

83.8 21.00 P 18.5 d 4.2 27.5 - 210.0 6.3 268 100


76.0 28.80 A GVI N=25 18.5 d 4.2 27.5 - 0.314 - 4.22 - 532.8 288.0 244.8 6.3 366 2473 25.1 4458
ACTIVE
76.0 28.80 P 18.5 d 4.2 27.5 - 288.0 6.3 366

70.3 34.50 A GVI N=25 18.5 d 4.2 27.5 - 0.314 - 4.22 - 638.3 345.0 293.3 6.3 439 2295 31.7 19357
90
70.3 34.50 P 19.0 d 4.2 28.4 - 345.0 6.0 435 0.0 0.0 0.0 18

Elevation RL. (m)


67.8 37.00 A GV N=35 19.0 d 4.2 28.4 - 0.302 - 4.50 - 685.8 370.0 315.8 6.0 467 1127 35.8 14053 47.5 25.0 22.5 144 2582
81.6
67.8 37.00 P 19.0 d 4.2 28.4 - 370.0 6.0 467 47.5 25.0 22.5 144

65.8 39.00 A GV N=35 19.0 d 4.2 28.4 - 0.302 - 4.50 - 723.8 390.0 333.8 6.0 492 959 38.0 14108 85.5 45.0 40.5 245 5752 80

65.8 39.00 P 19.0 d 4.2 28.4 - 390.0 6.0 492 85.5 45.0 40.5 245

62.3 42.50 A GV N=80 19.0 d 4.2 28.4 - 0.302 - 4.50 - 790.3 425.0 365.3 6.0 537 1801 40.8 31472 152.0 80.0 72.0 422 20543

62.3 42.50 P 25.0 d 4.2 39.8 - 425.0 3.7 492 152.0 80.0 72.0 867 70 68.7 68.7

57.8 47.00 A GIV 25.0 d 4.2 39.8 - 0.183 - 10.55 - 902.8 470.0 432.8 3.7 549 2344 44.8 50366 264.5 125.0 139.5 1624 121519

PASSIVE
59.8
60
P : passive side d : drain SUM= 133814 SUM= 150396

A : active side u : undrain FOS= 1.174

4.5m
(1) Hydrostatic groundwater distribution used drain material 50
-600 -100 400 900
(2) Ka used BS8002 method, Kp used BS8002 method Pressure (kN/m²)
(3) Kac=Kpc=2*(1+cw/su)^0.5

F:\385442-Singapore\Detailed Design\Geo Plaxis\Section Qd\1.0 Toe Stability Check\Copy of N106 Qd2 Dwall - ToeSTB FINAL with bermQd DD in GIV Ver 2.0 Mott MacDonald Singapore Pte Ltd