296 UMotorsport 220805 CostExplanation
296 UMotorsport 220805 CostExplanation
SEASON 2021/2022
TABLE OF CONTENTS
ABSTRACT....................................................................................................................................................... 3
BIBLIOGRAPHY............................................................................................................................................. 18
ABSTRACT
63 Assemblies
Parts: 284 Complexity of
Manufacture
10% ReUsed assemblies for his
16% process
Usual Manufacture
Complex Assembly
Buy
32%
57
New Parts
42% 6
87%
Of the materials used in
the manufacture as of the
Stocktaking 2021
CURRENT COST INDICATORS
2
For the correct calculation of manufacturing and process costs, we must take into account
beforehand the current economic scenario in which we find ourselves. That is why we
establish these indicators as a guide when establishing the final price of these processes.
8,4%
economic turmoil due to various events that
have taken place in the world, which not only
affect the global economy, but also Spain. This
means that, as of April 2022, the inflation rate or
better known in Spain as IPC (Consumer Price
Index) has increased by 6.2%, reaching an
inflation rate of 8.4%.
This macroeconomic data is indicative, not only
for the increase of the materials used for the
manufacture of the prototype, but also for the
consumption of the general services used for the
execution of the prototype.
5,3%
various sectors (primary, secondary and tertiary),
we highlight the increase of:
- 4.3% on energy consumption
- 0.3% for industrial goods
- 0.7% on services
Taking into account the continuous use of these
services for the achievement of the processes, it
is envisaged that the use of any of these will
On budget
comprise an increase of:
20%
In conclusion, the calculation of the
increase in the cost of production taking
into account the above data, also taking
into account the increase in variable costs,
such as energy and the operation of capital
goods, gives us a result of an increase of
On process costs
OTHER MAIN INDICATORS
Other factors to be taken into account in terms of the relationship between processes and
costs are those related to business liquidity, as well as the level of trade credit negotiations
with our suppliers..
28 21
Suppliers PYMES
From the current number of suppliers that provide us with all the materials necessary for the
implementation and running of all the processes, we have identified that 21 of these 28 suppliers are
Small and Medium Enterprises; which translates into less bargaining power due to the fact that these
companies have less financial muscle when it comes to granting commercial credits to customers for
the supplies given.
To reflect data on trade credits granted on the supplies given, we can see:
Commercial
Credit Granted: 3
As we can see, of the 15 suppliers of
materials and supplies throughout the
manufacturing execution, only 3
companies have granted commercial
15
credits for the payment of these.
This means that, if the project budget
had a lower liquidity status, the delays
in meeting cash payments significantly
affect the continuity of all the
manufacturing processes: from the
manufacture of parts to the complete
assembly of the whole prototype.
Cash
Payments: 12
SE 84LV HEC UD
1.148,00 1 u. 1.148,00€
Prepreg 150 - 600g/m2
160g/m2 – 1100 mm
Commercial sample
Carbon Fiber + Fiberglass
Plate 1,52€ 6 u. 9,12€
50 x 50 x 2,5 mm
16x1,5 – 6m
STEEL
Stocktaking 2021
Aluminium Plate
53,96€ 1 53,96€
80x150x220
Aluminium Plate
32,66€ 1 32,66€
100x110x140
Purplak Polyurethane Foam
Stocktaking 2021 200,21€
Sheet 80kg/m3
MATERIALS
MOULDS
Catalyst X-8
Poly Vinyl
1 u. 9,08€ 9,08€
OTHER MATERIALS
Alcohol (PVA
Acrylic Varnish
BESA 2C 34,91€ 2 u. 69,82€
BRILLIANCE
FASTENERS PRICE BASE
TU-HEX-DIN934-I8I-
0,06€ 80 u. 4,80€
LL13-(A2K)-M8
TU-HEX-DIN934-I8I-
0,08€ 6 u. 0,48€
LL19-(A2K)-M12
NUTS
TU-HEX-DIN439-B-
0,03€ 16 u. 0,48€
A2-LL7-M4
TU-HEX-DIN934-I6I-
0,03€ 78 u. 4,68€
LL10-(A2K)-M6
TU-HEX-DIN934-
0,08€ 2 u. 0,16€
I10I-LL16-(A2K)-M10
TOR-ISO4762-12,9-
0,23€ 80 u. 18,40€
LL6-M8x30
TOR-ISO4762-12,9-
0,24€ 2 u. 0,48€
(A2K)-M10x30
TOR-ISO4762-10.9-
0,26€ 12 u. 3,12€
10-(A2K)-M12X130
TOR-ISO4762-12,9-
0,19€ 78 u. 14,82€
LL5-M6x20
CIRCLIP ASEG-
0,48€ 20 u. 9,60€
DIN472-J-28x1,2
OTHERS
BRIDLE NYLON 66
0,13€ 60 u. 7,80€
300mm x 4,8mm
BRIDLE NYLON 66
0,14€ 60 u. 8,40€
300mm x 9mm
1 MOULD PREPARATION
La preparación de los moldes comprende diferentes fases que relatamos a
continuación:
Power for
Cost of Machine 5.700€ 3,2 Kw
operation
Average
Anual Depreciation 570€ 152,80€
Price / hour
STEP 3: MOULD ASSEMBLY
Polyurethane Adhesive
5 u. x 6,80€ 34€
600gr.
Sanding
Process
SANDING MACHINE BOSCH PSM 100A
Bicomponent car
1 u. 22,80€
rigging KSMOS
Cheamlease
1 u. 14,46€
Mould Cleaner
3u. x
Sanding Sheets 12,27€
4,09€
Poly Vinyl
1 u. 9,08€
Alcohol (PVA
Scisorss 1 u. 3,90€
Cutter 1 u. 5,20€
STEP 2: LAMINATION
Prepregs are laided in the pattern and compacted
with carbon fibre knives. Sequential layers are
placed until the final lay-up thickness is achieved.
SE 84LV HEC UD
1 u. 1.148,00€
Prepreg 150 - 600g/m2
STEP 3: VACCUM BAGGING
Vacuum bag is used to ensure all plies are
compacted to avoid delamination inside the
material, and to press the material into the mould
to achieve the best precision copy.
Materials over the prepreg are:
- Bleeder: to avoid resin filtrations
- Breather: to allow air to escape through the
bag and to exert homogeneous pressure in
the component
- Vacuum bag: to avoid vacuum leaks
- Putty tape: to bond the vacuum bag to the
mould or to itself to achieve an entrapped
air volume
COST CURE
Cheamlease Mould
1 u. 14,46€
Cleaner
SE 84LV HEC UD
1 u. 1.148,00€
2
Prepreg 150 - 600g/m
STEP 8: DEBULK
Debulk is used after the first ply. It is a cold vacuum bagging
process that compacts the initial layer into the mould, but without
curing it.
COST CURE
SE 84LV HEC UD 1
1.148,00€
Prepreg 150 - 600g/m2 u.
STEP 10: 2º CURE
As the previous curing, the first skin is cured to
achieve a solid component. Difference with the
pattern exists as now a peel ply is used to
achieve a suitable bonding surface for the core.
COST CURE
Acetone 1 u. 6,96€
es.cdn.ampproject.org/v/s/www.eleconomista.es/economia/amp/11801776/Los-costes-de-las-
pymes-subieron-un-23-en-el-primer-trimestre-de-
2022?amp_gsa=1&_js_v=a9&usqp=mq331AQKKAFQArABIIACAw%3D%3D#amp_tf=Da
%20%251%24s&aoh=16594383891847&referrer=https%3A%2F%2Fwww.google.com&sha
re=https%3A%2F%2Fwww.eleconomista.es%2Feconomia%2Fnoticias%2F11801776%2F06
%2F22%2FLos-costes-de-las-pymes-subieron-un-23-en-el-primer-trimestre-de-2022.html
Stirling, C., & Harumi Ichikura. (2021, November 26). Fastest Inflation in Euro’s History Set to
Raise Pressure on ECB. Bloomberg.com; Bloomberg.
https://www.bloomberg.com/news/articles/2021-11-26/fastest-inflation-in-euro-s-history-set-
to-raise-pressure-on-ecb
La inflación en la zona euro en 2021 y 2022: subyacente y regresiva, pero aún no desbocada -
Center for Economic Policy - EsadeEcPol. (2022, January 19). Center for Economic Policy -
EsadeEcPol. https://www.esade.edu/ecpol/ca/blog/2021-un-ano-marcado-por-la-inflacion/
Garrido, H. M. (2022, April 28). La inflación baja al 8,4% por el abaratamiento de luz y
gasolinas... pero la cesta de la compra sigue encareci. Www.20minutos.es - Últimas
Noticias; 20minutos. https://www.20minutos.es/noticia/4991974/0/inflacion-abril-bajada-
gasolinas-luz/
Yumpu.com. (2014). C M Y CM MY CY CMY K - Gurit. Yumpu.com.
https://www.yumpu.com/en/document/view/28494270/c-m-y-cm-my-cy-cmy-k-gurit