Required documents and Urgent works

1. Visit Local DoE office (October 15-16)


2. Reconnaissance survey
a. Preliminary field visit
b. Physical data collection
c. Flora fauna data collection
d. Understanding project area
3. ToR preparation (by Oct. 20)
4. Quality Testing: (by November 10)
a. Water Quality
b. Air Quality
c. Nose Quality

Required Documents:

1. Data: Water depth and DEM (Detailed Elevation Modeling) of Jetty point river, Sedimentation
data of last few years, Soil testing report/ soil data, wave data/report at jetty point or near to
jetty, Traffic survey data
2. Maps: Locational Map, Mouza map (Locating project area), Survey map, existing features map
etc. Process diagram for waste disposal, Process map for jetty related activities
3. All design and drawing of Jetty showing waste management and location of service building,
safety security functions, architectural design, drainage plan, fecal sludge management plan etc.

Required Preliminary Money: around 2- 2.5 lac