800.0
400.0 400.0
200.0 200.0 100.0 300.0

G G
Urugan Pasir Dibawah Pondasi (Di Padatkan)
Pas.Batu Kosong
200.0

200.0
P3 Pas.Pondasi Batu Kali,SP.1:4
-
Sloof Beton Bertulang 20cm x 30cm (Camp.1:2:3)
Pas.Dinding Batako (Trashram)
F F Pas.Dinding Batako Cetak t=8cm, SP.1:4
Plesteran t=2cm, Camp.1:4+Acian+Finishing Cat 2x
Urugan Tanah Pilihan (Peninggan Lantai)
P2
200.0

200.0
- Urugan Pasir Dibawah Lantai t=5cm (Di Padatkan)
P4 Cor Lantai Beton t=8cm, Camp.1:3:5
Plesteran Lantai t=4cm, Camp.1:4

350.0
-

E E Pas.Lantai Keramik 60cm x 60cm

150.0
1000.0

1000.0
12
300.0

D D
P1
-

150.0

300.0
C P5 C
-

150.0
300.0

584
B B

150.0

27
A A

150.0 150.0 100.0

60
100.0 300.0

300.0 100.0

300.0 300.0 100.0

5 15
800.0

1 2 3 4 5 6 7 9 10

30
10 70 10

90

Denah Rencana
Pondasi Det.P1
Skala 1:100 Skala 1:30

KEGIATAN PEKERJAAN LOKASI MENGETAHUI MANYETUJUI PERENCANA NAMA GAMBAR

Rencana Pondasi Dan Detail Pondasi


...... ..... ...... ..... .... ...... ..... NO. LEMBAR JML. LEMBAR KODE SKALA
....... ....... .......
00 00 AR-000 1.100
KETERANGAN: