You are on page 1of 4

Puentes

Bridge Engineering

Recapitulación

Summary

Joan Ramon Casas


Gonzalo Ramos
José Turmo
LONGITUDINAL TYPE- MAXIMUM SPAN

Span (m)

Type

s. sup.

Cont.
Const.
Cont.
Variable

Frame

Arch

Cable-
Stayed

Susp.
Cross-section type vs. Maximum span

Span (m)
Section
Beam

RC SLAB

PC SLAB
Massive

Voided

H= var.

Box
H = Const

H = var.
TOTAL BRIDGE LENGTH (m)
Const.
Method

Precast b. fact.
Precast b. in situ

Scaffolding
Total length

Span-by-span
- conv.
- beam+sup.
Market conditions
- mov. Gantry Renting Buying

Launching

Bal. Cantilever

Precast segments
Renting of Specific
equipment equipment

You might also like