Professional Documents
Culture Documents
700 Type 5D
700 Type 5D
UL
®
LISTED EX5092
Fire Protection
700E Type 5D Hydraulically-Controlled Deluge Valve with HRV
Operation
The Bermad Model 700E Type 5D is suited for hydraulic remote-control systems with wet pilot line. Quick opening
response is controlled by remote hydraulic release, boosted by local release, of upper chamber pressure.
The 700E Type 5D is held closed by pressure applied to the upper chamber ➊ of the main valve. The closed valve
prevents the water or water-foam from entering the system until the pressure is released from the upper chamber.
In the SET condition, the water pressure, supplied through the restricted priming line ➋, is trapped in the main
valve’s upper chamber, by a check valve ➌ and a normally held closed HRV ➍ (Hydraulic Relay Valve). The HRV is
held closed by the maintained pressure in the wet pilot line ➎.
The typical detection system, including a release system with a wet pilot line and closed release systems, is installed
in a remote location and connected to the valve trim. The trapped water pressure holds the HRV closed and thus the
seal-disc of the main valve is held to the valve seat ➏. Sealing is drip-tight and the system piping is dry.
In a FIRE or TEST condition, water is released from the upper chamber, either by the opened HRV (upon pressure
drop in the wet pilot line) or by the manual release ➐. Water exits the accelerator ➑ faster than it can be supplied to
the upper chamber, allowing the main valve to open and water to flow into the system piping and to the alarm device.
For information on installation and maintenance, see BERMAD publication "700E Type 5D IOM".
➎
➌ ➍ ➑
➋
➐
to drain
➊
➏ to alarm
Valve Closed
(set condition) Valve Open
(operating condition)
Te n d e r S p e c i f i c a t i o n s
The deluge valve shall be UL-listed as a unit, "Y" pattern (or angle), with automatic reset.
Valve actuation shall be accomplished by one moving assembly, which shall include a flat seal-disk and a
stainless steel stem.
The valve seat shall be made of stainless steel and have an unobstructed flow path, with no stem guide or
supporting ribs.
The control trim shall be factory pre-assembled and integrated to the main valve, hydraulically-tested, UL-listed
and supplied as an assembly consisting of:
• HRV, (Hydraulic Relay Valve) UL-listed
• Spring-loaded check valve
• Strainer and accelerator
• Manual emergency release assembly with stainless steeel bracket
• Non-corrosive trim of uniform metal, neither steel nor galvanized piping is permitted
The manufacturer shall be certified according to ISO 9001 standards
Fire Protection
Hydraulically-Controlled Deluge Valve with HRV 700E Type 5D
System Components*
1 - Main Valve, BERMAD 700E Series
Basic Trim, includes "B" Items as listed(1)
2B - Accelerator & Priming Restriction
3B - Orifice assembly
4B - Priming Strainer
7B - Check Valve
15B - Manual Emergency Release
18B - Priming Valve
19B - Drip Check W
26B - Hydraulic Relay Valve (HRV)
Additional Accessories – "A" Items(2)
1A - Alarm Test Valve
2A - Gauge Valve
3A - Pressure Gauge
5A - Drain Valve
11A - Alarm Valve
14A - Check Valve 3A 11A
Optional
1
W - Water Motor Alarm 14A
19B
1A
2A 3A
5A
2A
18B 4B 7B 2B
26B
15B
UL-Listed
The BERMAD Model 700E Type 5D
is UL-listed as a unit when installed Hydraulic
with specific components and accessories.
Atmosphere
* Notes:
1. "B" items are standard trim components provided in the trim package.
2. "A" items are additional trim components required for the proper installation and use of the deluge system.
Fire Protection
700E Type 5D Hydraulically-Controlled Deluge Valve with HRV
Specifications
PROV PROV
PROV
Tl Tl
Th Th
Ly
Ly Dv
Hh
Inlet
Inlet Inlet Inlet
Th Tb Tb Tw La Tl
Tw Dv
Ly Tl
TI 200 77/8 200 77/8 170 63/4 165 61/2 160 65/16 140 51/2 130 51/8
Tw 317.5 121/2 329 1215/16 340 133/8 351.5 1313/16 400 153/4 435 171/8 480 187/8
h 82 34/16 102 4 102 4 127 5 152 6 203 8 219 85/8
Th 390 153/8 401 1513/16 464 181/4 517 203/8 645 253/8 736 29 841 331/8
Tb 258 103/16 269 109/16 280 11 292 111/2 320 125/8 350 1313/16 382 151/16
Dv 3/4” 11/2” 11/2” 2” 2” 2” 2”
Notes:
1. Provide adequate clearance around valve for maintenance. 4. Data is for envelope dimensions. Specific component positioning may vary.
2. Listed trim dimensions are maximum. 5. For complete dimensions of 700E main valve, see BERMAD
3. Tw = maximum trim width for both "Y" and angle patterns. publication "700E Basic Deluge Valve"
Materials
Manufacturers Standard Materials Optional Materials
Main valve body and cover Main valve body and accessories
• Ductile iron ASTM 536(1) • Stainless steel 316
• Carbon steel ASTM A216-WCB(1) • Marine bronze
Main valve wetted parts (internals) • NiAl-bronze
• Stainless steel 304 and coated steel • Titanium
Control Trim System • Duplex and Super-duplex
• HRV: Brass ASTM B21 Main valve and accessories internals
• Forged brass fittings & copper tubing • Stainless steel 316
Elastomers • Bronze
• NBR • Titanium
• Copper-nickel
Notes: • Hastalloy
1. Epoxy coated, fusion bonded - standard. Other coatings available on Tubing and Fittings
request. • Stainless steel 316
2. For seawater service see BERMAD publication "Seawater and Corrosive
Media".
• Copper-nickel
© Copyright 1999 by BERMAD Control Valves www.bermad.com The information contained in this document is subject to
Cat # PC7PE17 ver 4/00 change without notice. BERMAD shall not be liable for any
English E-mail: info@bermad.com errors contained herein. All rights reserved.