a fia QUALITY MEMO NOTICE (QMN)
‘Area
Discipiine
Activity Observed __| Matorial Receiving Inspection Wall Control Bullaing
Reference, {JTB-SF-C-SPE-S00-00017 Specification for Concrete Design And Construction
Description of noncor
Dati hasil observasi kami, telah ditemukan Material Wall Control building yang mengalami Retak seat
Inspesksi pada
1. Wall POWW-14 (Controt Building)
2, Wall PCWW.24 (Control Building)
Correction implemented
Tdentified Cause (=)
(A materia 1 wecrine =) menos «= Man
Corrective Action Taken to prevent recurrence
‘VENDOR / SUBCONTRACTOR
PT. Swadaya Cipta / PT. BEP
PART 2.~ FOLLOW-UP AND CLOSE-OUT
Review to Corrective Action Result
Verification Document(s): (add documents as atlachmants 7 apancabTe)
RESULT INSPECTOR
[1 ettectve cate cosy
Stil have risk failure, Issue Now
Name [bateoe, oe
ae
TNoIoas SIA WOL108
ee por eee or
FTG) + oomacos soe tao
or oon
=e
wu
SVERE NIA Yova warns
SIN NOSS
sad
4] i] cas”
Oe
(Demee (yam eere ————SSSS
a
ns ane
= MaINWOLLOR
TNoudas — = oF
ce es oes Parr}
{mpi ee | wee OTT
i ava man ove SIA NOB xucoe
ee) ES NS am al man 308
Se) reese a wr "Or Face wr a oor Ewa
joes eee 5) Sq ee T] eRe
; § — § € &| PEE
L eas He
1 =| ee 2 {Te
g =a 8 & = Lit
B BOE HERE Lee -— we TT
= we] it 8 a the
§ é ese Fe
| =. Ell
| F é é 2 EEE 3
wees | § F___—_! =a :
.
he
* F
_ tie
ate
re
Gg
£1
al
8GAS DEVELOPMENT PROJECT a
ere FOR THE UNITZATION OF fa i
siamgas _FPrewir ve THE JANBARAN-TIUNG BIRU FIELD ae ot
— GT-R anternTng BiT
Dita Protog
1. POWW.24 (Wall Control Building) 2, POWW-24 (Wall Control Building)
3. PEWW.24 (Wall Control Building) 4, POW W414 (Wall Controt Building)
| 5, PEWWE-11 (Wall Control Building) 6, POWW-14 (Wall Control Bullding)
: a