W.O.NO:SBU-PG/TSTPP-RAMAGUNDAM/100045/22627 Dated:16-09-2021
Name of Agency: S.K.
Billing Period: 01-09-2021 to 30-09-2021
RA bill :-02
1 Excavation (Manually):-
a) Excavation for Plinth Drain MCC-C 1 7.500 1.000 0.450 3.375 Cum
b) Excavation for G.slab Extended part TP-42 1 7.400 0.300 0.700 1.554 "
c) Excavation for Bitumen work CR-16 (Soil Overburden) 10 1.500 1.500 0.550 12.375 "
e) Excavation for Plinth Drain TP43 Grid A'3-C3 1 17.500 0.910 0.350 5.574 "
g) Excavation for Plinth Drain TP42 Grid C'3-E3 1 10.550 0.910 0.510 4.896 "
h) Excavation for Soling Conveyor47 A Segment 15 grid 6-13 4 7.700 2.700 0.285 23.701 "
i) 0.000
0.000
2 Sludge Cleaning :-
a) G.slab Extended part TP-42 for Brickwork PCC 1 17.475 0.34 1 5.942 Sqm
b) Cable pullpit MCC-C Raft PCC MH06&07 2 2.1 2.1 1 8.820 "
c) " MH04&05 2 2.55 2.55 1 13.005 "
3 Backfiling (Manually):-
a) Conveyor 47A Segment 16 Grid 1-9 9 7.7 2.7 0.35 65.489 Cum
b) "
c) "
5 Hard Barrication:-
a) Pullpit Near TP-43 2 10 1 1 20 Cum
b) " MCC-C 2 10 1 1 20 "
c) HGTUS 1 15 1 1 15
d) Pullpit TP42/CR13A 1 10 1 1 10
e) W.shop Building 1 65 1 1 65
7 Scaffolding:-
a) HGTUS for Concreting 4 2 2 2 32.000 Cum
b) Switchgear Room MCC-C 1 17 1 5 85.000
c) Control Room For Ceiling Paint 1 5 2.5 4.5 56.250
d) External Side of MCC-C for Plaster repair 3 4 1.5 5 90.000
8 Shifting of Steel
Item code Description of item Unit BOQ qty Rate Amount Quantity Amount
Previous bill This bill Up to date Previous bill This bill Up to date
Excavation (manual) in all kind of soils up to depth of 2mts from ground level
LA0299540614 Cum 250.00 450.00 112,500.00 171.07 68.96 240.03 76,980.15 31,032.00 108,012.15
including labour,tools,lead and lifts etc.complete
OA09999852138 Labour Charges for removal of slush including dressing for PCC preparation Sqm 750.00 140.00 105,000.00 740.00 0.00 740.00 103,600.00 - 103,600.00
Laying approved dry stone rubble soling 230 mm thick below grade slabs,
plinth protection, and at other locations, set in regular lines, interstices
LB0499540054 thoroughly filled with small chips and compacted by hand rollers after Cum 900.00 250.00 225,000.00 68.00 192.00 260.00 16,999.00 48,000.00 64,999.00
spreading 12mm layer of grit on top, etc., complete, as indicated in
drawings, specification and as directed by the ENGINEER
OA0999850484 Labour Charges for hard barricading fixing rm 500.00 45.00 22,500.00 145.00 130.00 275.00 6,525.00 5,850.00 12,375.00
Providing 12mm thick plain faced cement plaster in cement mortar 1:3 for
RCC, brick work/block work sides and undersides of slabs, canopies,chajjas
HP0099541635 with drip moulding,etc. including scafolding ,curing ,hacking of concrete Sqm - 210 0.00 0.00 0.00 - - -
surfaces where required etc, complete per specification (Bricks,
cement,sand and scafolding aterials free issue)
AMOUNT in INR
Sr. No. DESCRIPTION SAC Code
Civil Works for WTP 2x800 MW Previous Bill This Bill Cummulative Bill
A Telangana Super Thermal Power 995426 119,164.30 119,164.30
Project of NTPC RAMAGUNDAM
Sub Total (A)= - 119,164.30 119,164.30
B Goods & Service Tax (GST)
i IGST @ 18% on (A) - 21,450.00 21,450.00
Sub Total (B)= - 21,450.00 21,450.00
Total (A+B)= 0 140,614.30 140,614.30
Rupees One Lakh Fourty Thousand Six Hundred And Fourteen Paise Thirty Only
Service Category : Work Contract Services
For
(site-in- Incharge)