KEY PLAN : AUTHORITY STAMP :

PART 4

PH-1
PH-3
GYM KEY PLAN
CENTRE POINT PH-2 CS

3720x1800mm LED SCREEN ADVERTISEMENT PROMOTIONS IT.

50
51

01

FIRST AID
ELEC
RED LIGHT
A
THERAPY CS

A NOTES :
GROUND FLOOR = ± 0.00 PROJECT LEVEL = + XXX DMD LEVEL
A

A ALL LEVELS AND PLOT COORDINATES INDICATED ARE IN MILLIMETERS AND


A DIRTY TOWEL ARE FLOOR FINISH LEVEL OR TOP OF WALL LEVEL UNLESS OTHERWISE
SPECIFIED.

-THIS DRAWING IS NOT TO BE SCALED.

STORAGE CLEAN TOWEL -REFER TO RELEVANT SURVEY, STRUCTURAL, MECHANICAL, ELECTRICAL,


LANDSCAPE, ETC. CONSULTANT DRAWINGS & SPECIFICATIONS BEFORE
SW
M. PRAYER PROCEEDING WITH THE WORK.
-DETAIL DRAWINGS SHOWN ARE INDICATIVE OF DESIGN INTENT.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS AND SAMPLE PER
SPECIFICATIONS TO DESIGNER'S APPROVAL PRIOR TO CONSTRUCTION OR
FABRICATION.
-CONSTRUCTION MUST CONFORM TO ALL APPLICABLE CODES AND
REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.
CS -THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED
CS
"FOR
DIGITAL SIGNAGE SCREEN CONSTRUCTION"
ADVERTISEMENT MUST ASSUME FULL RESPONSIBILITY AND BEAR
PROMOTIONS
COSTS FOR ANY CORRECTIONS OR DAMAGES RESULTING FROM THIS WORK.
CS
-THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS PROVIDED BY AND IS
THE PROPERTY OF THE ARCHITECT.
A -THE CONTRACTOR SHALL VERIFY THE CONTENT OF THIS DRAWING AND
SHALL NOTIFY THE CONSULTANTS OF ANY DEVIATION OR DISCREPANCY.
-CORRECTNESS, BUILDABILITY AND STABILITY OF THE CONSTRUCTION
SHALL REMAIN SOLE RESPONSIBILITY OF THE CONTRACTOR.

REVISIONS :
FHC C
C
STAIR 2 REV. DATE DESCRIPTION
00 21.02.2022 ISSUED FOR CONSTRUCTION

AV RACK (Controls of Light, Music & Content over Ipad DMX Lighting, Spivi & Content
4500x3150mm LED SCREEN ADVERTISEMENT PROMOTIONS

PROJECT DESCRIPTION :
MADAR PHASE 2
EXERCISE ROOM DN UP BLOCK E, ALJADA, SHARJAH
PLOT NO.: ‫كلم‬11 /3288 ‫ يموكح‬7122 , AREA: ‫ةيراحت‬
/ ‫كوحلي‬

Pendul
um
2
2 OF
WITH EQUIPMENT PROPOSED [TRAMPOLINE CLUB BUILDING (G+ MEZZ+ROOF), BOH BUILDING
(G+ROOF), GYM BUILDING (G+1+ROOF), PARKING, KIDS PLAY
AREA+EXTENSION FOR OPEN TO SKYSKATE PARK]
Biceps Iso
lator

Nautilus Glute
Drive Nautilus Glute Drive
(SPIN STUDIO) OWNER :
ELECTRICAL 2 OF
2

AL JADA
Booty
Builder

Booty
Builder
CABINET DEVELOPMENTS

Gluteato
r Reverse Hyper Extension DEVELOPER :
Reverse Hyper Extension
ARADA
DEVELOPMENTS LLC
LEAD CONSULTANT :

Mimar Emirates Eng. Consultants


P.O. BOX 29354, Sharjah - U A E. E-mail: mimar@mimar-group.com
TEL: +971 6 55 499 22 FAX: +971 6 55 492 92 www.mimar-group.com
Dubai Sharjah Abu Dhabi Ajman Doha Cairo Tripoli Baghdad

ISSUE STATUS :
ACCESS HATCH TO ISSUED FOR CONSTRUCTION
BASEMENT SCALE : 1:100 REVIEWED BY : Y.K
TITLE :
MH OVERALL FLOOR PLAN - LEVEL
GROUND AV LAYOUT PART-4
00-GROUND FLOOR - PART 4 DRAWING NO. REV NO.
1 1 : 100 564SHJ22-01-GYM-AV-100-4 00