Professional Documents
Culture Documents
Wärtsilä 18V46
Important equipments:
Charge air filer:
2 segments: Oil bath filter & Dry filter
No. Of square filters in dry filter: 18
Turbocharger
Charge air cooler
Turbo-washing unit
Turbine wash sequence:
Ready - Load adjust - Stabilisation - Water ejection - Air blow - Stabilisation -
Completed
Wash interval: 100 hours
Compressor wash sequence:
Ready - Water injection - Air blow - completed
Wash interval: 24 hours
Wastegate
Condensation in charge air cooler and charge air receiver
System flow:
Charge Air System: Charge air filter - Charge air silencer - Charge air cooler - Charge air
receiver - cylinder head
Exhaust system: Cylinder head - Exhaust manifold - turbocharger turbine - EGB -
Exhaust gas silencer - Exhaust stack
Prepared by
MOHAMMAD SHAH PARAN
ADM-Tech.
SUMMIT GAZIPUR II POWER LIMITED
SPL-99892