Professional Documents
Culture Documents
Tugas Tutorial 1 Espa4122
Tugas Tutorial 1 Espa4122
NIM : 042758976
Prodi : Manajemen
KM : ESPA4122
Tugas 1.
4. Dik :
M = 10.000.000,-
n=8
jadi, p = 24/3 = 8
Mn = M(1+p)²
= 10.000.000 (1+8%)
= 10.000.000 (1,08)
=10.000.000 (1,851)’
= 18.510.000
2. 110011001
= 256 + 128 + 0 + 0 + 16 + 8 + 0 + 0 + 1
= 409
1. Dik :
A = {1,3,5,7,9}
B = {1,3,4,6,7}
C = {2,3,4,5,6,7,8,9}
Dit : A. A∩(B∩C)
= {1,3,5,7,9} ∩ ({3,4,5,7})
= {3,7}
B. AU(B∩C)
= {1,3,5,7,9} U ({3,4,6,7})
= {1,3,4,5,6,7,9}
C. A∩(BUC)
= {1,3,5,7,9} ∩ ({1,2,3,4,5,6,7,8,9})
= {1,3,5,7,9}
3. Dik :
F(n) = 3 . 3ⁿ⁻¹
a=3
r=3
Dit :
Peny :
f(n) = 3.3ⁿ⁻¹
f(20) = 3.3²⁰⁻¹
= 3²⁰⁻¹⁺¹
= 3²⁰
= 3.486.784.401
f(n) = 3.3ⁿ⁻¹
f(30) = 3.3³⁰⁻¹
= 3³⁰⁻¹⁺¹
= 3³⁰
Nilai deret ke-20
𝑎(𝑟ⁿ−1)
𝑠𝑛 = 𝑟−1
3(3²⁰−1)
𝑠₂₀ =
3−1
3𝑥320 −3
= 2
3²¹−3
= 2
10460353203−3
= 2
10460353200
= 2
= 5.230.176.600
3(3³⁰−1)
𝑠₃₀ =
3−1
3𝑥330 −3
= 2
331 −3
=
2
= 1.0294557𝑒 + 14