CHEMICAL SPILL DRILL
at Batam Office Facility
May 21st, 2014

1
Chemical Spillage Scenario
May 21st, 2014 at 1.30 pm
A Locations: Darkroom
A.

On Monday, a technician was


looking for something in the
Dark Room.
Room He does not
know that there jerry cans
containing fixer without caps.
While opening cabinets that
were on the wall, knees
technician inadvertently
nudged jerry cans containing
1 litter of fixer.
fixer

2 Asset Integrity
Chemical Spillage Scenario
May 21st, 2014 at
1.30 pm
“He was shocked
and he did not
think, but he
k
knows what
h t
should be taken if
there is an
emergency.”
g y

3 Asset Integrity
Chemical Spillage Scenario

May 21st, 2014 at 1.33 pm May 21st, 2014 at 1.35 pm


Then he
Th h came outt off the
th room, A spill
ill emergency personnell rushed
h d
close the door and give temporary to prepared spill handling
barrier to prevent other entering, equipment and perform duties as
and he called emergency response follows:
persons.
1. Dam with place boom across as
a precaution with blocked of flow
to prevent flowing to open drain
drain.

4 Asset Integrity
Chemical Spillage Scenario

May 21st, 2014 at 1.40 pm May 21st, 2014 at 1.45 pm


2. Placed
2 Pl d absorber
b b pad
d on the
th top
t 4. After
4 Aft make
k it sure clean
l and
d
of spillage and he wiped it clean safe spill personal put all
and safe. contaminated spill material items (
absorbent pad, shock) into plastic
bag and bring into contaminated
waste bin.

5 Asset Integrity
Chemical Spillage Scenario

May 21st, 2014 at 1


1.45
45 pm May 21st, 2014 at 1.46
1 46 pm

6. A witness immediately help secured 7. He Brought and put it into


and look for the caps
p and close it. contaminated waste bin.

6 Asset Integrity
 

EMERGENCY AND EVACUATION REPORT

Purpose : Drill / Fire / Explosion / Chemical Spill / Other

Emergency Detected by : Iwan Frantino. S Overall Evacuation Time : 15 Minutes

Date & Time : May 21st, 2014 Reported by : Christianus. K

Total of Number Casualty : 0

Detail of Head Count Result :

Headcount Headcount Reason


Floor Category Casualty Reported by
Total Actual Missing Other
Employees 5 4 - -
1st Christianus. K
Visitors - - - -
Employees 1 1 - -
2nd Christianus. K
Visitors - - - -

General Comment & Improvement & Future Actions:


by: Chemical Spill Team & Emergency Coord.
- Additional personnel are needed to assist handling of chemical spillage
- During handling chemical spillage make sure the area is safe from each other who are not
interested
- Initial response of any personnel selected must be fast and responsive

HSE/ CQI Comment & Recommendation : by : HSE/ CQI Department

- Initial response of any personnel selected must be fast and responsive


- During handling chemical spillage ensure PPE has worn
- Do not panic
- Ensure disturb things such as: door jam, equipment and other material is free to avoid
personnel obstructed

Emergency Coordinator HSE/ CQI Manager

    SAF‐FRM‐020/ 1:1