PROBLEM ANALYSIS
1. Steam drum level low after BFP trip and
discharge valve BFP cut in opening process. BENEFITS
2. Steam drum level high after BFP cut in and
1. Minimaze Loss Production
supply feed water to the steam drum.
3. Over firing happen when 1 BFP trip and there 2. The system more safe for equipment, human
is has Mill PM at Mill priority shutdown and availability.
sequence, it will make slow down the trip 3. Operation team more easy to control steam
sequence. drum level and can select Mill shutdown
priority based on actual condition.
ACTION 4. Only need Operation team to recovery unit
1. Review sequence logic mill shutdown priority, until load up.
Over firing, Drum level high after BFP cut in 5. Reduce for fuel oil consumption
2. Get data and Analyze Logic 6. Normal working time for employee
3. Editing logic is needed to make sequence mill
7. Maintain EAF and Reduce EFOR
shutdown priority suitable with process and
save when 1 BFP failure is happened