MODIFICATION LOGIC PLC LEAKAGE CONTROL

SYSTEM AIR HEATER FOR UNIT 1 AND UNIT 2

The Problem

Temperature
I wantLow
making thisNormal
machineOperation
safe

Temperature high Problem Operation


Plan

I know the Problem is Noise inside AIR HEATER when


temperature is high, I Want this machine is safe
Do

Additional CT Additional Logic PLC Additional Logic DCS


Check and

Quantitative Problem Before and After Modification


10
Result
8
result

6 Temperature Normal
4 Low Operation
2
0 Temperature Normal
-22004 2006 2008 2010 2012 2014 2016 2018 2020 2022 high Operation