BILL OF QUANTITIES FOR WORKS ALONG RUANGWA -NAMICHIGA REGIONAL ROAD
( RUANGWA MABEY BRIDGE)
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
1.00 Preliminaries and General items.
Allow for Mobilization and Ls 1 1.10 demobilization of plants and equipment 8,000,000.00 8,000,000.00 Total Preliminaries and General Items 8,000,000.00 STONEWORKS AND PROTECTION 2.00 AGAINST EROSION Galvanised gabion boxes (2m x 1m 2.10 x1m) m3 600 200,000.00 120,000,000.00 Strengthen of Bailey Bridge (Double Ls 1.00 2.20 single construction) (one bailey only) 15,000,000.00 15,000,000.00
Sub Total 135,000,000.00
SUMMARY PAY ITEM DESCRIPTION OF WORKS AMOUNT (TSHS)
BILL NO 1 Preliminary and general items 8,000,000.00
BILL NO 2 Drainage works 135,000,000.00
BILL NO 3 Day works
SUB TOTAL 143,000,000.00
ADD 18% VAT 25,740,000.00 GRAND TOTAL CARRIED TO FORM OF BID 168,740,000.00