You are on page 1of 247

ORACLE PUCHASING

TRAINING MANUAL RCSML

Creation Date:
Last Updated:
Version: 1.0
Table Of Contents
1 Discrete Job.....................................................................4
1.1 How to Make Product Job (Discrete Job)................................................5
1.2 Enter Your Release Job............................................................................11
1.3 Enter JOB Componets( BOM)................................................................16
1.4 Enter JOB Operation (Routing)..............................................................21
2 Move Transaction..........................................................25
2.1 What is Transaction Type (Move,Complete, Return)............................26
2.2 Enter Operations Type( Seq, Code, Department, Step ,Quenty ).........29
3 WIP Material Transaction.............................................44
3.1 Enter the Transaction Type....................................................................45
4 Complete Transaction...................................................48
4.1 Menu Path...............................................................................................49
5 How to Make Master (ITEM-CODE)............................50
5.1 Switch Responsibility..............................................................................51
5.2 How to Change Window.........................................................................53
5.3 Find Key Flexfield Value (KFL)..............................................................56
5.4 Value ITEM – CODE & Description......................................................59
6 Item Master Definition (value set, template assign,org
assign, subinventory, locator assign)....................................61
6.1 ITEM Master Definition.........................................................................62
6.2 Value Set or Unit of Measure..................................................................69
6.3 Template Assign......................................................................................70
6.4 Organization Assign................................................................................73
6.5 Itme Subinvertory...................................................................................79
6.6 View Locator Assign................................................................................81
6.7 ????????????????????.............................................................................82
7 ROUTIN & Bill of Mater (BOM)...................................84
7.1 Routing Switch Responsibility..................................................................85
7.2 Standard Operation....................................................................................91
7.3 BOM (Bill Of Mater)...................................................................................97
8 OSP...............................................................................105
8.1 OSP Discrete Job Creation.......................................................................105
8.2 Release Job................................................................................................112
8.3 Purchase Requisitio Generation...............................................................117
8.4 Auto Create PO #......................................................................................125
8.5 How To Check Approve PO# (Purchase Order)......................................139
8.6 Move Transaction (Queue to Queue).......................................................149
8.7 Material Transfer to Third(3rd) Party (WIP)(Subinvertory Transfer)....159

Page 2
8.8 Locator Assign (wip material requirement).............................................171
8.9 PO # Receipt.............................................................................................178
8.10 Inspect.......................................................................................................191
8.11 Delivering.................................................................................................201
8.12 WIP(work in Process) Complete..............................................................210
8.13 Automatic back Flushing Componets......................................................219
8.14 Invoice Creation Again PO#.....................................................................221
8.15 Payment of Invoice...................................................................................221
8.16 Report Running (Dyeing Status Summary)............................................221
9 Receipt.........................................................................222
9.1 Menu Path................................................................................................223
9.2 Search Relevant Purchase Order.............................................................224
9.3 Enter Receipt Header Information.........................................................225
9.4 Enter Receipt Line Information..............................................................228
10 Receiving Transactions...............................................229
10.1 Menu Path................................................................................................230
10.2 Search the Relevant Purchase Order or Receipt Number.......................231
10.3 Enter Inspection Information.................................................................232
10.4 Enter Deliver to Inventory Information..................................................234
11 Return..........................................................................237
11.1 Menu Path................................................................................................238
11.2 Search the Relevant Purchase Order or Receipt Number......................239
11.3 Enter Return Information.......................................................................240
12 Correction....................................................................241
12.1 Menu Path................................................................................................242
12.2 Search the Relevant Purchase Order or Receipt Number......................243
12.3 Enter Correction Information.................................................................244

Page 3
Training Manual - Yarn

1 Discrete Job

A request for quotation (RFQ) is a document used to solicit supplier quotations for

Steps Summary:

Creating an RFQ manually is only seven step process as described below:

1.1 – How to Make Product Job (Discrete Job)

1.2 – Enter Release job Information

1.3 – Enter Job Componets (BOM) Information

1.4 – Enter Job Operations (Routing) Information

RCSML Page 4
Training Manual - Yarn

1.1 How to Make Product Job (Discrete Job)


The Navigation Path to the RFQ form is

RCSML Page 5
Training Manual - Yarn

RCSML Page 6
Training Manual - Yarn

RCSML Page 7
Training Manual - Yarn

RCSML Page 8
Training Manual - Yarn

RCSML Page 9
Training Manual - Yarn

RCSML Page 10
Training Manual - Yarn

RCSML Page 11
Training Manual - Yarn

1.2 Enter Your Release Job

RCSML Page 12
Training Manual - Yarn

RCSML Page 13
Training Manual - Yarn

1. Operating Unit will default when form is opened.


2. Type of RFQ will also be auto-populated i.e. Standard RFQ.
3. Use the Status field to control the status of the RFQ. Here you are provided with the
following options;

 In Process - The initial status when you create the RFQ.

RCSML Page 14
Training Manual - Yarn

 Active - Choose this status when the RFQ is complete and you are ready to send it to your
suppliers. Only Active RFQs are printed.
 Closed - Choose this status to close the RFQ when all suppliers have responded or when you
no longer want responses.

4. Enter the Due Date by which your suppliers must reply.


5. Enter the Close Date for the RFQ.
6. Enter the beginning and ending Effectivity Dates for the supplier quotation.

RCSML Page 15
Training Manual - Yarn

1.3 Enter JOB Componets( BOM)

RCSML Page 16
Training Manual - Yarn

RCSML Page 17
Training Manual - Yarn

RCSML Page 18
Training Manual - Yarn

1. Select the Lines tabbed region in the RFQs window.


2. Enter the Item code.
3. Enter an optional Target Price for the RFQ line. You may want to provide a target price on
the RFQ line for negotiation purposes. Enter details in descriptive flex field values as
mentioned in RFQ auto creation method.
4. Enter the DFF information for context value of Yarn by clicking circled box below.

RCSML Page 19
Training Manual - Yarn

Enter all the DFF information Sale Order, department ETC. and save your work.

RCSML Page 20
Training Manual - Yarn

1.4 Enter JOB Operation (Routing)

Now click on the Suppliers button

RCSML Page 21
Training Manual - Yarn

RCSML Page 22
Training Manual - Yarn

RCSML Page 23
Training Manual - Yarn

Following window will appear

RCSML Page 24
Training Manual - Yarn

1.
2.
2 Move Transaction

Overview

A Quotation is a statement of the price, terms and conditions of sales. A supplier

Steps Summary:

Entering a quotation is an eight step process as described below:

2.1 – What is Transaction Type (Move,Complete, Return)

2.2 –Enter Operations Type( Seq, Code, Department, Step)

RCSML Page 25
Training Manual - Yarn

2.1 What is Transaction Type (Move,Complete, Return)

The Navigation Path to the RFQ form is

Authorized Purchasing Responsibility RFQ’s and Quotations  RFQ’s

RCSML Page 26
Training Manual - Yarn

RCSML Page 27
Training Manual - Yarn

RCSML Page 28
Training Manual - Yarn

2.2 Enter Operations Type( Seq, Code, Department, Step ,Quenty )

RCSML Page 29
Training Manual - Yarn

RCSML Page 30
Training Manual - Yarn

RCSML Page 31
Training Manual - Yarn

RCSML Page 32
Training Manual - Yarn

RCSML Page 33
Training Manual - Yarn

RCSML Page 34
Training Manual - Yarn

RCSML Page 35
Training Manual - Yarn

RCSML Page 36
Training Manual - Yarn

RCSML Page 37
Training Manual - Yarn

RCSML Page 38
Training Manual - Yarn

RCSML Page 39
Training Manual - Yarn

RCSML Page 40
Training Manual - Yarn

RCSML Page 41
Training Manual - Yarn

Click on Find in View Menu bar.

RCSML Page 42
Training Manual - Yarn

Find the relevant RFQ number with reference to which you want to enter quotation of a
supplier.

2.3

RCSML Page 43
Training Manual - Yarn

3 WIP Material Transaction


Auto creation of Comparative Statement with reference to RFQ.

Steps summary:
Creating a CS through Auto Create functionality is a four step process as
described below:

3.1 – Enter The Transaction Type

3.2 – Enter the Search Criteria

3.3 – Assign Quantity to Suppliers

3.4 – Send for Approval

RCSML Page 44
Training Manual - Yarn

3.1 Enter the Transaction Type


The Navigation Path for the Comparative Statement window is:

Purchasing  Comparative Statement

RCSML Page 45
Training Manual - Yarn

RCSML Page 46
Training Manual - Yarn

RCSML Page 47
Training Manual - Yarn

Click the “Comparative Statemet” button to create a CS.

RCSML Page 48
Training Manual - Yarn

4 Complete Transaction
Steps summary:
Creating a Purchase Order is a eight step process as described below:

4.1 – Navigate to the CS window

4.2 – Enter search criteria

4.3 – Select the relevant supplier

4.4 – Click PO creation

4.5 – Navigate to purchase order form

4.6 – Query purchase order number

4.7 – Manage Tax

4.8 – Send for Approval

RCSML Page 49
Training Manual - Yarn

4.1 Menu Path

Purchasing  Comparative Statement

RCSML Page 50
Training Manual - Yarn

5 How to Make Master (ITEM-CODE)

Steps Summary:

Canceling a Purchase Order is only a three step process as described below:

5.1 –Navigate to the Switch Responsibility

5.2 – How to Change Window

5.3 – Find Key Flexfield Value (KFL)

5.4 – Value ITEM – CODE & Description

RCSML Page 51
Training Manual - Yarn

5.1 Switch Responsibility

Canceling a Purchase Order involves the searching of the purchase order from the “PO
Summary” window.

The Navigation Path to the Purchase Order form is

Purchasing  Purchase Orders  Purchase Order Summary

RCSML Page 52
Training Manual - Yarn

RCSML Page 53
Training Manual - Yarn

5.2 How to Change Window

On clicking the “PO Summary”, the below mentioned window will appear.

RCSML Page 54
Training Manual - Yarn

RCSML Page 55
Training Manual - Yarn

1. The user can enter different search criteria to find the Purchase Order. He may find the
Purchase Order by:
 Purchase Order Number
 Name of buyer
 Items mentioned in the purchase order

2. Enter the PO number and click on “Find” button.


Following window will appear:

RCSML Page 56
Training Manual - Yarn

5.3 Find Key Flexfield Value (KFL)

Navigation: Menubar > Tools > Control

System will show the PO Header information. User will be able to take different actions on
different levels of PO like PO Header, PO Line and PO Shipment.

RCSML Page 57
Training Manual - Yarn

RCSML Page 58
Training Manual - Yarn

Following are different types of Actions that can be taken on PO:

RCSML Page 59
Training Manual - Yarn

5.4 Value ITEM – CODE & Description

RCSML Page 60
Training Manual - Yarn

RCSML Page 61
Training Manual - Yarn

6 Item Master Definition (value set, template assign,org assign,


subinventory, locator assign)

Steps Summary:
Checking a PO status is a seven step process as described below:

6.1 – Navigate to the item Definition

6.2 – Value set , Unit of Measure

6.3 – Template Assigne

6.4 – Organization Assign

6.5 – Subinvertory

6.6 – Locator Assign

6.7 –

RCSML Page 62
Training Manual - Yarn

6.1 ITEM Master Definition

The Navigation Path to the Purchase Order form is

Authorized Purchasing Responsibility Purchase Orders  PO Summary

RCSML Page 63
Training Manual - Yarn

RCSML Page 64
Training Manual - Yarn

RCSML Page 65
Training Manual - Yarn

RCSML Page 66
Training Manual - Yarn

RCSML Page 67
Training Manual - Yarn

RCSML Page 68
Training Manual - Yarn

RCSML Page 69
Training Manual - Yarn

6.2 Value Set or Unit of Measure

1. On clicking the “PO Summary”, the above mentioned window will appear.

2. The user can enter different search criteria to find the Purchase Order. He may find the PO
by:

 PO Number
 Name of buyer
 Items mentioned in the Purchase Order

3. Enter the PO number and click on “Find” button.

RCSML Page 70
Training Manual - Yarn

6.3 Template Assign

RCSML Page 71
Training Manual - Yarn

RCSML Page 72
Training Manual - Yarn

The status of purchase order can be checked from the above screen.

To view the Purchase Order Header details, user will scroll the window from left to right.

To view the Line data in a Purchase Order, click on “Lines”

RCSML Page 73
Training Manual - Yarn

6.4 Organization Assign

RCSML Page 74
Training Manual - Yarn

RCSML Page 75
Training Manual - Yarn

RCSML Page 76
Training Manual - Yarn

RCSML Page 77
Training Manual - Yarn

RCSML Page 78
Training Manual - Yarn

To view the details, the user will scroll the window from left to right.

RCSML Page 79
Training Manual - Yarn

6.5 Itme Subinvertory

RCSML Page 80
Training Manual - Yarn

RCSML Page 81
Training Manual - Yarn

To view the details, the user will scroll the window from left to right.

6.6 View Locator Assign

To view the details, the user will scroll the window from left to right.

RCSML Page 82
Training Manual - Yarn

6.7 ????????????????????

To view the action history on the Purchase Order, user will move to

Inquire > View Action History.

RCSML Page 83
Training Manual - Yarn

Screenshot shows the date wise detail of actions taken by each approver along with the person
with which action is pending. It also shows any “Note” specified by each approver while taking
action on Purchase Order.

RCSML Page 84
Training Manual - Yarn

7 ROUTIN & Bill of Mater (BOM)


IGP is a document which will be used by gate officer to process the gate pass for the
consignment received at CTM from supplier.
On preparation of IGP, requester of the received goods will be notified through alert along with
Inventory and Procurement department.

Steps Summary:
Creating an Inward Gate Pass has following three steps:

8.1 - Navigate to The Switch Responsibility

8.2 - Enter IGP Header Information

8.3 - Enter IGP Line Information

RCSML Page 85
Training Manual - Yarn

7.1 Routing Switch Responsibility


The Navigation Path to the IGP form is

Authorized Inventory Responsibility  IGP form

RCSML Page 86
Training Manual - Yarn

RCSML Page 87
Training Manual - Yarn

RCSML Page 88
Training Manual - Yarn

RCSML Page 89
Training Manual - Yarn

RCSML Page 90
Training Manual - Yarn

RCSML Page 91
Training Manual - Yarn

7.2 Standard Operation

RCSML Page 92
Training Manual - Yarn

RCSML Page 93
Training Manual - Yarn

RCSML Page 94
Training Manual - Yarn

RCSML Page 95
Training Manual - Yarn

RCSML Page 96
Training Manual - Yarn

RCSML Page 97
Training Manual - Yarn

Enter the Gate Entry number from which Weight fields, Transport Company, Driver Name,
Vehicle No, Vehicle Type and Bales will default. Else enter other necessary header level
information available on the challan provided by supplier.

RCSML Page 98
Training Manual - Yarn

7.3 BOM (Bill Of Mater)

RCSML Page 99
Training Manual - Yarn

RCSML Page 100


Training Manual - Yarn

RCSML Page 101


Training Manual - Yarn

RCSML Page 102


Training Manual - Yarn

RCSML Page 103


Training Manual - Yarn

RCSML Page 104


Training Manual - Yarn

Select the Relevant Document Type for which IGP has to be processed.

RCSML Page 105


Training Manual - Yarn

RCSML Page 106


Training Manual - Yarn

8 OSP

8.1 OSP Discrete Job Creation

RCSML Page 107


Training Manual - Yarn

RCSML Page 108


Training Manual - Yarn

RCSML Page 109


Training Manual - Yarn

RCSML Page 110


Training Manual - Yarn

RCSML Page 111


Training Manual - Yarn

RCSML Page 112


Training Manual - Yarn

RCSML Page 113


Training Manual - Yarn

8.2 Release Job

RCSML Page 114


Training Manual - Yarn

RCSML Page 115


Training Manual - Yarn

RCSML Page 116


Training Manual - Yarn

RCSML Page 117


Training Manual - Yarn

RCSML Page 118


Training Manual - Yarn

RCSML Page 119


Training Manual - Yarn

8.3 Purchase Requisitio Generation

RCSML Page 120


Training Manual - Yarn

RCSML Page 121


Training Manual - Yarn

RCSML Page 122


Training Manual - Yarn

RCSML Page 123


Training Manual - Yarn

RCSML Page 124


Training Manual - Yarn

RCSML Page 125


Training Manual - Yarn

RCSML Page 126


Training Manual - Yarn

RCSML Page 127


Training Manual - Yarn

8.4 Auto Create PO #

RCSML Page 128


Training Manual - Yarn

RCSML Page 129


Training Manual - Yarn

RCSML Page 130


Training Manual - Yarn

RCSML Page 131


Training Manual - Yarn

RCSML Page 132


Training Manual - Yarn

RCSML Page 133


Training Manual - Yarn

RCSML Page 134


Training Manual - Yarn

RCSML Page 135


Training Manual - Yarn

RCSML Page 136


Training Manual - Yarn

RCSML Page 137


Training Manual - Yarn

RCSML Page 138


Training Manual - Yarn

RCSML Page 139


Training Manual - Yarn

RCSML Page 140


Training Manual - Yarn

RCSML Page 141


Training Manual - Yarn

8.5 How To Check Approve PO# (Purchase Order)

RCSML Page 142


Training Manual - Yarn

RCSML Page 143


Training Manual - Yarn

RCSML Page 144


Training Manual - Yarn

RCSML Page 145


Training Manual - Yarn

RCSML Page 146


Training Manual - Yarn

RCSML Page 147


Training Manual - Yarn

RCSML Page 148


Training Manual - Yarn

RCSML Page 149


Training Manual - Yarn

RCSML Page 150


Training Manual - Yarn

RCSML Page 151


Training Manual - Yarn

8.6 Move Transaction (Queue to Queue)

RCSML Page 152


Training Manual - Yarn

RCSML Page 153


Training Manual - Yarn

RCSML Page 154


Training Manual - Yarn

RCSML Page 155


Training Manual - Yarn

RCSML Page 156


Training Manual - Yarn

RCSML Page 157


Training Manual - Yarn

RCSML Page 158


Training Manual - Yarn

RCSML Page 159


Training Manual - Yarn

RCSML Page 160


Training Manual - Yarn

RCSML Page 161


Training Manual - Yarn

8.7 Material Transfer to Third(3rd) Party (WIP)(Subinvertory Transfer)

RCSML Page 162


Training Manual - Yarn

RCSML Page 163


Training Manual - Yarn

RCSML Page 164


Training Manual - Yarn

RCSML Page 165


Training Manual - Yarn

RCSML Page 166


Training Manual - Yarn

RCSML Page 167


Training Manual - Yarn

RCSML Page 168


Training Manual - Yarn

RCSML Page 169


Training Manual - Yarn

RCSML Page 170


Training Manual - Yarn

RCSML Page 171


Training Manual - Yarn

RCSML Page 172


Training Manual - Yarn

RCSML Page 173


Training Manual - Yarn

8.8 Locator Assign (wip material requirement)

RCSML Page 174


Training Manual - Yarn

RCSML Page 175


Training Manual - Yarn

RCSML Page 176


Training Manual - Yarn

RCSML Page 177


Training Manual - Yarn

RCSML Page 178


Training Manual - Yarn

RCSML Page 179


Training Manual - Yarn

RCSML Page 180


Training Manual - Yarn

8.9 PO # Receipt

RCSML Page 181


Training Manual - Yarn

RCSML Page 182


Training Manual - Yarn

RCSML Page 183


Training Manual - Yarn

RCSML Page 184


Training Manual - Yarn

RCSML Page 185


Training Manual - Yarn

RCSML Page 186


Training Manual - Yarn

RCSML Page 187


Training Manual - Yarn

RCSML Page 188


Training Manual - Yarn

RCSML Page 189


Training Manual - Yarn

RCSML Page 190


Training Manual - Yarn

RCSML Page 191


Training Manual - Yarn

RCSML Page 192


Training Manual - Yarn

RCSML Page 193


Training Manual - Yarn

8.10 Inspect

RCSML Page 194


Training Manual - Yarn

RCSML Page 195


Training Manual - Yarn

RCSML Page 196


Training Manual - Yarn

RCSML Page 197


Training Manual - Yarn

RCSML Page 198


Training Manual - Yarn

RCSML Page 199


Training Manual - Yarn

RCSML Page 200


Training Manual - Yarn

RCSML Page 201


Training Manual - Yarn

RCSML Page 202


Training Manual - Yarn

RCSML Page 203


Training Manual - Yarn

8.11 Delivering

RCSML Page 204


Training Manual - Yarn

RCSML Page 205


Training Manual - Yarn

RCSML Page 206


Training Manual - Yarn

RCSML Page 207


Training Manual - Yarn

RCSML Page 208


Training Manual - Yarn

RCSML Page 209


Training Manual - Yarn

RCSML Page 210


Training Manual - Yarn

RCSML Page 211


Training Manual - Yarn

RCSML Page 212


Training Manual - Yarn

8.12 WIP(work in Process) Complete

RCSML Page 213


Training Manual - Yarn

RCSML Page 214


Training Manual - Yarn

RCSML Page 215


Training Manual - Yarn

RCSML Page 216


Training Manual - Yarn

RCSML Page 217


Training Manual - Yarn

RCSML Page 218


Training Manual - Yarn

RCSML Page 219


Training Manual - Yarn

RCSML Page 220


Training Manual - Yarn

RCSML Page 221


Training Manual - Yarn

RCSML Page 222


Training Manual - Yarn

8.13 Automatic back Flushing Componets

RCSML Page 223


Training Manual - Yarn

RCSML Page 224


Training Manual - Yarn

8.14 Invoice Creation Again PO#

8.15 Payment of Invoice

8.16 Report Running (Dyeing Status Summary)

RCSML Page 225


Training Manual - Yarn

9 Receipt
Receipt is a process which will be performed by Yarn Warehouse to process the receipt for the
consignment received from supplier.

Steps Summary:
Creating a Receipt has following four steps:

9.1 - Navigate to the Receipt Form

9.2 - Search the Relevant Purchase Order

9.3 - Enter Receipt Header Information

9.4 - Enter Receipt Line Information

RCSML Page 226


Training Manual - Yarn

9.1 Menu Path


The Navigation Path to the Receipt form is

Authorized Inventory Responsibility  Transactions  Receiving  Receipts


Click on the
“Receipts”

RCSML Page 227


Training Manual - Yarn

9.2 Search Relevant Purchase Order

Query the expected receipt, Expected receipt line can be queried using any of the following
search criteria:
 Purchase Order Number
 Purchase Requisition / Internal Requisition
 Supplier Name
 Shipment Number
 Item Code
 Date

Then, Click on Find Button. Receipt Header level window appears.

RCSML Page 228


Training Manual - Yarn

9.3 Enter Receipt Header Information

The following information defaults on the receipt header based on source document used for
receiving and person processing the receipt the:
 Receipt Date (System Date)
 Received By (User Name)
 Supplier name (in case of Receipt against PO, SO)
 Shipment Number (in case of Inter-Organization Receipt)

Enter any remarks in the Comments field (Optional).


If the receipt is required to be added to an old receipt, click on ‘Add To Receipt’, circled in below
screenshot.

RCSML Page 229


Training Manual - Yarn

Following window will appear showing all the previous receipts created agains this supplier,
select the relevant Receipt number in which this receipt is to be added.

Select the relevant IGP Number by clicking on DFF as circled in below screenshot.

RCSML Page 230


Training Manual - Yarn

Following window will appear showing IGP Numbers generated, select the relevant IGP number
and proceed to Receipt Lines.

RCSML Page 231


Training Manual - Yarn

9.4 Enter Receipt Line Information

Lines will default from Purchase Order, Item Quantity, UoM and other data will also default
from Purchase Order. Click the check box and update the quantity if required and save it.
Upon saving the system automatically assigns a receipt number. This receipt number is used to
process inspection, receiving and return to the supplier (If required in case of rejection).

RCSML Page 232


Training Manual - Yarn

10 Receiving Transactions

Receiving Transactions is a document which will be used by Yarn Procurement department to


process the inspection for the consignment received from supplier and by the Yarn warehouse
to process the deliver to inventory.

Steps Summary:
Creating a Receiving Transactions has following four steps:

10.1 - Navigate to the Receiving Transactions Form

10.2 - Search the relevant Purchase Order or Receipt Number

10.3 - Enter Inspection Information

10.4 - Enter Deliver to Inventory Information

RCSML Page 233


Training Manual - Yarn

10.1 Menu Path


The Navigation Path to the Receiving Transactions form is
Authorized Inventory Responsibility  Transactions  Receiving  Receiving Transactions
Click on
the “Receiving Transactions”

RCSML Page 234


Training Manual - Yarn

10.2 Search the Relevant Purchase Order or Receipt Number

Query the Receipt Number against which Inspection of the goods is needed to record. For
Inspection Receipt Number can be queried using any of the following parameters:
 Receipt Number
 Purchase Order Number
 Purchase Requisition
 Supplier Name
 Shipment Number (In case of Inter-Organization Transfer)
 Item Code
 Date of Receipt Number

Then, Click on Find Button.

RCSML Page 235


Training Manual - Yarn

10.3 Enter Inspection Information

Inspection as highlighted will show as red until the items are inspected and saved. Once the
authorized user in Yarn Procurement department accepts and save the form, Inspection will
automatically turns into Black colour from Red.

Select the check box next to the quantity and click on inspection as highlighted in the above
screenshot, this will open the inspection box.

RCSML Page 236


Training Manual - Yarn

System will default the total quantity as Accept, enter manually the accepted or rejected
quantity. Create another line for rejected quantity. Click OK and Save, system will
automatically change the inspection colour from Red to Black and Inspection required will be
changed to Inspected as shown in the below screenshot. Re-query again to see the changes.

RCSML Page 237


Training Manual - Yarn

10.4 Enter Deliver to Inventory Information

Once the items are inspected and accepted by user department, stores department will enter
deliver to inventory transaction for receipt items.

The Navigation Path to the Receiving Transactions form is


Authorized Inventory Responsibility  Transactions  Receiving  Receiving Transactions

Query the Receipt Number against which the goods are needed to invenotrize. For inventorzing
the material Receipt can be queried using any of the following parameters:
 Receipt Number
 Purchase Order Number
 Purchase Requisition
 Supplier Name
 Shipment Number (In case of Inter-Organization Transfer)
 Item Code
 Receipt Date

Then, Click on Find Button.

RCSML Page 238


Training Manual - Yarn

The relevant lines appear based upon the search criteria entered. Now Confirm that
“Destination Type” is Inventory in order to Inventorize the Item.
User will scroll to right side and enter ‘Sub Inventory’ and ‘Locator’ to which the items are to be
delivered.

RCSML Page 239


Training Manual - Yarn

Save your work.


After saving, the item stock balance will be updated.

RCSML Page 240


Training Manual - Yarn

11Return
Returns is a document which will be used by Yarn Warehouse to process the returns for the
consignment received from supplier.

Steps Summary:
Creating a Return has following three steps:

11.1 – Navigate to the Returns Form

11.2 – Search the Relevant Purchase Order or Receipt Number

11.3 – Enter Returns Information

RCSML Page 241


Training Manual - Yarn

11.1 Menu Path


The Navigation Path to the Receiving Transactions form is
Authorized Inventory Responsibility  Transactions  Receiving  Returns

RCSML Page 242


Training Manual - Yarn

11.2 Search the Relevant Purchase Order or Receipt Number

Query the Purchase Order / Receipt against which return is needed to processed. The respective
line can be queried using any of the following parameters:
 Purchase Order Number
 Receipt Number
 Supplier Name
 Item Code
 Receipt Date

Then, Click on Find Button.

RCSML Page 243


Training Manual - Yarn

11.3 Enter Return Information

This window shows the receipt lines against which the item is inventorized or is in receiving.
Enter the following information:
 Quantity to be return
 Return Type

The return type can be either Supplier or Receiving. If the quantity is to be returned to “In-
Receiving” from inventory, then select Receiving. If the quantity is to be returned to supplier,
then select supplier.
Save your work.

RCSML Page 244


Training Manual - Yarn

12 Correction
Correction window is used to modify receiving transactions to correct errors. You can correct
any receiving transaction except another Correction transaction and a Return to Receiving
transaction.

Steps Summary:
Entering a correction has following three steps:

12.1 - Navigate to the Correction Form

12.2 - Search the Relevant Purchase Order or Receipt Number

12.3 – Enter Correction Information

RCSML Page 245


Training Manual - Yarn

12.1 Menu Path


The Navigation Path to the Receiving Transactions form is
Authorized Inventory Responsibility  Transactions  Receiving  Corrections

RCSML Page 246


Training Manual - Yarn

12.2 Search the Relevant Purchase Order or Receipt Number

Query the Purchase Order / Receipt against which correction is needed to processed. The
respective line can be queried using any of the following parameters:
 Purchase Order Number
 Receipt Number
 Supplier Name
 Item Code
 Receipt Date

Then, Click on Find Button.

RCSML Page 247

You might also like