Professional Documents
Culture Documents
Creation Date:
Last Updated:
Version: 1.0
Table Of Contents
1 Discrete Job.....................................................................4
1.1 How to Make Product Job (Discrete Job)................................................5
1.2 Enter Your Release Job............................................................................11
1.3 Enter JOB Componets( BOM)................................................................16
1.4 Enter JOB Operation (Routing)..............................................................21
2 Move Transaction..........................................................25
2.1 What is Transaction Type (Move,Complete, Return)............................26
2.2 Enter Operations Type( Seq, Code, Department, Step ,Quenty ).........29
3 WIP Material Transaction.............................................44
3.1 Enter the Transaction Type....................................................................45
4 Complete Transaction...................................................48
4.1 Menu Path...............................................................................................49
5 How to Make Master (ITEM-CODE)............................50
5.1 Switch Responsibility..............................................................................51
5.2 How to Change Window.........................................................................53
5.3 Find Key Flexfield Value (KFL)..............................................................56
5.4 Value ITEM – CODE & Description......................................................59
6 Item Master Definition (value set, template assign,org
assign, subinventory, locator assign)....................................61
6.1 ITEM Master Definition.........................................................................62
6.2 Value Set or Unit of Measure..................................................................69
6.3 Template Assign......................................................................................70
6.4 Organization Assign................................................................................73
6.5 Itme Subinvertory...................................................................................79
6.6 View Locator Assign................................................................................81
6.7 ????????????????????.............................................................................82
7 ROUTIN & Bill of Mater (BOM)...................................84
7.1 Routing Switch Responsibility..................................................................85
7.2 Standard Operation....................................................................................91
7.3 BOM (Bill Of Mater)...................................................................................97
8 OSP...............................................................................105
8.1 OSP Discrete Job Creation.......................................................................105
8.2 Release Job................................................................................................112
8.3 Purchase Requisitio Generation...............................................................117
8.4 Auto Create PO #......................................................................................125
8.5 How To Check Approve PO# (Purchase Order)......................................139
8.6 Move Transaction (Queue to Queue).......................................................149
8.7 Material Transfer to Third(3rd) Party (WIP)(Subinvertory Transfer)....159
Page 2
8.8 Locator Assign (wip material requirement).............................................171
8.9 PO # Receipt.............................................................................................178
8.10 Inspect.......................................................................................................191
8.11 Delivering.................................................................................................201
8.12 WIP(work in Process) Complete..............................................................210
8.13 Automatic back Flushing Componets......................................................219
8.14 Invoice Creation Again PO#.....................................................................221
8.15 Payment of Invoice...................................................................................221
8.16 Report Running (Dyeing Status Summary)............................................221
9 Receipt.........................................................................222
9.1 Menu Path................................................................................................223
9.2 Search Relevant Purchase Order.............................................................224
9.3 Enter Receipt Header Information.........................................................225
9.4 Enter Receipt Line Information..............................................................228
10 Receiving Transactions...............................................229
10.1 Menu Path................................................................................................230
10.2 Search the Relevant Purchase Order or Receipt Number.......................231
10.3 Enter Inspection Information.................................................................232
10.4 Enter Deliver to Inventory Information..................................................234
11 Return..........................................................................237
11.1 Menu Path................................................................................................238
11.2 Search the Relevant Purchase Order or Receipt Number......................239
11.3 Enter Return Information.......................................................................240
12 Correction....................................................................241
12.1 Menu Path................................................................................................242
12.2 Search the Relevant Purchase Order or Receipt Number......................243
12.3 Enter Correction Information.................................................................244
Page 3
Training Manual - Yarn
1 Discrete Job
A request for quotation (RFQ) is a document used to solicit supplier quotations for
Steps Summary:
RCSML Page 4
Training Manual - Yarn
RCSML Page 5
Training Manual - Yarn
RCSML Page 6
Training Manual - Yarn
RCSML Page 7
Training Manual - Yarn
RCSML Page 8
Training Manual - Yarn
RCSML Page 9
Training Manual - Yarn
RCSML Page 10
Training Manual - Yarn
RCSML Page 11
Training Manual - Yarn
RCSML Page 12
Training Manual - Yarn
RCSML Page 13
Training Manual - Yarn
RCSML Page 14
Training Manual - Yarn
Active - Choose this status when the RFQ is complete and you are ready to send it to your
suppliers. Only Active RFQs are printed.
Closed - Choose this status to close the RFQ when all suppliers have responded or when you
no longer want responses.
RCSML Page 15
Training Manual - Yarn
RCSML Page 16
Training Manual - Yarn
RCSML Page 17
Training Manual - Yarn
RCSML Page 18
Training Manual - Yarn
RCSML Page 19
Training Manual - Yarn
Enter all the DFF information Sale Order, department ETC. and save your work.
RCSML Page 20
Training Manual - Yarn
RCSML Page 21
Training Manual - Yarn
RCSML Page 22
Training Manual - Yarn
RCSML Page 23
Training Manual - Yarn
RCSML Page 24
Training Manual - Yarn
1.
2.
2 Move Transaction
Overview
Steps Summary:
RCSML Page 25
Training Manual - Yarn
RCSML Page 26
Training Manual - Yarn
RCSML Page 27
Training Manual - Yarn
RCSML Page 28
Training Manual - Yarn
RCSML Page 29
Training Manual - Yarn
RCSML Page 30
Training Manual - Yarn
RCSML Page 31
Training Manual - Yarn
RCSML Page 32
Training Manual - Yarn
RCSML Page 33
Training Manual - Yarn
RCSML Page 34
Training Manual - Yarn
RCSML Page 35
Training Manual - Yarn
RCSML Page 36
Training Manual - Yarn
RCSML Page 37
Training Manual - Yarn
RCSML Page 38
Training Manual - Yarn
RCSML Page 39
Training Manual - Yarn
RCSML Page 40
Training Manual - Yarn
RCSML Page 41
Training Manual - Yarn
RCSML Page 42
Training Manual - Yarn
Find the relevant RFQ number with reference to which you want to enter quotation of a
supplier.
2.3
RCSML Page 43
Training Manual - Yarn
Steps summary:
Creating a CS through Auto Create functionality is a four step process as
described below:
RCSML Page 44
Training Manual - Yarn
RCSML Page 45
Training Manual - Yarn
RCSML Page 46
Training Manual - Yarn
RCSML Page 47
Training Manual - Yarn
RCSML Page 48
Training Manual - Yarn
4 Complete Transaction
Steps summary:
Creating a Purchase Order is a eight step process as described below:
RCSML Page 49
Training Manual - Yarn
RCSML Page 50
Training Manual - Yarn
Steps Summary:
RCSML Page 51
Training Manual - Yarn
Canceling a Purchase Order involves the searching of the purchase order from the “PO
Summary” window.
RCSML Page 52
Training Manual - Yarn
RCSML Page 53
Training Manual - Yarn
On clicking the “PO Summary”, the below mentioned window will appear.
RCSML Page 54
Training Manual - Yarn
RCSML Page 55
Training Manual - Yarn
1. The user can enter different search criteria to find the Purchase Order. He may find the
Purchase Order by:
Purchase Order Number
Name of buyer
Items mentioned in the purchase order
RCSML Page 56
Training Manual - Yarn
System will show the PO Header information. User will be able to take different actions on
different levels of PO like PO Header, PO Line and PO Shipment.
RCSML Page 57
Training Manual - Yarn
RCSML Page 58
Training Manual - Yarn
RCSML Page 59
Training Manual - Yarn
RCSML Page 60
Training Manual - Yarn
RCSML Page 61
Training Manual - Yarn
Steps Summary:
Checking a PO status is a seven step process as described below:
6.5 – Subinvertory
6.7 –
RCSML Page 62
Training Manual - Yarn
RCSML Page 63
Training Manual - Yarn
RCSML Page 64
Training Manual - Yarn
RCSML Page 65
Training Manual - Yarn
RCSML Page 66
Training Manual - Yarn
RCSML Page 67
Training Manual - Yarn
RCSML Page 68
Training Manual - Yarn
RCSML Page 69
Training Manual - Yarn
1. On clicking the “PO Summary”, the above mentioned window will appear.
2. The user can enter different search criteria to find the Purchase Order. He may find the PO
by:
PO Number
Name of buyer
Items mentioned in the Purchase Order
RCSML Page 70
Training Manual - Yarn
RCSML Page 71
Training Manual - Yarn
RCSML Page 72
Training Manual - Yarn
The status of purchase order can be checked from the above screen.
To view the Purchase Order Header details, user will scroll the window from left to right.
RCSML Page 73
Training Manual - Yarn
RCSML Page 74
Training Manual - Yarn
RCSML Page 75
Training Manual - Yarn
RCSML Page 76
Training Manual - Yarn
RCSML Page 77
Training Manual - Yarn
RCSML Page 78
Training Manual - Yarn
To view the details, the user will scroll the window from left to right.
RCSML Page 79
Training Manual - Yarn
RCSML Page 80
Training Manual - Yarn
RCSML Page 81
Training Manual - Yarn
To view the details, the user will scroll the window from left to right.
To view the details, the user will scroll the window from left to right.
RCSML Page 82
Training Manual - Yarn
6.7 ????????????????????
To view the action history on the Purchase Order, user will move to
RCSML Page 83
Training Manual - Yarn
Screenshot shows the date wise detail of actions taken by each approver along with the person
with which action is pending. It also shows any “Note” specified by each approver while taking
action on Purchase Order.
RCSML Page 84
Training Manual - Yarn
Steps Summary:
Creating an Inward Gate Pass has following three steps:
RCSML Page 85
Training Manual - Yarn
RCSML Page 86
Training Manual - Yarn
RCSML Page 87
Training Manual - Yarn
RCSML Page 88
Training Manual - Yarn
RCSML Page 89
Training Manual - Yarn
RCSML Page 90
Training Manual - Yarn
RCSML Page 91
Training Manual - Yarn
RCSML Page 92
Training Manual - Yarn
RCSML Page 93
Training Manual - Yarn
RCSML Page 94
Training Manual - Yarn
RCSML Page 95
Training Manual - Yarn
RCSML Page 96
Training Manual - Yarn
RCSML Page 97
Training Manual - Yarn
Enter the Gate Entry number from which Weight fields, Transport Company, Driver Name,
Vehicle No, Vehicle Type and Bales will default. Else enter other necessary header level
information available on the challan provided by supplier.
RCSML Page 98
Training Manual - Yarn
RCSML Page 99
Training Manual - Yarn
Select the Relevant Document Type for which IGP has to be processed.
8 OSP
8.9 PO # Receipt
8.10 Inspect
8.11 Delivering
9 Receipt
Receipt is a process which will be performed by Yarn Warehouse to process the receipt for the
consignment received from supplier.
Steps Summary:
Creating a Receipt has following four steps:
Query the expected receipt, Expected receipt line can be queried using any of the following
search criteria:
Purchase Order Number
Purchase Requisition / Internal Requisition
Supplier Name
Shipment Number
Item Code
Date
The following information defaults on the receipt header based on source document used for
receiving and person processing the receipt the:
Receipt Date (System Date)
Received By (User Name)
Supplier name (in case of Receipt against PO, SO)
Shipment Number (in case of Inter-Organization Receipt)
Following window will appear showing all the previous receipts created agains this supplier,
select the relevant Receipt number in which this receipt is to be added.
Select the relevant IGP Number by clicking on DFF as circled in below screenshot.
Following window will appear showing IGP Numbers generated, select the relevant IGP number
and proceed to Receipt Lines.
Lines will default from Purchase Order, Item Quantity, UoM and other data will also default
from Purchase Order. Click the check box and update the quantity if required and save it.
Upon saving the system automatically assigns a receipt number. This receipt number is used to
process inspection, receiving and return to the supplier (If required in case of rejection).
10 Receiving Transactions
Steps Summary:
Creating a Receiving Transactions has following four steps:
Query the Receipt Number against which Inspection of the goods is needed to record. For
Inspection Receipt Number can be queried using any of the following parameters:
Receipt Number
Purchase Order Number
Purchase Requisition
Supplier Name
Shipment Number (In case of Inter-Organization Transfer)
Item Code
Date of Receipt Number
Inspection as highlighted will show as red until the items are inspected and saved. Once the
authorized user in Yarn Procurement department accepts and save the form, Inspection will
automatically turns into Black colour from Red.
Select the check box next to the quantity and click on inspection as highlighted in the above
screenshot, this will open the inspection box.
System will default the total quantity as Accept, enter manually the accepted or rejected
quantity. Create another line for rejected quantity. Click OK and Save, system will
automatically change the inspection colour from Red to Black and Inspection required will be
changed to Inspected as shown in the below screenshot. Re-query again to see the changes.
Once the items are inspected and accepted by user department, stores department will enter
deliver to inventory transaction for receipt items.
Query the Receipt Number against which the goods are needed to invenotrize. For inventorzing
the material Receipt can be queried using any of the following parameters:
Receipt Number
Purchase Order Number
Purchase Requisition
Supplier Name
Shipment Number (In case of Inter-Organization Transfer)
Item Code
Receipt Date
The relevant lines appear based upon the search criteria entered. Now Confirm that
“Destination Type” is Inventory in order to Inventorize the Item.
User will scroll to right side and enter ‘Sub Inventory’ and ‘Locator’ to which the items are to be
delivered.
11Return
Returns is a document which will be used by Yarn Warehouse to process the returns for the
consignment received from supplier.
Steps Summary:
Creating a Return has following three steps:
Query the Purchase Order / Receipt against which return is needed to processed. The respective
line can be queried using any of the following parameters:
Purchase Order Number
Receipt Number
Supplier Name
Item Code
Receipt Date
This window shows the receipt lines against which the item is inventorized or is in receiving.
Enter the following information:
Quantity to be return
Return Type
The return type can be either Supplier or Receiving. If the quantity is to be returned to “In-
Receiving” from inventory, then select Receiving. If the quantity is to be returned to supplier,
then select supplier.
Save your work.
12 Correction
Correction window is used to modify receiving transactions to correct errors. You can correct
any receiving transaction except another Correction transaction and a Return to Receiving
transaction.
Steps Summary:
Entering a correction has following three steps:
Query the Purchase Order / Receipt against which correction is needed to processed. The
respective line can be queried using any of the following parameters:
Purchase Order Number
Receipt Number
Supplier Name
Item Code
Receipt Date