You are on page 1of 1

03

02
01

REV. DATE DESCRIPTION

ORIENTATION:

LOCATION:

LEGEND/ABBREVIATIONS:

DESIGN
CORRIDOOR 1.00
1.30
1.00
DRAWING
PROJECT TITLE:

1.00 BED ROOM MAIN CONTRACTOR :


4.60 4.50
RECEPTION
3.50 CHILDERN 3.50
BATHROOM 3.20
BATHROOM

KITCHEN ROOM

1.90
MEP CONTRACTOR :

1.00 8.60 1.00 3.00 2.20 3.80 3.50

DRAWING TITLE :

DATE: REVISION:

DESIGNED BY: SCALE:


ELITE TEAM 1/50 /A3

DRAWING BY :
NOTES:
ELITE TEAM

CHECKED BY:
ELITE TEAM

APPROVED BY:
YASSER

You might also like