SKRIPT PPT QUIZ BING

Slide 1

Assalamualaikum Wr. Wb

Ok introduce me Muhammad dicky rahendawan absent number 18 here I am the moderator of


group 7. My group consists of jabal thoriq Ibrahim absent number 14, gift wulandari absent
number 15 I am Muhammad dicky rahendawan absent number 18 and savira Damayanti absent
number 26. On this occasion This time our group will present our theme park, namely Merry Go
Park

Slide 2

Theme: the theme of our theme park is fantasy land. The purpose of choosing this theme is to
take visitors on an imaginative tour.

Name: the name of our theme park is Merry Go Park. The name was taken with the hope that
after visiting our theme park visitors can feel a sense of joy

. Location: Our theme park is located in the district, Gondang Legi, Malang Regency. We chose
this location because in the Malang Regency area, especially the southern Malang area, there are
still very few tourist attractions such as theme parks

. Area: Merry Go Park has an area of 6 hectares which contains 7 rides and several public
facilities such as bathrooms, prayer rooms, and food. court 

Slide 3

The following is a map of the location of our theme park.

The first ride is the roller coaster. This ride surrounds the entire theme park area, consists of 25
pairs of seats and has a height of 30 meters. This vehicle has a high speed of 183 km / hour.

The second vehicle is the Ferris wheel. This ride can accommodate 30 people with 2 people in
each cabin. By riding this vehicle, visitors can see the scenery around the theme park

. The next ride is a ghost house. This ride features at least 10 employees wearing ghost costumes
and there are also several supporting properties that add to the spooky nature of this haunted
house.

The next ride is car bombs. There are 10 cars that can be used by both adults and children. Each
car can be filled by 1 to 2 people. Each car is given 15 minutes in one game.

The fourth vehicle is a 3D cinema. This cinema has a total of 30 movable audience seats and is
equipped with glasses that can add to the 3D impression. The film shown is also an animated
film with a duration of 30 minutes
. The next ride is a glass maze. In this vehicle, visitors will be presented with a room and have to
find a way out. Not many visitors will be trapped and confused when looking for a way out
because the reflection from the glass of

the last vehicle is a 360° pendulum ride. This ride can be filled by 50 people. The duration of this
game is 7 minutes. By riding this vehicle, visitors will feel circling above the height and at high
speed.

In addition to the rides in our theme park, there are also public facilities that can be used by
visitors such as bathrooms, prayer rooms and food courts.

Slide 4

Planning and Development Stage

1. planning the overall concept and location

The choice of concept and location is the main thing that we prepare in creating a theme park. As
already mentioned above, the theme taken by our group is fantasy land and the choice of the
place is in the Gondang legi sub-district, Malang district.

2. planning a budget. After the theme and location have been determined, our group immediately
warms up the cost of making the theme park

3. the construction of the rides. After the budget has been set, the next thing to do is the
construction of game rides and public facilities that support

trail rides. After the game rides have been built, the next thing to do is try the feasibility of the
game rides, this is done in order to see whether the rides are safe for use or not by visitors

5. opening of tourist parks. The opening of Merry go park will be held on December 25, 2025.
We chose that date because at that time the school children were on holiday for the turn of the
new year

6. maintenance, continuous evaluation and development. After the theme park has been opened,
the maintenance of cleanliness must continue to be carried out, therefore the maintenance of the
rides must be carried out. In addition, we will always evaluate our theme park, if something goes
wrong then we will always be willing to fix the problem quickly. Later, if it is considered
successful, our theme park will carry out developments on the rides, such as adding new rides
that are more interesting.

Slide 5

1. planning

In this segment we are planning about:


a. planning a big theme park, in making the theme park here we start by determining the theme,
name and location of the theme park development

b. determine what rides are in the theme park and the location of the rides. In our theme park, we
have determined 7 rides that visitors can enjoy. In addition, there are several public facilities that
can be used by visitors. For the placement of our rides are close together, this aims to make it
easier for visitors to find our rides.

c. survey the location of the theme park development and how wide the rides will be built. We
then looked for a suitable location for the creation of the theme park. We chose to build a theme
park in an area that still has few tourist attractions such as theme parks. For the area of each ride
itself, we determine that it will have different sizes depending on needs such as the roller coaster
ride that we make will have a larger size than the glass maze ride

Slide 6

In this segment we are planning about:

a. planning budget the location

location that we took is a location that is not too crowded with residential areas, therefore we will
coordinate with the local government related to the development. For the budget of the location
we choose, we will make an offer so that it can benefit both parties

b. planning budget every rides

later every ride will not have the same budget. Of course the bigger rides will have a more
expensive budget

c. create a budget proposal to attract investors

. In making this theme park, of course, we will make a proposal that will attract investors. Our
target investors are local governments as well as private companies such as suppliers of raw
materials, food and beverage products, paint products

Slide 7

Planning a budget

a. land area 6 hectares 900 billion

area theme park we built on a land area of 6 hectares and with a price of 900 billion rupiah

b. The amount of funds for the procurement of rides is 35 billion

. Each vehicle we target is approximately 5 billion in its construction, therefore 35 billion is


needed to build 7 rides

c. Total labor and architectural costs 7 billion


on each vehicle the cost of our workers and architectural staff is targeting 1 billion, we use this to
pay 100 workers in each vehicle

d. The amount of funds for the construction of the facility is 350 million

for the construction of public facilities such as food courts, bathrooms and prayer rooms. We
have budgeted 350 million

e. Total development fund 42.3 billion The

total development fund needed to build a theme park is 42.3 billion

f. The amount of the rehabilitation and cleanliness fund is 500 million

. We will budget 500 million

. All of the above budgeted funds are converted into rupiah

. Slide 8

Construction of rides

Realizing those plans that have been drawn up at the time of creating the design.

After the planning for the creation of a theme park has been carefully prepared, the next thing to
do is to realize the design

Slide 9

Development time

We need 3 years to build a theme park

In the 36th month we are looking for and determining the location of the theme park
development

In the 30th month we are looking for investors who we will invite you to work together in
making the theme park

. In the 24th month we will start building rides starting from roller coasters to other games such
as pendulum rides and ferris wheels

. In the 6th month we will build public facilities that visitors can later use when visiting our
theme park

In the 3rd month we will start preparing for the opening of our theme park by making banners
and making promotions on social media such as through tik tok, Instagram and facebook

Slide 10
The test of the vehicle on safety, and the assessment of how attractive the ride is

Before we open we will do a test I tried all the existing rides, whether the rides are feasible and
safe for visitors to use. This is to avoid unwanted incidents.

Slide 11

Opening tourist park

. We will give 50% discount to all theme park visitors. The discount can be used for 1 month
after the grand opening of our theme park. For the ticket price from our theme park, each visitor
has to pay Rp. 100,000 but for children aged 2 years and under there is no need to pay

Slide 12

Maintenance, Continuous Evaluation and Development

a. each visitor will be asked to fill out a satisfaction rating form after visiting our theme park

b. look at ticket sales in the last 2 months, if in the last 2 months the number of ticket sales has
decreased then promotional activities will be even more intense to be encouraged

c. in this case we will increase the level of cleanliness on the rides that are dominantly visited by
visitors this is because the more visitors the rides will get dirty quickly. However, that does not
mean that we will not maintain the cleanliness of other rides with fewer visitors

d. every time a visitor gives a complaint after visiting our theme park, we will immediately look
for the source of the problem and immediately find a solution to the problem

Slide 13

That's a presentation from our group. More or less we apologize waassalamualaikum Wr. Wb  