TATA PROJECTS LIMITED TPLAUI-670011 ] /QMDIMS/10 URBAN INFRASTRUCTURE | [STANDARD OPERATING PROCEDURE | Tort | LIET PIT WATERPROOFING METHOD STATEMENT 1. Treatment for LIFT PIT (INSIDE) * Surface cleaning by wire brush, removing loose mortar, dirt, grime etc followed by water cleaning using cleaning agent. + Coving the stab and wall joint using polymer modified mortar. * Sealing of cracks, voids, floor wall junctions, etc., with Protekta Sealant 500 modified mortar: Porosity Reduction * Spraying of Protekta Base which fills the fine pores with crystalline silicate growth, ‘Surface Preparation; + Brush application of Protekta Special Slurry which has a very special chemical, which impregnates through pores and capillaries, + 1 coat of primes MYK Indufloor EPW 44 + Bitumen Free P.U. (polyurethane) elastomeric waterproofing membrane system MYK COAT WPU 1K(E)on the concrete surface To be applied in as a coating to built a thickness of 1.2mm on surface Prepared, fair faced concrete surface, later to be protected as per manufacturers specifications. * Plastering the walls with rich mortar admixed with special admixture Protekta KR2 Emulsion, * Providing a final coat of MYK COAT WPU 4K(E)taken over the coving

You might also like