You are on page 1of 8

Australien – Project – Grain Valley Road - 02/2017

Many thanks to the GUNNEDAH Shire Council, as well as to their great staff,

they have made this successful presentation of TERRA-SYSTEM® in Australia

** GREAT **
All required and desired machines were on the site, to an optimum result.
Project : Grain Valley Road - Dirt Road - Reconstruction
Length: 750m, width: 10m, depth: 25cm = 7500m² in only 2 days

You might also like