Method Statement - Insulation
Method Statement - Insulation
APPROVAL
Sign:
REVISION HISTORY
Revision history and distribution is recorded in the Master Documents’ List, PFL-F-423-001,held by DCC
This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services
1. PURPOSE
The purpose of generating this Method Statement is to define the procedure step by step to implement
the correct practices for Insulation of Vessels and Pipes, Onshore Nigeria through the guideline herein so
as to ensure that the job execution complies with the requirements and serves the intended function to
satisfactory level. This Method Statement refers to various work procedures contained within project
control documents, which explains and covers the Cladding of Ductwork & Piping work
2. SCOPE
This Method Statement refers to various work procedures contained within project control documents,
which explains and covers the Cladding of Ductwork & Piping work.
3. RESPONSIBILITIES
Insulator In-charge
4. TOOLS/EQUIPMENT
- Portable Drilling Machine, Electric Drilling Machine / Grinding Machine & Angle Cutter
- Rolling Machine
- Adjustable spanner
- Swaging Machine
This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services
5. MATERIALS
FOAMGLAS Product, Aluminum Sheet and accessories shall be in line with the approved material
submittal
On receipt of the material at sits, shall be off-loaded carefully at site using necessary manpower and
required equipment to ensure that no damage is caused to the materials, necessary precautions shall be
taken for unloading, shifting & storage. All material packages reaching to site shall be identified as per
package list. Aluminum Sheets will be checked to ensure that it complies with the approved material
submittals in terms of make, thickness etc. Any discrepancies, damage etc., found will be notified and
reported for further action. This shall be in line with PFL material handling and storage procedure (PFL-
All the material shall be verified as per material certification. Tag and nameplate being as
per data sheet.
Items quantity and size of the material shall be as per P.O.
All materials supplied shall be new and undamaged.
All insulation material shall be properly stored and protected from moisture.
Insulation Preparation
o Check the materials as to ensure that the type of the material and thickness are in
accordance with relevant specification and drawings.
o All surfaces to be insulated shall be blast cleaned and painted in accordance to GS-EP-
COR 350/450 specification and remained dry before insulation to be applied.
o Inspect weather condition. Insulation shall not be installed during weather which might
cause the pipe or insulation to become wet when the surfaces are less than 5ºC above
dew point.
This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services
o Make sure that Insulation will not cover the face of gauge glasses, equipment name or
data plates or tags, nor be applied to interfere with dynamic parts of instruments or
equipment.
This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services
8. INSPECTION
- Installation of Cladding Works shall be in line with PFL inspection and test plan documentation
9. ATTACHMENTS
- Risk Assessment
This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.