You are on page 1of 5

NIGERIA LNG LIMITED 08-08-18

Fabric Maintenance Services

WORK METHOD STATEMENT- Page 1 of 5


INSULATION APPLICATION

APPROVAL

Prepared By: Reviewed By: Approved By:

Name: Richard Gideon Tamunodein West Gerard Shaw

Position: Lead QA/QC Technical Ops Manager General Manager

Sign:

REVISION HISTORY
Revision history and distribution is recorded in the Master Documents’ List, PFL-F-423-001,held by DCC

This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services

WORK METHOD STATEMENT- Page 2 of 5


INSULATION APPLICATION

1. PURPOSE

The purpose of generating this Method Statement is to define the procedure step by step to implement

the correct practices for Insulation of Vessels and Pipes, Onshore Nigeria through the guideline herein so

as to ensure that the job execution complies with the requirements and serves the intended function to

satisfactory level. This Method Statement refers to various work procedures contained within project

control documents, which explains and covers the Cladding of Ductwork & Piping work

2. SCOPE

This Method Statement refers to various work procedures contained within project control documents,

which explains and covers the Cladding of Ductwork & Piping work.

3. RESPONSIBILITIES

Insulator In-charge

4. TOOLS/EQUIPMENT

- Portable hand tools

- Portable Drilling Machine, Electric Drilling Machine / Grinding Machine & Angle Cutter

- Rivet Gun / Sealant

- Rolling Machine

- Scaffolding with platform

- Adjustable spanner

- Swaging Machine

This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services

WORK METHOD STATEMENT- Page 3 of 5


INSULATION APPLICATION

5. MATERIALS

FOAMGLAS Product, Aluminum Sheet and accessories shall be in line with the approved material

submittal

6. HANDLING & STORAGE

On receipt of the material at sits, shall be off-loaded carefully at site using necessary manpower and

required equipment to ensure that no damage is caused to the materials, necessary precautions shall be

taken for unloading, shifting & storage. All material packages reaching to site shall be identified as per

package list. Aluminum Sheets will be checked to ensure that it complies with the approved material

submittals in terms of make, thickness etc. Any discrepancies, damage etc., found will be notified and

reported for further action. This shall be in line with PFL material handling and storage procedure (PFL-

ST-SO-001, Rev: 02 ISSUE 01)

 All the material shall be verified as per material certification. Tag and nameplate being as
per data sheet.
 Items quantity and size of the material shall be as per P.O.
 All materials supplied shall be new and undamaged.
 All insulation material shall be properly stored and protected from moisture.

Insulation Preparation
o Check the materials as to ensure that the type of the material and thickness are in
accordance with relevant specification and drawings.
o All surfaces to be insulated shall be blast cleaned and painted in accordance to GS-EP-
COR 350/450 specification and remained dry before insulation to be applied.
o Inspect weather condition. Insulation shall not be installed during weather which might
cause the pipe or insulation to become wet when the surfaces are less than 5ºC above
dew point.

This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services

WORK METHOD STATEMENT- Page 4 of 5


INSULATION APPLICATION

o Make sure that Insulation will not cover the face of gauge glasses, equipment name or
data plates or tags, nor be applied to interfere with dynamic parts of instruments or
equipment.

7. INSTALLATION PROCEDURE CLADDING OF DUCTWORK & PIPEWORK

7.1 Piping Insulation


7.1.1 Insulation Construction shall be performed after all the insulation preparation have been
finished and released.
7.1.2 Factory fabricated sectional pipe insulation shall be applied in staggered joint
construction and secured with wire loops or bands. On multiple layer construction, all
joints shall be lapped one-half of each section between layers. Each layer shall be
secured separately. All joints shall be securely butted and all cracks, joints, etc. shall be
filled with insulating sealant as appropriate.
7.1.3 Mastic sealer shall be used around pipe supports where the insulation is punctured by the
support.
7.1.4 Any cracks or openings that occur in the insulation or weather-proofing are to be filled in
with additional insulation or weather-proofing to provide a smooth sealed surface
7.1.5 At all flanges, unions, and pipe terminations, the pipe insulation shall be beveled at a
45°angle to facilitate remove of flange bolts and union collars without damage to the main
pipe insulation and metal jacketing. A screwed and sealed metal cover shall be installed.
7.1.6 All openings in metal jacketing for nipples, pipe supports, etc. are to be neatly cut to
provide a tight fit and shall be thoroughly sealed and weather-proofed to prevent moisture
from penetrating under the jacket. Openings shall be fitted with a metal collar or suitable
flashing embedded in sealant and screwed firmly on place.
7.1.7 Insulation shall be covered with metal jacketing lapped a minimum of 50 mm on all seams
and secured with screws and bands, locating one band at each lap joint and spaced a
maximum of 450 mm on center. Vertical jacketing shall be supported with “S” clips.
7.1.8 All insulation shall be clad with metal jacketing. Jacketing shall be installed to shed water
and protect against wind and blowing rain.

This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.
NIGERIA LNG LIMITED 08-08-18
Fabric Maintenance Services

WORK METHOD STATEMENT- Page 5 of 5


INSULATION APPLICATION

7.2 Insulation on Vessels


7.2.1 Vessels shells shall be insulated with factory fabricated insulation curved or grooved to fit
the vessel shell contour. If additional layers are required, insulation shall be installed with
staggered joints.
7.2.2 Vessel heads shall be insulated in the same manner as the shell.
7.2.3 A band shall be placed adjacent to heads of horizontal vessels and at the top sheet on
vertical vessels to secure flashing between head.
7.2.4 Insulation on exchanger flanges and heads shall be installed so as to be removable
without damage to the main shell insulation.

8. INSPECTION

- Installation of Cladding Works shall be in line with PFL inspection and test plan documentation

9. ATTACHMENTS

- Risk Assessment

- Quality control procedure

This document contains confidential information of PFL Engineering Services Ltd. Receipt or possession does not
convey any right to loan, sell or otherwise disclose said information. Reproduction is not permitted without the
written approval from the CEO.

You might also like