18190122, 927 AM ‘Six Sigma DMAIC - Control Phase
= MENU
Six Sigma DMAIC — Control Phase
‘The last phase of Six Sigma’s DMAIC model is the Control phase. The focus of this stage is to
‘make sure that the action item ereated in the Improve phase is well-implemented and
‘maintained, Several tools are used in this stage to make sure that variables are within its limits
Activities such as checking the proper execution of initiative(s), control charts are being
employed, and effectiveness of the initiatives are also evaluated. To standardize the course of
action and documents, the guidelines and the responsibilities are also shared with the proper
Personnel who are directly affected by the project shall be trained and monitored as well.
This phase uses several tools. The most common tool is the Control Chart. Project owners watch
the progress of the process through the control chart. It is also a must that project owner can.
interpret the control chart so that the project team can create a reference log signifying what the
project owner should look for. ‘The charts are differentiated through the control limits set of three
sigma from the course mean.
hitpsiwowwhatiesinsigma,nel'sxcslgma-cmale-contro- phase!18130122, 927 AM ‘Six Sigma DMAIC - Control Phase
Control Chart
Process control is the carrying out of identifying and employing practical actions and
‘measurements to make sure that the course meets the defined standards and requirements of the
customer, In control phase statistical means are applied to the course in order to determine the
unusual cause from a frequent cause of course variation. This is called statistical process control.
‘This is done by plotting the figures over time and matching up to the results to the control limits.
‘The main reason of using control charts is to perceive the assignable causes of course variation so
that examination and counteractive action will be carried out to eliminate the assignable causes of
process discrepancy before there is an excessive number of conforming units produced or
data, and the discrete data, Examples of continuous data are curreney, weight, time, temperature,
and the like. Here, data is acquired is through measurement. This is characterized with no gaps
amongst observations. Discrete data on the other hand, can be achieved through counting, Most
ofthe time gaps are present. Examples are good or bad, yes or no, pass of fail, one or two.
‘Example of variable chart is the I-MR chart. This is applied when only one capacity is taken on
cach sampling period. It has two charts: the Individual chart represented by I or X. This shows
the actual capacity against sampling time. This is used to monitor the variability between two
samplings. The Moving Range chart represented by MR presents the range value between the
previous and the current sampling capacity against the sampling time. This is used to observe the
‘unpredictability within the last two samplings.
hitpsswww whatissinsigma netisx-sigma-dmaic-contrl- phase! 2918190122, 927 AM ‘Six Sigma DMAIC - Control Phase
scrtorengtermsabi]
Individuals and Moving Range
‘Trends should be reviewed periodically and should spot good change of process performance as
shown on the control chart. If something similar is spotted and the reason is maintained in the
current course. recalculate the contral limits from the date the nositive chanee was detected.
1 "
signs. This can anticipate the course performance. Course changes are handled effectively and.
steadiness is ensured in the event of new conditions. This also allows early discovery of
impending causes or problems before it becomes a problem,
Lava Moist-Chocolatey Merienda on
Lava Cake Choco is the moist sult snack cake filed with chocolatey
goodness, Shop now.
{Be Lemon sare ar cate
SHOP NOW
hitpsswww whatissinsigma netisx-sigma-dmaic-contrl- phase! 3918130122, 927 AM ‘Six Sigma DMAIC - Contro! Phase
Proceste | COreetnen | contol ttetods | Rexponsbisty | “PCMSRORLIMES | Response Plan
OCAP Table - Out of Control Action Plan Table
‘The table above is a draft of OCAP. The continuous procedure should be noted under the process
step header. Control Item indicates the key course inputs that need to be managed to meet the
production requirement. It should also include the key course outputs that need to be observed
for signs requiring awareness. Control method should include control chart, metries, after action
reviews, approvals, and trainings. Responsibility notes the group or an individual who owns the
job. Specification Limits/Requirements will show the customer measurement limits or
requirements of the internal performance. Response plan should note the counteractive actions to
solve/contain the problem and reduce losses. The table below shows an example of an OCAP:
hitpsswww whatissinsigma netisx-sigma-dmaic-contrl- phase!
4918190122, 927 AM
‘Six Sigma DMAIC - Control Phase
pewasup | cntalten | Gon Speco ns) =
2s. 22 Se = seer
i-rantnocaty aaa een
Jam ierrrsomy feats 7] une . vox (ening
feseseatperaget nora broom p ones
reer at Error eomtene ocplte
erngoncnee (OA a epndet on fete inane
Jcomvanarontieg meet | mene | cutriad | races pectin anti
[eee tne compton
[cunt ascwieeonicaa
Kates ny anes
domssnprct em esd
[een nse aoetateie Nee eters inl
Jeconosnesmonaara fren convcng | SME | culriend |S pepeigg enters beer Ame
feminesyten est motenre Egon
Iveaseestbecmmeaty
[crate person: Team
Jresnscscot aa et bas cvy eon woe
[torch ameter sacs) | ie wo [Eiicdnte nto
buincses en ytermopoas
(snyea eomiurens aerate
{otton- Fite recall mentoring
OCAP Table Feamnle
must be available, controlled and trained to,
Visual Management is also another tool that can be used in Control phase. This shows the
‘management of course performance by majorly displaying updated course standards, scorecards
on performance, production goals, and other useful course and performance data in the work
place. The objective of this tool is to drive the right behavior.
Examples of Visual Management are job aids posted on each work post, whiteboards showing
daily progress against target, individual or team scorecards displayed in the team’s common area
which can be the subject of discussion during team huddles.
hitpsswww whatissinsigma netisx-sigma-dmaic-contrl- phase!
ry18130122, 927 AM ‘Si Sigma DMAIC - Control Phase
Visual Management gives a real-time and clear line of sight to significant performance
information. This also enables quick detection of performance concerns. Since this shown in a
common area, this enables leads to deliver prompt response. VM also enables constant
enhancement mindset that can determine chances for improvement.
Another tool tat can be used during the Control phase is the Operating Rhythm, This is a set of
structured, mutually dependent interactions that manages and shows performance information
to allow stakcholder set to effectively, consistently, and proactively express control operations. It
provides a shared and disciplined messaging method through which stakeholders are defined
with roles, agendas, and outcomes.
Operating Rhythm holds rapid employment of tasks, messaging, and ideas through identified and
wrranged interactions. It allows quick response and surfacing to process problems, sel
pr
issues, and individual performance. Each communication has a stated objective, clear
‘membership, set measures, designated leader, defined actions, and frequeney. By connecting the
suitable group members in a closely controlled structure, operations become dependent on
process rather that dependent on individuals.
hitpsiwowwhatiesinsigma,nel'sxcslgma-cmale-contro- phase!18130122, 927 AM ‘Six Sigma DMAIC - Control Phase
Operating Rhythm Chart
Productive assembly do not turn out by accident. There should be preparation, process, content,
and follow-up. Operating Rhythm spans the entire organization thus it is imperative that
everything, all factors, all aspects of the project is discussed.
PREVIOUS Post: Six Sigma DMAIC - Improve Phase
NEXT PosT: Six Sigma Yellow Belt
hitpsswww whatissinsigma netisx-sigma-dmaic-contrl- phase!
11918190122, 927 AM ‘Six Sigma DMAIC - Control Phase
BZOIe—apRTIESE
sricky
10 Things You Should Know About Sx Sigma
Famaya Six Slama Peonle
‘Conte System Expansion
Insta Project Management
Supply Chain an Lopisies
Visual Management
Balch Process Optimization
Digital Twin Creaton: UUzation of Indust! Simulation to Quickly Optimize Indust Sites n a Rapily Changing Economy
Industy 4.0: Enhancing Digital Transformation In a COVID-18 Era
‘The Industral Vsion for 2025: Light Out Factores
|& Space Faring Nation
hitpsswww whatissinsigma netisx-sigma-dmaic-contrl- phase! ae8190122, 927 AM ‘Si Sigma DMAIC - Control Phase
MarR ox
‘The Honda Brio
© Honda Cor Pitppines Open
Bezore
Copyright © 2022
Oezore repono ad
hitpsiwowwhatiesinsigma,nel'sxcslgma-cmale-contro- phase!
ag