05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
1. The handling of the Seawater Lift Pump is designed taking into account that the transport
will be on the Cable Deck
2. A monorail above the each Seawater Lift Pumps will be designed for these Manoeuvres.
3. From the self-propelled platforms, first install the monorail trolley using a dedicated padeye
and a chain on lever pulley. Remove the installed stopper guide, lift and slide the monorail
trolley into the monorail beam.
4. Lift the pipe spool above the pump and move to the storage are considered for this closed
to pit. To access the pump, the spools must first be removed from inside the caisson
following the same steps as for removing the pump itself.
5. To avoid damage, flexible steel slings could be used.
6. Using the lifting points, hook the pumps. (Picture 1. Step 1)
7. Adjust tension to fit pump weight and remove the bolts
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
8. Lift the pump section until it comes completely out of the Caisson. (Picture 1. Step 2)
9. The monorail will be able to move the Pump to the close hatch, which will communicate
with the Cable Deck (Picture 1. Step 3)
10. Down the Pump until support completely on the Cable Deck. (Picture 1. Step 4)
11. Once the pump is on the cable deck (in vertical position) it will be attached with a sling at
the bottom of it and helped by a hoist installed on the monorail designed for the other pump
installed in the same pit
12. Rotate the pump until it is placed in a horizontal position on a support. The sling/chain shall
be routed through a temporary guide which shall be placed on the border of the hatch In
order to prevent damage. (Picture 2. Step 5 & 6)
13. Move the pump to the Laydown Area. These can be stored in the designated laydown area
Restricted © Dragados Offshore SA, 2021. All Rights reserved.
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
29. Securely mount the junction box rack and water tank onto the floor.
30. Connect the power, earth conductor and sensor cables to the junction box.
31. Connect the motor filler hose to the water tank. (See Picture 6)
Portable handling equipment:
Trolley beam and hoist (8.000 kg)
Safety harness
Self-propelled platforms
Roller Skid
Standard hand tools for monorail stoppers
Hand chain hoist (1.000 kg)
Hand chain hoist, Trolley beam, Self-propelled platform, Roller Skid & Gantry Crane
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
Restricted © Dragados Offshore SA, 2021. All Rights reserved.
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
Restricted © Dragados Offshore SA, 2021. All Rights reserved.
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
Restricted © Dragados Offshore SA, 2021. All Rights reserved.
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
05 BW51-EC-BOC-000091
Revision Date Originator Doc.-ID
02.09.2022 OS00003_EP_GM500_BW51_EC035_480002_EN
NOTE 10 indicates Laydown Area for storages in two area. East and west zone of each pit
for the storage of the caisson flange and GRE pipe spool (Picture 7)
Restricted © Dragados Offshore SA, 2021. All Rights reserved.
To transport along the cable deck and/or in case it has to be moved for any repairs to an
onshore workshop, a special support will be designed to allow this operation
to be carried out.
Similarly, for the storage of riser sections during pump maintenance, a structure will be
considered on the cable deck to allow the pipes to be stored on top of each
other. In order to perform this task of placing one pipe on top of another, a
portable gantry crane with sufficient height and spam will be used