You are on page 1of 1

1. What should be the lowest gap between the stacks and the walls?

Ans: 15 cm
Ref: BNP 22, Chapter 9, Art 3 (a)
2. What arrangement is to be done when normal messing system is not possible in the ship?
Ans: Action messing
Ref: BNP 22, Chapter 11, Art10
3. Who is responsible for the messing allocation of the ships company?
Ans: XO of the ship
Ref: BNP 22, Chapter 11, Art 5

You might also like