Boe Not PROPIFRIPEZS Cost Centers List Rev: ot Date: 01-Dec-2004 Page 2 of 5 Date: 29 - May - 07, 11:48:19AM DESCRIPTION vom Manhour/Uom Dat Civil oat Earth Work cctr.21110 Clearing / Grubbing / Stripping / Top Soll Removal ‘Sub CCTR. 211100002 Grading / grubs / shrubs / stumps / hedges / bush (upto 1Sem m2 0.0200 depth) without compaction & haulage ‘Sub CCTR- 211100004 Stripping / Top soll removal upto 30 em depth without m2 0.0300 compaction and haulage Sub CCTR. 211100006 Stripping /Top soll removal from 30 to 50 cm depth without m2. 0.0300 ‘compaction and haulage ccrR-21120, General Open Section Excavation by Machine (without dewaterin ‘Sub CTR. 211200001 Open section Excavation in Medium soil(upto 2m depth) & m3. 0.0200 hhaul upto stockpile area. (Within 1 km) ‘Sub CCTR. 211200002 Open section Excavation in Medium soll(2to.4m depth) & = m3, 0.0200 haul upto stock pile (Within 1 km) ‘Sub CTR. 211200003 Open section Excavation in Hard soll (upto 2m depth) & haul m3 0.0300 ‘upto stockpile area, (Within 1 km) ‘Sub CCTR. 211200004 Open section Excavation in Hard soll (2t0 4m depth) & haul m3 0.0300 ‘upto stockplle area (Within 1 km) ‘Sub CCTR- 211200005 Open section Excavation (Restricted space) in rock with m3 4.0000 blasting & haul upto stockpile area (Within 1 km) Sub CCTR. 211200006 Open section Excavation (Free space) in rock with blasting & m3 1.0000 ‘haul upto stockpile area (Within 1 km) ‘Sub CCTR- 211200011 Dredging & haul upto stockpile area (Within 1 km) m3 0.5000 corr21122 ‘Structural / Fixed Section Excavation by Machine (Without Dewate Sub CCTR. 211220001 Fixed section Excavation by machine in Medium soll (upto2m m3 0.8000 ddopth) & haul upto stockpile ‘Sub CCTR. 211220002 Fixed section Excavation by machine in Medium soll (2to4m = m3 0.8000 depth) & haul upto stockpile ‘Sub CCTR- 211220003 Fixed section Excavation by machine inMedium soll (below m3 11.0000 4m depth) & haul upto stockpile Sub CCTR. 211220007 Fixed section Excavation in Hard soll (upto 2m depth) & haul — m3 2.0000 upto stockpile ‘Sub CCTR. 211220008 Fixed section Excavation by machine in Hard (2to 4m depth) m3. 2.0000 {& haul upto stockpile ‘Sub CCTR. 211220009 Fixed section excavation by machine in Hard soll (below 4m) m3 2.0000 & haul upto stock area coTR.21124 Structural | Fixed Section Excavation by Hand (Without Dewaterin ‘Sub CCTR. 211240001 Fixed section Excavation by hand in Medium soll (upto 2m) & m3 4.0000 haul upto stockpile ‘Sub CCTR. 211240002 Fixed section Excavation by hand in Medium soil(from2to4 m3 6.0000 1m) & haul upto stockpile Sub CCTR. 211240003 Fixed section Excavation by hand in Medium soll(below 4m) m3 6.0000 4& haul upto stockpile ‘Sub CCTR. 211240007 Fixed section Excavation by hand in Hard soll (upto2m)& m3 10.0000 hhaul upto stockpile ‘Sub CCTR. 211240008 Fixed section Excavation by hand in Hard soll (from 2t04m) m3 12.0000 ‘& haul upto stockpil Sub CCTR. 211240008 Fixed section Excavation by hand in Hard soil(below 4m) & m3. 46.0000 haul upto stockpile ecTR-21130 ‘Back Filing General / Open section with compaction ‘Sub CCTR- 211300001 General / Open section backfilling with excavated material m3 0.1500 (Hauled from stockpile) Sub CCTR. 211300002 General / Open section backfilling with borrow (sand, clay) m3. 0.1500 material ‘Sub CTR. 211300003 General / Open section backfilling with borrow (granular) m3 0.1500 material corr21131 Back Filling Structural / Fixed Section with Compaction Sub CCTR- 211310010 Structural Fixed section back filling and compaction with m3 2.8000 Excavated material (Hauled from stock ple) Sub CCTR- 211210020 Structural Fixed section back filling and compaction with m3 2.8000 Barrow material (Sand, clay) ‘Sub CCTR- 211310030 Structural Fixed section back fling and compaction with m3 2.8000 Barrow material (Granular) ccrr.21132 Formation of Embankment (with compaction } ‘Sub CCTR. 211320010 Formation of compacted Embankment with Excavated m3 0.1500 ‘material (Hauled form Stockpile) ‘Sub CCTR- 211320020 Formation of compacted Embankment with Barrow material m3. 0.1500 (and,clay) Sub CCTR- 211320030 Formation of compacted Embankment with Barrow material m3 0.2000 (Gravel, moorum)) “This documents irtollctus! Property of Descon Engnoering Limited. Any wnsuthorized use including the modieston and reproduction of he contents ity prone.) Copyighis Ordnance 2002 Al Rights Reseed, Doc No: PROPTFRIFROS Cost Centers List Rev. ot Date: 01-Dec-2004 Page 3 of 5 Date: 29 - May - 07, 11:48:19AM DESCRIPTION vom | Manhouritom Dat ha SubCoTR. 211320010 Formation of compacted Embankment wth Excavated ms 0.1500 ‘material (Hauled form Stockple) ‘sub CcTR- 211320020 Formation of compacted Embankment with Barrow material m3 0.1500 subcorR: 211320090 Formato of compacd Embankment wth Barrow material m3 o.2000 (Gravel, moorum) comr21135 Fill without compaction ‘Sub CCTR- 211350001 General fl by machine without compaction m3 0.0300 Sub CCTR- 211350002 General fl by hand without compaction m3 4.2000 Sub COTR. 211350003 General fil by machine / hand without compaction m3 0.4000 corr-21149 Disposal SubCCTR: 211400001 Disposal of surplus soll/ debris upto 5 Km m3 0100 Sub CCTR- 211400002 Disposal of surplus soll/ debris 5 to 10 km m3 0100 ‘Sub CTR: 211400030 Disposal of Surplus soll/ debris 10 to 20 Km m3 0100 Sub CCTR- 211400040 Disposal of surplus sll/ debris 20 to 30 Km m3 0100 Sub CCTR- 211400050 Disposal of surplus soll/ debris 30 to 40 Km m3 0100 Sub CCTR- 211400060 Disposal of surplus soll/ debris more than 40 Km ma 0%00 come-21145 Compaction Sub COTR. 211450001 Compaction of earth in Fixed section (189 mm depth) ma 02500 Sub CCTR. 211450002 Compaction of earth in Open section (150 mm depth) m3 0.1000 ‘SubCCTR: 211450003 Vibrofiotation/ Deep Vibration m 4.2000 comr2i1ss Shoring (Erection & Stripping) ‘Sub CCTR. 211850001 Erection of Shoring for excavation Depth 2~ 4 meters me 2.5000 ‘Sub CCTR- 211550002 Erection of shoring fr excavation Above 4 meters depth ma 4.0000 com-21160 Termite Proofing / Treatment Sub CCTR. 211600001 Termite Treatment me 0.0200 core21170 Dewatering SsubCoTR. 211700010 Extra over for excavation with dewatering (for soll below m3 2.5000 existing water level), corr-21180 Boring Dring, ‘Sub CCTR. 211800010 Boring for pump installation Dia 4” to 6* depth up to 15 m m 0.2000 Sub COTR. 211800020 Boring for Piles cia 200 mm to 600 mm depth upto 12 m m 0.2500 ‘Sub CCTR: 211800020 Boring for Piles dia 600 mm to 1000 mm depth upto 12mm 0.3000 Sub CoTR- 211800040 Boring for Piles da 1000 mm f0 1500 mm depth up to 12mm 0.3600 = 0.2000 ‘Sub CCTR- 211800050 Extra over for Boring of pile dia 300 mm to 600 mm depth ‘greater than 12m ‘Sub CCTR- 211800060 Extra over for Boring of pile dia 600 mm to 1000 mm depth 0.3600 ‘greater than 12m Sub CCTR. 211800070 Extra over for Boring of pile dia 1500 mm to 1500 mm depth 0.4000 ‘greater than 12m a G22 Concrete ccTr21210 Cement Concrete Production and Supply at Location Sub CCTR- 212100001 Cone. Production by Batch Plant, G-20 (1:3:6), OP m3. +1000 ‘Sub CTR. 212100002 Conc. Production by Batch Plant, G-30(1:2:4), OP m3 4.0000 ‘Sub CCTR- 212100003 Cone. Production by Batch Plant, G-40(1:1:2), OP m3 1.0000 Sub CCTR- 212100004 Cone. Production by Batch Plant, 6-20 (1:3:6), SR. m3 4.0000 ‘Sub CCTR: 212100005 Cone. Production by Batch Plant, G-30 (1:24), SR m3 1.0000 ‘Sub CCTR- 212100008 Cone. Production by Batch Plant, G-40(1:1:2), SR. m3. 4.0000 ‘Sub CCTR. 212100007 Gone. Production by Mixer Machine, G-25(1:2.5:5) , OP m3 5.0000 ‘Sub CCTR. 212100008 Cone. Production by Mixer Machine, G-30(1:2:4) , OP m3 5.0000 ‘Sub CCTR- 212100009 Conc. Production by Mixer Machine, G-40(1:1:2), OP m3 5.0000 Sub CCTR- 212100010 Cone. Production by Mixer Machine, G-25 (1:2.5:5) SR. m3 6.0000 “hie documents irttecual Popa of Descan Engineering Lined. Any unauthorized use, ncudng te modification ad reproduction oe content is tty prohibited) Copyrghis Ordnance 2002, Al gree Reserved, Dac Nar PROPFRIPEIS Cost Centers List Rew. 01 Date: 01 - Dec=2004 Page 4 of 5 Date: 29 - May - 07, 11:48:194M DESCRIPTION voM | Manhour/vom oa Ca ub CeTR- 212100008 Cone. Production by Mixer Machine, G-20(1:2:4), OP ma 5.0000 Sub CCTR- 212100008 Cone. Production by Mixer Machine, 40 (1:1:2), OP m3 5.0000 sub CeTR- 212100010 Cone. Production by Mixer Machine, 6-25 (1:25:5) SR ma 5.0000 Sub CCTR- 212100011 Cone. Production by Mixer Machine, G-90(1:2:4), SR m3 5.0000 ‘Sub CCTR- 212100012 Cone. Production by Mixer Machine, 6-40 (1:1:2), SR ma 5.0000 ‘Sub CCTR- 212100025 Cone. Production by Batch Plant, G45 (14:8), OP ma 1.0000 ‘sub CCTR- 212100028 Cone. Production by Batch Plant, G15 (14:8), SR ma 1.0000 Sub COTR- 212100027 Cone. Production by Mixer Machine, G-15 (1:48) , OP m3 5.0000 Sub CeTR- 212100028 Cone. Production by Mixer Machine, G-15 (1:48), SR. ma 5.0000 Sub COTR- 212100083 Cone, Production by Batch Plant, 6-35 1:1.5:3) , OP m3. 1.0000 Sub CoTR- 212100024 Cone. Production by Batch Plant, 6-35 :1.5:3), SR ma 1.0000 Sub CCTR- 212100035 Cone. Production by Mixer Machine, G25 (1:1.5:2), OP m3 5.0000 ‘Sub CCTR- 212100038 Cone. Production by Mixer Machine, G-35(1:1.5:3) SR ma 5.0000 ‘Sub COTR- 212100500 Extra-over for Red-oxie (5 Kolm3) added Concrete m3 oro Sub CCTR- 212100510 Extra-over for Micro Silica In Concrete m3 100 Sub CCTR- 212100520 Cone. Production by Batch Plant, 6-10 (:6:12), OP m3 1.0000 Sub CCTR- 212100530 Cone. Production by Batch Plant, G-25(125:5), OP m3 4.0000 sub CeTR- 212100540 Cone. Production by Mixer Machine, G-10 (1:6:12), OP ma 5.0000 Sub CCTR- 212100550 Cone. Production by Mixer Machine, G-20 (1:6), OP m3 5.0000 sub CoTR- 212100860 Cone. Production by Batch Plant, G-10(1:6:12) SR ma 1.0000 Sub CCTR- 212100570 Cone. Production by Batch Plant, G-25(1:25:5), SR m3 1.0000 ‘Sub CCTR- 212100880 Conc. Production by Mixer Machine, G-10(1:6:2), SR ma 5.000 ‘Sub CCTR- 212100580 Cone. Production by Mixer Machine, 6-20(1::6), SR ma 5.0000 Sub CCTR- 212100600 Haulage only of concrete to 5 km away from batching m3 .0100 ccrR21215 supply of Roady Mix Conerete Sub CCTR- 212150005 Supply & Haul Ready Mix Concrete C-10(OP) m3 0.0000 Sub CCTR- 212150010 Supply & Haul Ready Mix Concrete 6-10 (SR) ma 0.0000 Sub COTR- 212180015 Supply & Haul Ready Mix Concrete 6-15 (OP) m3 2.0000 ‘Sub CCTR- 212150020 Supply & Haul Ready Mix Concrete C-15 (SR) ma 0.0000 ‘Sub CCTR- 212160025 Supply & Haul Ready Mix Concrete C-20 (OP) m3 0.0000 ‘Sub CCTR- 212150030 Supply & Haul Ready Mix Concrete C-20 (SR) m3 0.0000 Sub COTR: 212150035 Supply & Haul Ready Mix Concrete 6-25 (OP) ma 20000 Sub COTR- 212150040 Supply & Haul Ready Mix Concrete 6-25 (SR) m3 0.0000 sub COTR- 212180045 Supply & Hau! Ready Mix Concrete 6-30 (OP) ma 0.0000 Sub COTR- 212150050 Supply & Haul Ready Mix Concrete C:30 (SR) m3 0.0000 ‘Sub CCTR- 212150055 Supply & Haul Ready Mix Concrete C-35 (OP) ma 0.0000 ‘Sub CCTR- 212150060 Supply & Haul Ready Mix Concrete C-35 (SR) m3 0.0000 ‘Sub COTR: 212150085 Supply & Haul Ready Mix Concrete C-40 (OP) ma 0.0000 Sub CCTR- 212150070 Supply & Haul Ready Mix Concrete C-40 (SR) m3 0.0000 Sub Cer: 212150100 Extra Over for Miroslica ma 0.0000 Sub CCTR- 212180105 Extra Over for Red Colouring Concrete m3 0.0000 Sub COTR: 212180110 Supply & Haul Ready Mix Fireproof Conerete (with ative) m3 0.0500 su core. 212150115 Supply & Haul Ready Mix Fireproof Concrete (wth adtive) m3 0.0500 cotr-ztz0 ——_Conerote Placing tn SubStructure Sub CCTR- 212200001 Concrete Placing in Substructure by Concrete Pump/ Crane m3 6.0000 sub corR- 212200002 Concrete Placing in substructure by wheel barrows m3 10,0000 “This document sna! Property of Descon Engineering Lied. Any unauthorized use, including the medfeatlon and reproduction ofthe content is sty probed (c) Copyrights Orsnance 2002. Al Fights Reserved RAE Cost Centers List Rev: 01 Spee Page 5 of 5 Date: 29 - May - 07, 11:48:19AM. oa ney eoany soe al = Son so ooo me Sl . i cin sina" camer peignerontmiyomeethne 2 em same smepercrreeetyen = ce Som sme Goenrnayocerncrsomanitvied am Sim sie Rebate ptm tte i ee ee ee om eee tas ‘Sub CCTR- 212350004 Placing of fire proof concrete by spray application (Guniting m2 0.1000 Secs son soe SSI ey ome su comm: 212950008 Flag tre proof concrete on struct (50mm ih, by m2 s.eo00 uncer. 212950010 Placing offre proof concrete on Equipments (0mm hi by ma 2.8500 sun comm: 212950110 Sply and placing of Ready mix repret concrete (2hour m2 10800 rating) with guniting (complete job with reinforcement) by ae So ee in sco come eg gnemarene/heenteeeiaee tam ssill (Excl. Formwork) es ea Ue cael ee ot — ccm” emma toes sn Soa seen eeempenmacomaacicie mo ee es CCTR-21270 cage acim naman retina mmnsspn Gms) md Sct some peta ae wom sem EE pcyceaespancaemins mae (PCC) Grout (incl. Formwork) mat tome Leet SS eee cin sot Coa cr oy ee ~ tm Sree emmepeeend = = =e ems "remaert So ee eee cases a = ee = = crass heater ooo om sea tcicsciiyctette tes nt ee wa ee ee = some cee cant eee tietttetvertis — ecrR-21390 Form Work Repair and Mainonance a CCTR: 218150004 Erection of C1. cover / grating with frame Inc. grouting ton 0.0000 Sub CCTR- 218180050 Installation of wooden hand ras (banister) with bluster m 5.0000 ‘Sub CCTR- 218150060 Installation of Aluminium hand rails (banister) baluster m 25000 ‘Sub CCTR: 218150070 fabrication and erection of MS. 6.1 Hand rail (banister) with 2.8000 Sub CCTR. 218180080 Erection of Guard ral with chain m 0.7000 Sub CCTR: 218150090 Erection of M.S rails for transformer crane with expansion 2.0000 bolt & anchor (8 kgm) ‘Sub CCTR: 218150100 Fabrication of top barrier size (150 mm x 8M) 10s 15.0000 SuDCCTR: 218150110 Erection of stop barier (150 mm x 8M) roe 7.5000 ccrR-21820 Plumbing and Sanitation Sub COTR- 218200001 Fixing of wash basin (without faueot) os 0000 ‘Sub CCTR: 218200002 Fixing of wast pipe / wash basin pedestal 108 1.8000 ‘Sub CCTR- 218200003 Fixing of bath room micro (18" X24") 108 1.5000 Sub CCTR- 218200006 Fixing of soap ish / dispenser tooth brush holder 0 4.0000 Sub COTR- 218200005 Fixing of towel all ros 1.0000 sub CCTR- 218200008 Fixing of tllet paper holder / dispenser 108 4.0000 ‘Sub CCTR- 218200007 Fixing of W.C. (European fype) with Mush ester tank 108 6.0000 ‘Sub CCTR: 218200008 Fixing of WC. (Indian type) without flush tank os 16.0000 Sub CCTR- 218200009 Fixing of Urinal 08 6.0000 supCoTR: 218200010 Fixing of Faucets 108 1.5000 ‘Sub CCTR: 218200011 Fixing of Shower! Telephone or Muslim Shower 08 1.8000 SubCCTR: 218200012 Fixing of water heater (Geyser) 08 18.0000 Sub CCTR: 218200013 Fixing of Fiberglass tank (500 G~ 2000 6) 10s 8.0000 sub Cor: 218200014 Fixing of bathroom shelf 108 1.9000 Sub CCTR: 218200015 Fixing of bathroom Tub, complete with supports 08 410.0000 Su>CCTR: 218200018 Fixing of hand dryer os 2.0000 Sub CCTR: 218200017 Fixing of accessory tray ros 4.0000 SwCCTR: 218200018 Fixing of waste receptacle os 1.0000 sub CCTR- 218200019 Fixing of Kitchen Sink os 8.0000 ‘Sub CCTR- 218200020 Fixing of Emergency Eye wash / Shower os 2.0000 suo Cor: 218200021 Fixing of Water fiers ( Cartridge syle, ert & dust type) os 3.0000 ‘This documents nllactua! Propary of Descon Engiesrng Limited. Any unauthorized ut, ung te moileaton and reproduction ofthe content cy prohibe() Copyrights Ordnanes 2002. Al Fights Reserved Doc No! PROPIFRNCEZS Cost Centers List Rev: 01 Date: 01 - Dee-2004 Page 11 of 5 Date: 29 - May - 07,11:48:19AM DESCRIPTION vom Manhouriom Dat Char Sub CCTR- 218200018 Fixing of waste receptacle os 1.0000 ‘Sub CCTR: 218200019 Fixing of Kitchen Sink nos ‘8.0000 Sub CCTR- 218200020 Fixing of Emergency Eye wash Shower ros 8.0000 ‘Sub CCTR- 218200021 Fixing of Water fillers ( Cartridge style, dirt & dust type) os 3.0000 ‘Sub CCTR: 218200022 Cast Iron gate valves dia 1" os 0.2000 Sub CCTR. 218200023 Cast iron gate valves dia 1-1/2" os 0.2500 ‘Sub CCTR. 218200024 Cast Iron gate valves dia 2" os 0.2500 Sub CCTR. 218200025 Check valves dia 1" os 0.2000 ‘Sub CCTR. 218200028 Check valves dia 2" os 0.2000 Sub CCTR. 218200027 Floor trap, gully 310 6" P, S oF Q type: os 1.2500 Sub CCTR: 218200028 Mixer tap for wash basins os 1.0000 ‘Sub CCTR. 218200029 Shower complete set os 1.5000 Sub CCTR- 218200030 Gas Cock (brass) 3/4 dia ros (0.2500 ‘Sub CCTR. 218200031 Floor drain 3” to 6" dia os 11.0000 ccrR-2te25 Hard ware / ron Mongries ! Protection ‘Sub COTR. 218250002 Fixing of Antipanie / escape device ros 2.0000 Sub CCTR- 218250008 Fixing of Door closer / Spring os 115000 ‘Sub CCTR- 218250006 Fixing of door Windows handels 08 0.5000 ‘Sub CCTR: 218250008 Fixing of Straggle (One piece overtaping) m 0.3300 Sub CCTR- 218250011 fixing of Door mortise lockset/rim lock os 1.0000 ‘Sub CCTR. 218250022 Misc. Doors / windows hard ware and accessories 0s 1.0000 ccTr.21830 Piping (Under Ground or Above Ground) ‘Sub CTR. 218300001 Laying, Jointing & hydrotest of RCC pipes dia 150mm excl. m 1.5000 excavation, backliling & Haunching Sub CCTR. 218300002 Laying, Jointing & hydrotesting of RCC pipes dia 200mm excl. m 1.5000 ‘excavation, backfiling and haunching Sub CCTR- 218300003 Laying, Jointing & hydrotesting of RCC pipes dia 250mm excl. m 2.5000 ‘excavation, backfling and haunching ‘Sub CCTR. 218300004 Laying, jointing & hydrotesting of RCC pipes dia 300mm excel. m 2.5000 excavation, backfilling and haunching ‘Sub CCTR. 218300005 Laying. jointing & hydrotesting of RCC pipes dia 400mm ™ 2.5000 excLexcavation, backfiling & haunching Sub CCTR: 218300006 Laying, jointing & hydrotesting of RCC pipes dia 450mm excl, —m 2.5000 ‘excavation, backfiling & haunching Sub CCTR- 218300007 Laying, jointing & hydrotesting of RCC pipes dia S00mm excl. m 2.5000 excavation, backfiling & haunching ‘Sub CCTR. 218300008 Laying jointing & hydrotesting of RCC pipe dia 600mm excl. mm 2.8000 excavation. backfilling & haunching ‘Sub CCTR. 218300009 Laying, jointing & hyarotesting of RCC pipes dia 750mm excl. m 3.0000 excavation, backfiling & haunching Sub CCTR- 218300010 Laying, jointing & hydrotesting of RCC pipes dia 900mm excl. 1.8000 ‘excavation, backfiling & haunching Sub CCTR: 218300011 Laying, jointing, & hydrotesting of RCC pipes dia 1000mm, m 4.0000 ‘oxcl. excavation, backfling & haunching ‘Sub CCTR- 218300012 Laying jointing & hydrotesting of RCC pipes dia 1200mm excl. m 4.5000 excavation, backfilling & haunching ‘Sub CCTR: 218300013 Laying & Jointing of PVC dia 19 mm pipes excl. excavation, m 0.5000 ceasing or concrete Sub CCTR. 218300014 Laying & Jointing of PVC dia. 25 mm pipes excl. excavation, m 0.5000 ‘casing or concrete Sub CTR: 218300015 Laying & Jointing of PVC dia 37 mm pipes excl. excavation, m 0.1800 ‘casing or concrete ‘Sub CCTR- 218300016 Laying & Jointing of PVC dia 50 mm pipes excl. excavation, m 0.5000 casing or concrete ‘Sub CCTR- 218300017 Laying & Jointing of PVC dia 75 mm pipes excl. excavation, m 1.0000 ‘casing or concrete Sub CCTR. 218300018 Laying & Jointing of PVC dia 100 mm pipes excl. excavation, m 11.0000 ‘casing or conerete Sub CCTR. 218300019 Laying & Jointing of PVC dia 150 mm pipes excl. excavation, m 0.6000 ‘casing or concrete Sub CTR: 218300020 Laying & Jointing of PVC dia 200 mm pipes excl. excavation, m 1.0000 ‘casing or concrete “Tis document ental! Proper 0 Desoon Engnenrng Lined, Ary urauhxied use, ican the modfcaton and reproduction of the content i icy prohibited (c) CCopyigts Ordnance 2002 Al Rights Reserve, ‘Boe Nor PROPIFRUPEZE Cost Centers List Rev. 01 Date: 01 - Dec-2004 Page 12 of § Date: 29 - May - 07,11:48:19AM DESCRIPTION uoM ‘ManhouriUom Dat Chir Sub CTR: 218300018 Laying & Jointing of PVC dia 100 mm pipes excl. excavation, 4.0000 casing or concrete Sub COTR- 218300019 Laying & Jointing of PVC dia 150 mm pipes excl. excavation, 0.6000 ‘casing or concrate Sub CCTR- 218300020 Laying & Jointing of PVC dia 200 mm pipes excl. excavation, +1.0000 ‘casing or concrete ‘Sub CCTR- 218300021 Laying & Jointing of PVC dia 250 mm pipes excl. excavation, m +0000 ceasing or concrete ‘Sub CCTR- 218300022 Laying & Jointing of PVC dia 300 mm pipes excl. excavation, mm 1.0000 ceasing or concrete Sub COTR- 218300047 Laying of G.l pipes dia 12mm excl. excavation, backfilling m 0.5000 Sub CCTR- 218300048 Laying of G.! pipes dia 19mm excl. excavation, backfilling m 05000 Sub CCTR- 218300049 Laying of G.1 pipes dia 25mm excl. excavation, backfilling m 0.5500 ‘Sub CCTR- 218300050 Laying of G.1 pipes dia 38mm excl, excavation, backfiling m 0.7500 ‘Sub CCTR- 218300051 Laying of G.I pipes dia Somm excl. excavation, backfilling m 0.8500 ‘Sub COTR- 218300052 Laying of G.! pipes dla 75mm excl. excavation, backfilling m 4.0000 ‘Sub CTR: 218300053 Laying of G.! pipes dia 100mm excl. excavation, backfilling m 1.2500 Sub CCTR- 218300054 Laying of G.1 pipes dia 150mm excl. excavation, backfilling m 41.7500 Sub CCTR- 218300091 Laying of cast iron pipe dia 100mm excl. excavation, m 1.5000 bbackfiling ‘Sub CCTR- 218300002 Laying of cast iron pipe dia 150mm excl. excavation, m 1.5000 backfiling ‘Sub CTR: 218300093 Laying of cast iron pipe dia 200mm excl. excavation, m 2.0000 backfiling Sub CCTR- 218300094 Laying of cast iron pipe dia 250mm excl. excavation, 2.5000 bbackailing Sub CCTR. 218300095 Laying of cast iron pipe dia 300mm excl excavation, m 3.0000 backfiling ccTR-21840 Water Proofing ! Roof Treatment ‘Sub CCTR- 218400001 Bitumen coating (Single coat) m2 0.3000 ‘Sub CCTR: 218400002 Laying craft paper single layer m2 0.7000 ‘Sub CCTR- 218400004 Laying polyethylene sheet one layer m2 0.0500 Sub CCTR- 218400005 Water proofing (product item) single coat m2 0.4000 Sub CCTR. 218400007 Lay Geotextile fabric / polypropylene (single layer) m2 0.1300 ‘Sub CCTR: 218400010 Water proofing of foundation with Synthaprufe (Under ground) m2 0.6000 ‘Sub CTR: 218400011 Water proofing of foundation with epoxy (Above ground) m2 0.6000 ‘Sub CCTR. 218400012 Water proofing of foundation with Asphalt Bitumen Emulsion m2 1.2000 Sub CCTR- 218400013 Waterproofing protection Hard Board m2 0.2500 Sub CCTR. 218400080 Fabricate and install metal (copper / G1) water stopper ™ 1.5000 Sub CCTR- 218400090 Installation of EPDM / LDPE (self adhesive / non adhesive) m2 3.0000 single layer ‘Sub CCTR- 218400100 Bitumen coating with polyethylene sheet sand and tu tle m2 3.0000 (grouted) ‘Sub CCTR- 218400110 Foam conerete inc. batching with mixer machine & haul / m3 10.0000 transport, place and finish Sub CCTR. 218400120 Lay sand cushion m3 1.4000 Sub CCTR- 218400130 Lay Thermopore sheet m2 0.1300 Sub CCTR- 218400140 Cold applied bitumen emulsion single coat m2 0.7600 ‘Sub CCTR- 218400150 Install water stopper (PVC) m +1000 ‘Sub CCTR- 218400160 Application of rubber lining in pits m2 0.2500 Sub CCTR- 218400170 _ Installation of bituminized felt single layor m2 0.4000 Sub CCTR- 218400200 Place screed on Roof (20 to 60 mm thk) m3 10.0000 ‘Sub CCTR- 218400210 Spread pea gravel at top of roof m3 4.0000 ‘Sub CCTR- 218400220 Installation of brick tiles on roof m2 2.5000 Sub CCTR- 218400230 Installation of Concrete Precast tiles on roof m2 2.0000 Sub CCTR- 218400240 Grouting of roo tiles (concrete / clay) m2 0.6000 “This docurnt i nelectual Property of DesconEngheerng Limes. Ary unauhorzed use, Incl the edton and reproduction f the contri ty prehibied() Copyts Ordnance 2002 Al gh Reserves. ‘Boe No: PROPIFRWU-BZE Cost Centers List Rev: Ot Date: 01 - Dee 2006 Page 13 of 5 Date: 29 - May - 07,11:48:194M DESCRIPTION ‘vom ‘ManhourlUom Da Chait Sub CCTR- 218400220 _ Installation of brick tls on root ma 2.5000 Sub CCTR- 218400230 _ Installation of Concrete Precast tiles on roof ma, 2.0000 ‘Sub CCTR: 218400240 Grouting of roof tle (concrete / clay) ma 0.6000 ‘Sub CCTR- 218400250 Install cant strip on roof (treated timberfoamglass) 4°x4" orm 0.2500 uncer. 218400260 Fixing of AC/ C11 PVC Root dain Ppa (410 6° a " c.asoo Sub COTR: 218400270 Fixing of Cowels 0s 0.0600 Sub CCTR- 218400280 Fixing of rain water down spout (4"to 6") os 2.0000 ‘Sub CCTR- 218400290 Fixing of Precast splash block. ros 0.6000 ‘Sub CCTR: 218400300 Fixing of Roof scupper (6° to 8° dia) ros 0.8000 Sub CCTR- 218400310 Fabrication & erection of roof gutter with MSIG.1 sheet (6"to—m 2.0000 8° Incl. supports & painting Sub CCTR. 218400320 Fabrication & erection G.1/ 8S coping on parapet (8*or 10") sm 0.5000 Sub CCTR: 718400330 Erection of prefabricated G.1/'SS coping on parapet (8 or 10" m 0.3000 sumer. 210400340 instal precast concrete coping 10° wide n o.ss00 Sub COTR- 218400350 _ Installation of prefabricated metal flashing / Ridge ” 0.2000 Sub CCTR- 218400360. Fabrication & erection of metal (MS/SSIG.) flashing m 0.5000 ‘Sub CCTR- 218400370 Supply and fixing of catch basin ros 3.0000 ccTR-21850 ‘Surface Preparation and Painting on Concrete / Masonry Sub CCTR- 218500001 Primer & 2-3 coats upto 5.0 meter (Distemper) me 1.2500 Sub COTR- 218500002 Primer & 2~3 coats above 5.0 meter (Distemper) me 1.5000 Sub CCTR: 218500003 Primer & 2-3 coats upto 5.0 meter ( White wash) me 0.3000 Sub CCTR- 218500004 Primer & 2-3 coats above 6.0 meter (White wash) ma 0.4000 ‘Sub CCTR: 218500005 Primer & 2-3 coats upto 5.0 meter (Emulsion) ma 2.5000 ‘Sub CCTR- 218500006 Primer & 2-3 coats above 5.0 meter (Emulsion) me 2.7500 Sub CCTR- 218500007 Primer & 2-3 coats upto 6.0 meter (Alkyd Enamel) me 2.5000 Sub CCTR- 218500008 Primer & 2-3 coats above 5.0 meter (Alkyd Enamel) ma 2.7500 Sub CTR: 218500009 Primer & 2-3 coats upto 5.0 meter (weather shield) ma 1.5000 ‘Sub CCTR: 218500010 Primer & 2-3 coats above 5.0 meter (weather shield) me 4.7500 Sub CCTR- 218500011 Sand blast on concrete surface me 1.8000 Sub CCTR- 218500012 Primer & finish coat of chemical resistant paint ma 2.5000 Sub CCTR- 218500013 Primer & finish coat of epoxy /coaltar epoxy paint me 3.0000 Sub CCTR- 218500014 Primer & finish coat of acid resistant paint me 2.5000 ‘Sub CTR: 218500015 Primer & paint (Nuorescent) on chimney slo ma 10.0000 ‘Sub CCTR- 218500016 Primer & 2-3 coats at any height for ceiling m2 2.5000 Sub CCTR- 218500170 _ Installation of wall paper up to 5 m height ma 0.5000 Sub COTR- 218500180 Acid resistant coating with woven /tissue Glass cloth single m2 0.8000 CoTR21852 Surface Propration & Painting on metal steel & wood ‘Sub CCTR: 218520001 Surface preparation, Primer & two coats Enamel Paint upto 10 m2 2.5000 suv comm: 21es20002 Surac preparation primer & wo costs Enamel Paint 10m1o m2 2.5000 sub eorR: 218520003 Primer wo coats (optot00 meter) 2 4.0000 Sub CCTR- 218520005 Only touch up to 20 meter height me 0.8000 ‘Sub CCTR- 218520008 Wood polish on Wooden Doors / Windows /Cabinets Railing m2 0.0700 ‘Sub CCTR- 218520007 Fire Proof paint on Doors me 44.0000 Sub CCTR- 218520008 Painting and lettering on Sign Board ma 0.0300 ccTR-21860 Fencing ‘Sub CCTR- 218600001 Installation of Fence post G.1 Pipe 1-1/2" dia,forfence 25m =m 1.6000 high, without provision for barbed wire, excl all other civil works. hie document nielectal Property of Descon Engineering Limted. Any unauthorized use, including he mosfcaton and reproduction of he contents sity prohibed() Copyighis Ordnance 2002, Al Rights Reserve. Cost Centers Rev: ot Doc No: PROPIFRN-EIS Date: 01 - Dec 2004 Page 14 of § Date: 29 - May - 07, 11:48:19AM DESCRIPTION uoM Manhour/om Ba hail Sub CCTR- 218520008 Painting and lettering on Sign Board ma 0.0300 ccTR-21860 Fencing Sub CTR: 218600001 Installation of Fence post G1 Pipe 1-1/2" dia, forfence 25m =m 1.6000 high, without provision for barbed wire, exci. all other civil works Sub CCTR. 218600002 Installation of Fence post G.1Pipe 1-1/2" dia, for fence 2.5mm 1.6000 high, with provision for barbed wire, excl. ll other civil works ‘Sub CTR: 218600003 Installation of Fence post M.SIG.1 Angle ron 60x60 mm, form 1.6000 fence 2.5 m high without provision for barbed wire excl. all ‘other civil works ‘Sub CCTR- 218600004 Installation of Fence post M.SIG.1 Angle iron 60x60 mm, form 1.6000 fence 2.5 m high above ground with provision for barbed wire, excl all other cv works ‘Sub CCTR: 218600005 Installation of Fence post R.C.C. precast for fence 25m high, m 1.6000 without provision of barbed wire, exc. al civil works ‘Sub CCTR. 218600006 Installation of Fence post R.C.C. precast for fence 25m high, m 1.6000 with provision of barbed wir, exc. all lvl works ‘Sub CCTR: 218600007 Installation of Fence with (M.S post & intermediate profiles) form 4.7000 fence 2.5 m high, excl ll civil works Sub CCTR- 218600008 Installation of puller wire (single line) and accessories for m 0.3000 fence Sub CCTR. 218600009 Installation of G.1 chain link fence height 2.5 m m 1.4000 ‘Sub CCTR- 218600010 Installation of PVC coated chain link fence height 2.5 m m 4.4000 Sub CCTR- 218600011 Installation of vermin mesh single layer height up to 1.00m =m 0.8000 Sub CCTR- 218600012 Installation of Barbed wie single line m 0.2500 ‘Sub CCTR- 218600014 Erection offence personal gate (single lea) 1.2m wide with nos 1.5000 ‘G.Ipipe posts and chainlink fence, excl all other civil works ‘Sub CCTR- 218600015 Erection of Fence vehicular gate 4m wide with Gl pipe posts m 2.8000 and chain link fence, excl all other civil works Sub CCTR- 218600016 Erection of Fence vehicular gate 8 m wide with G.l posts and m 4.0000 chainlink fence, exc. all other civil works coTR-21868 Expansion Joint Sealant Sub CCTR- 218680010 Install Foam Rod / Thixafoam / Beaker rod / Jumbolan in m 0.2000 expansion joints ‘Sub CCTR- 218680020 Application of primer for joint sealant on joint sides me 0.3000 ‘Sub CCTR: 218680030 Application of joint sealant m3 400.0000 Sub COTR- 218680040 Fill Bituminous Mastic in Expansion joints m3 500.0000 ‘Sub CCTR- 218680050 Sealing joints by installation G. flushing sheet ma 2.0000 Sub CCTR. 218680060 Sealing joint by installation Aluminium flushing sheet m2 2.0000 ‘Sub CCTR: 218680070 Cutting grove in RCC / PCC 5 mm wide, 0 mm deep by m 1.1000 machine for Expansion joints ‘Sub CCTR- 218680080 Installation of Bitumious imprignated Fiber Board m2 0.5000 ccTR-21870 Embedded Items ( Anchor Bolts and Profiles) ‘Sub CCTR- 218700001 Fabrication of MS profile / plates for embediments ton 175.0000 ‘Sub CCTR- 218700002 Erection of MS profile / plates for embediments ton 125.0000 Sub CCTR- 218700003 Fabrication of pipe sleoves (dia 150 mm xLength 450mm) ros 4.2500 ‘Sub CCTR- 218700004 Erection of pipe sleeves (dia 150 mm x Length 450 mm) ros 1.5000 Sub COTR- 218700005 Erection of plates / halfon ton 275.0000 Sub CCTR: 218700006 Fab. & erection of MS / SS rod (rungs) for ladders (100mm) nos 1.5000 ‘Sub CCTR- 218700007 Erection of Anchor Bolts ton 300.0000 ‘Sub CCTR- 218700008 Supply of Non-galvanized Anchor Bolts ton 1.0000 Sub CCTR- 218700008 Supply of Galvanized Anchor Bolts ton 1.0000 ‘Sub CCTR- 218700011 Fabricate& install wooden pockets os 2.0000 ‘Sub CCTR- 218700012 Installation & removal of pockets (Boxout) os 1.1800 SubCCTR- 218700013 Fabricate & Install Steel Pockets with wire gauze os 1.2000 Sub CCTR- 218700014 Installation of Expansion bolts ros. 02000 Sub CCTR- 218700015 Erection of MS profile / plates ‘9 0.1500 Sub CCTR- 218700150 Installation of Bolts with chemical capsules ros 0.5000 This documents intalecul Proper af Descan Engnseing Lined. Any unauberzed use, ckng the madison and reproduction fhe caren is sty roiited) Copyignts Orsnance 2002. Al Rights Reserved. Doc Nar PROPIFRIPEES Cost Centers List Rev: 01 Date: 01 -Dec- 2004 Page 15 of 5 Date: 29 - May - 07, 11:48:19AM DESCRIPTION voM | ManhourUom Bat Cri ‘Sub CTR: 218700013 Fabricate & Install See! Pockets with wire gauze os 1.2000 Sub CCTR: 218700014 Installation of Expansion bolts 08 0.2000 SubCCTR: 218700015 Erection of MS profile / plates 9 0.1500 Sub CCTR: 218700150 Installation of Bolts with chemical capsules ros 0.5000 corr-21675 Stoel Piles Supply, Driving and Testing ‘Sub CCTR: 218750010 Driving Stee! Pile small Size without Load Test & Mob/ Demob —m 0.5000 by Sub Contractor sub CeTR- 218750020 Driving Stee! Ple large size without Load Test & Mob/Demob 0.6000 by Sub Contractor sub corR- 218750030 Pile Driving Equipment - Mob/Demob trom Site m 0.0200 ‘Sub CCTR- 218750040 Movement of Piling Equipment - Between Pil 08 3.0000 ‘Sub CCTR- 218750050 Stee! Pile Load Test 1108 120.0000 ccr-21000 Demolition Sub CCTR: 218800001 Demolition of Reinforced Structures! Walls (With Equipment) m3 0000 Sub CeTR. 218800002 Demolition of Pile Head (With Chisel ms 30.0000 ‘Sub CTR: 218800003 Demolition of Plain Concrete Structures m3 ‘2.0000 ‘Sub CCTR- 218800004 Demolition of Bloch Brich Stone Masonry ma 5.0000 Sub CCTR- 218800005 Demolition of Road! Bituminous Paving (10 Cm Thick) me 0.2800 ‘Sub CCTR- 218800006 Demolition of Fence Including Foundation (2 mto3m High) m 0.5000 ‘Sub CCTR- 218800007 Demolition of RCC Floor! Slab on Grade (Upto 150 mmm Thick) m2 0.400 Sub CCTR- 218800008 Removal of False Ceiling mm 0.2000 ub CeTR- 218800009 Demolition of R.C.C Pipes (Including relevant works) m 0.7000 Sub CCTR- 218800010 Demolition of Door! Window ma 0.500 SuDCCTR: 218800011 Demolition of Sanitary Fixtures Fitings ros 0.8000 Sub CCTR- 218800012 Demolition of Roofing (Bult up) m2 0.3500 Sub CCTR- 218800013 Demolition of R.C.C / Masonry Buildings (Complete) m3 0.2000 Sw CCTR: 218800014 Removal of Trees (Not Exceeding 800 mm girth) by Tools os 2.0000 Sub CCTR: 218800015 Removal of Trees (Between 800 mm to 1500 mm gith) by 108 8.0000 sub comm: 216800016 Demolition of Plaster m2 0.2500 Sub CCTR- 218800018 Demolition of Hand Ralls (upto 1.25m high) m 0.3000 Sub CCTR. 218800020 Removal of Ralsed Floor m2 0.0000 corr-21885 Miscellaneous Civil works ‘Sub CCTR: 218850001 Landscaping (scanying, Dressing, soling, seeding, watering, m2 0.8500 ‘malntaining until established) su cer. 218050002 Spreading & leveling of Gravel ehippings. (100mm thick m2 0.1000 subccorm 218850008 Fkng of wall rot exhaust fan a 2.5000 ‘Sub CCTR: 218850016 Laying glass woo / polystyrene in masonry insulation ) ma 0.1200 ‘Sub CCTR. 218850017 Fabrication of 6. ducting (7kg /m2) including supports, m2 47000 sub corm. 218850018 rection of prefabricated Gi ducting (7kg/m2) including m2 3.8500 Supports Joints, fiting & leak test. (without Ineulation & paling) ‘sub cer. 218850019 Hyco Testing (pit / ponds! reservoir/ sumps / basin) ms 2.5000 Sub COTR- 218850038 Installation of Galvanized expanded stoe! mesh, ma 0.1500 sub COTR: 218850040 Concrete Repairing with Product me 2.5000 Sub COTR- 718850041 Restoration Work (Wooden Barrer Wal) ” 3.5000 ‘Sub COTR: 218850048 Mortar Finishing works m2 1.5000 Sub CCTR- 218850047 Supply and Fix Elastomoric bearing pads m3 600.0000 Sub COTR. 218850470 Load testing for ples 08 20,0000 ‘Sub CCTR- 218850480 mobilization cost for subcontractor Let 0.0000 Sub CCTR- 218850490 Material Supply 08 +.0000 This documents ibectual Peper of Descon Enginerng Limited. Any wrautorized use ning the modification and reproduction of the contents set petted (c) Copyrgs Ordharce 2002 Al ights Reserved. Doe Nar PROPTFRITEDS Cost Centers List Rev: 01 Date: 01 -Dec- 2004 Page 16 of 5 Date: 29 - May - 07, 11:48:194M DESCRIPTION voM | Manhouriuom Dat ha Sub CoTR. 218850047 Supply and Fix Elastomer bearing pads m3 600.0000 Sub COTR- 218850470 Load testing for piles os 20.0000 Sub CCTR. 218850480 mobilization cost for subcontractor tot 0.0000 SubCOTR. 218950490 Material Supply os 4.0000 ‘Sub CTR: 218850500 Installation 08 5.0000 SubCOTR- 218850510 Subcontracted work = 0.1000 corr-21686 Landscaping Sub CoTR. 218860001 Landscaping (Scartying, Dressing, Soling, Seeding, ma 0.9500 Watering Maintaining url estabiished) Sub eoTR. 218860002 Spreading & leveling of Gravel/ chippings. (100mm thick m2 0.1000 CoTR.21867 Ducting and Expanded stee! mesh Sub CCTR. 218670017 Fabrication of G.1 ducting ( 7kg/m2 including supports, ma 47000 supcorm: 216870018 Erection of prefabricated Gi ducting (Tkg/m2) Including m2 218800 supports, Joints fing & Leak fest {without insulation & painting) ‘Sub CoTR. 218870038 Installation of Galvanized expanded ste! mesh. me 0.1800 core-21088 Concrete Repairs ‘SubCCTR. 218880040 Concrete Repairing with product m2 2.5000 SSubCCTR: 218880046 Mortar Finishing Works ma 1.5000 corr 21689 Hydro Testing SubCCTR- 218800019 Hydro Testing (pt/ ponds / reservoir sumps / basin) m3 2.5000 corR-21890 ‘Complete Civil Works (Lump Sum) Sub CCTR- 218900010 Construction of Complete Bullding (one Story with ll ma 2.0000 Sub coTR. 218000020 Gonsiruction of Yard area inet. Foundations, trenches, m2 0.0000 Pits,Gravel rence) Complete uncom. 218900030 Client Facies wt 0.0000 e219 Extra Work, Day Work, ling and Supply ccTr-21010 Extra Work Civil . 0.0000 ‘Sub CCTR- 219100000 Extra Work Civil ‘This document's Intictus! Property of Descon Engineering Lied. Any unautharzed us, Inclusng he mofeston and epructon oh contents sty prohibited) Copyngnts Ordnance 2002 Al fags Resowed,

You might also like