You are on page 1of 1

AD-2 TUZLA

YILDIZ TECHNICAL UNIVERSITY DEPARTMENT OF ARCHITECTURE


BB SECTION S:1/50

Soil (26.5 cm)


Separating Layer
Heat Insulation (4 cm)
WP Membrane
Vapor Layer
Leveling Screed (2.5 cm) +10.20
Plaster (1 cm)
RC Slab (30 cm)
Plaster (1 cm)
White water based paint

+9.06

+7.80
White water based paint
Plaster (1 cm)
Hollow Brick (25 cm)
XPS (5 cm)
Plaster (1 cm) White water based paint
Separating Layer Plaster (1 cm)
WP membrane Hollow Brick (25 cm)
Air space (4 cm) XPS (5 cm)
Soil (10 cm) FF02 EXH 3 FF04 Terrace Plaster (1 cm)
Vegetation

D2
Mortar Tile 60*60*2 cm
Mortar and Sand (8cm)
Plaster (1 cm)
RC Slab (30 cm)
Plaster (1 cm)
White water based paint
+3.40

GF04 Open Area


W1 W1

D1

+0.00

-3.40

1 2 2'

PROJECT MANAGER: EDA PELENK RAMA IKHWAN-19073907

You might also like