Production per Hour Calculation Methods

Company Name: ABC Limited


Product name: Apparel Item

Case#1: Estimated production per hour (Single operator)

Estimated production
Seq. No. Operation name Operation SAM Employee Efficiency% per Hour (units)
1 Shirt bottom hemming 0.75 80% 64
2 Side seam 1.2 75% 37.5
3
4
5
6
7

Case#2: Estimated production per hour (Multiple operators/workstations)

Seq. No. Operation name Operation SAM Employee Efficiency% No of workstations


1 Shirt bottom hemming 0.75 80% 3
2 Side seam 1.2 75% 5
3 0.5 56% 6
4 0.76 76% 1
5
6
7

Case#3: Production per hour from daily output (of a line)

Estimated production
Seq. No. Line# Total production Working hours per Hour (units)
1 Line 12 1200 8 150
2 Line13 1180 8 147.5
3 Line15 1500 10 150

This Excel template is developed by Online Clothing Study (OCS)


www.onlineclothingstudy.com
Estimated production
per Hour (units)
192
187.5
403.2
60

)
How to use?
1. Enter your data in the cell in light blue colors
2. The result column is not protected. So don't delete the formula