MOTOR ASSEMBLY CHECK SHEET :

DATA COLLECTION : ONE WEEK

 In this CHECK SHEET, we have covered a data


of one week analysis of Motor Assembly, Data of
various defects occuring during/after the
production of Motor Assembly have been
collected.

 This Data shows the defects occurred in the past


week. With this CHECK SHEET we have
identified that the Supplied Parts getting rusted
is the main defect in the production of Motor
Assembly.
 By this Data we have concluded that, Rejection
Rate in the production of Motor Assembly can
be decreased by using Good Quality Supplied
Parts.

 Hence making more check sheets we can lower


the Rejection Rate.

 To Reduce The Rejection Rate in the Production


of Motor Assembly, we can find out some ways
listed below:

1. By using Parts of Good Quality


2. Well Aligned Welding
3. By Carrying out Proper Testing Procedure
4. Accuracy in Dimension
5. Avoiding Voids during Casting
6. Sufficient Production
7. Avoiding Adhesive Failure
8. Unnecessary Spray Failure.

......... THANK YOU ......