Professional Documents
Culture Documents
LTD(MEPCO)
MONTHLY STATEMENT SHOWING UNITS RECIVED & SENT OUT
I.R.O 132 KV GRID STATION INDUSTRIAL ESTATE RAHIM YAR KHAN. FOR THE MONTH OF ___/20____
ST-01
REMARKS
DIFFERENCE
NAE OF POWER TRANSFORMER TOTAL TOTAL CAPACITOR MINIMUM MAXIMUM
AUX WHERE AUX UNIT
SR.NO GRID UNIT UNIT % AGE KVARH P/F LOAD LOAD
UNITE ARE
STATION RECIVED SENT % AGE % AGE
INCLUDED
VOLTAGE ONLINE OFFLINE
NAME MVA
RATIO
MVAR MVAR
INDUSTRIAL ESTATE RAHIM YAR
132 KV GRID STATION
132/11 KV
31.5/40
KHAN
MVA
HEC
1
No: Date:
Incharge
132 KV G/S Industrial Estate
Forward to A.M (T) SS&T Sub Division Rahim Yar Khan Rahim Yar Khan