KEMENTERIAN RISET, TEKNOLOGI, DAN PENDIDIKAN TINGGI
MINISTRY OF RESEARCH, TECHNOLOGY, AND HIGHER EDUCATION
POLITEKNIK NEGERI MALANG
‘STATE POLYTECHNIC OF MALANG
Terakreditasi A, SK BAN-PT Nomor 409/SK/BAN-PT/Akred/PT/XII/2018
‘ational Accreditation Board for Higher Education Decree No, 409/SK/BAN.-P/Akred/PY/XU/2018 (A Accredited)
SURAT KETERANGAN PENDAMPING NJAZAH
Diploma Supplement
Nomor/Number : 12786/PL2/TE/D-1V/2019
Surat Keterangan Pendamping ljazah (SKPI) ini diterbitkan oleh Politeknik Negeri Malang untuk digunakan sebagai pelengkap
jazah yang menerangkan capaian pembelajaran dan prestasi dari penegang ijazah selama masa studi.
This document serves to supplement the certificate issued by the State Polytechnic of Malang to describe the learning outcomes
‘and achievement of the holder.
Ta. Nama lengtap “LS. Tanggal Kelulusan
Full Nome Date of Graduation
Diago Subanekit 103 Juli 2019
1.2. Tempat dan Tanggal lahir 1.6. Nomorjazah
Place and Date of Birth Certificate Number
Kediri, 16 Mei 1996 '203032019000329
113. Nomor Pokok Mahasiewa 117. Gelar/Sebutan Lulusan
‘Student Identification Number Academic Degree
1541150071 Sarjana Terapan Teknik (S.Tr.T.)
114. Tanggal Masuk
Date of Admission
(01 September 2015
Ta Surat keputusan Pedivan Program Studi aa irsanaini Saat
tstblshent Decree Entry Requremers
‘SK. DIRIEN DIKTI No. 1920/0/T/2005 ‘Lulus SMU/SMK/MA dan Lulus Seleksi
2.2. Namo Pergurvan Tings Mahasiswa Baru .
‘Nome of Higher Education instution 2.8, Bahasa Pengantar Kuliah
Politehnik Negeri Malang Language of nstucton
2.3. Nama Program Studi Bahasa Indonesia
‘Sturdy Progront_ 2.9, Sistem Penilaian
Sistem Kelistrikan. Grading System
2.4. Jens Pendidikan ‘ed; 84=3,5; God; God; God; Dali ED
ossification of Study 2.10, Lama Studi Reguler_
Vokasi el tengtna ty
2.5. Jenjang Pendidikan 4 Tahun (8 Semester) dengan menempuh 160
Ecco Lee! sks
Diploma IV 2.11. Jenis dan Jenjang Pendidikan Lanjutan.
2.6, Jenjang Kulfiassesual KANT Acceso Further Study
ret Level Indoneson Quofton Framework DelV atau St (Sarana Terapan atau Sarjana]
Level 6 2.12. Akreditasi Program Studi
“cedtation of Study Pegrom
3
Dipindal dengan CamScanner7. Menguasai pengetahuan tentang penghiturgan hubung singkat,alran day, stabltas sistem day, optimas!
pembanght therm, kualtas daya, pentarahan sistem tenaga, gardu Induk beserta sistem kendall untuk
plasters teraga.
Mastering knowledge of short circuit measurement, power flow, power system stability, thermal power plant
‘optimization, power aualty, power system grounding, power substations as well as contol systems for power
system oppications.
8. Menguasa) prinsip dan tata cara kerja bengtel, kepatan laboratorium Kelsrikan, serta pelaksanaan
eselamatan dan hesehatan kerja (13).
Mostering the principles of workshop and working procedures, electrical laboratory activites, os well as the
‘implementation of occupational safety ond health SHE).
3.2. INFORMASITAMBAHAN / ADDITIONAL INFORMATION
1. Prestasi / Penghargaan / Awards
2. FINALS LOMBA GAGASAN / FINALISTS OF NATIONAL LEVEL CREATIVE IDEAS AND DESIGNS, With the Theme
“INTERNET OF THINGS (IOT) AND RENEWABLE ENERGY TECHNOLOGY IN THE ERA OF INDUSTRIAL
REVOLUTION 4.0
2. Keikutsertaan dalam Organisasi/ Participation in Organization
Sertifikasi Keahlian / Vocational Certificates
_2. SERTIFIKAT KOMPETENS! TEKNIK LSTRIK(PEMELHARAAN JARINGAN DISTRIBUSI SALURAN UDARA) /
(CERTIFICATE OF ELECTRICAL ENGINEERING COMPETENCE
». TEST OF ENGUISH LANGUAGE PROFICIENCY TEST OF ENGLISH LANGUAGE PROFICIENCY
‘c SERTIFIKAT PELATIHAN MICROSOFT OFFICE 2013 / CERTIFICATION OF MICROSOFT OFFICE 2013 TRAINING,
<6. TEST OF ENGLISH FOR INTERNATIONAL COMMUNICATION (TOEIC / TEST OF ENGLISH FOR INTERNATIONAL
‘COMMUNICATION (TOEIC)
Praktek Kerja Lapangan / Magang/ Internships
Praktek Kerja Industri (Prakerin) di PT. Graha Usaha Teknik (GUT) Sorik Marapi Mandailing Natal z
‘Medan / PT. Graha Usaha Teknik (GUT) Sorik Maropi Mandailing Natal Medan :
Judul + Konstruksi Gardu Induk 66 kV Sorik Marapi Geothermal Power Plant di Mandailing Natal
Medan 2
Title: Construction of 65 kV Substation Sorik Maropi Geothermal Power Plant in Mandailing a
‘Notol Medan aa
5. Tugas Akhir /Laporan Ahir /Skripsi/ Final Report -
Judul : Implementasi Inverter Satu Fasa Tipe Pure Sine Wave Untuk Sistem Pembangkit Listrik
“Tenaga Picohydro di Javan Langur Center os
Title: An Implementation of Single Phase Pure Sine Wave Inverter for Picohydro Power Plant aa
‘System In Javan Langur Center os
Dipindai dengan CamScanner