You are on page 1of 1

Secondary Current Test Report

Test Item: JTC-22-1029-04

Test Personnel: H.Leva/J.Morente

Equipment Name: STEP-UP TRANSFORMER PANEL

Test Place:1590 BAUANG, LA UNION

Equipment Number:OAT2/F077

Test Date:2022-10-29

=========================================================================
=========

Test Parameters:

Parameter Rms Change Step Upper Limit Phase Change Step


UA 63.500 No 2.000 120 0.0 No 1.0
UB 63.500 No 2.000 120 240.0 No 1.0
UC 63.500 No 2.000 120 120.0 No 1.0
IA 2.000 Yes 0.500 5 0.0 No 2.0
IB 2.000 Yes 0.500 5 240.0 No 2.0
IC 2.000 Yes 0.500 5 120.0 No 2.0
Ux 10.000 No 1.000 120 0.0 No 1.0
Hz 60.000 No 1.000 70

Ux: Random
Test Type: Test Contact Action
De-jitter Time: 10 ms
Autotest Interval: 30000 ms

-------------------------------------------------------------------------
--------

Test Results:

Digital Input Action Time(ms) Return Time(ms)


A 5052

-------------------------------------------------------------------------
--------

Parameter Act Trip Time Return


Coefficient
Current IA 4.000 5052 ms
Current IB 4.000
Current IC 4.000

You might also like