You are on page 1of 1

81.

00m
Y
PP PP 1.00M WIDE GREEN BELT
1.2X1.2M 1.00M WIDE GREEN BELT 1.2X1.2M PP
MH
MH MH
1.2X1.2M PP
1.2X1.2M
MH
MH

7.47m
12

DRIVE WAY DRIVE WAY 0m


.0

9.97m
.
0

2
m

1
CELLAR LINE
7.00m 7.00m
23 22 21 20
RAMP DOWN TO

4.50m
RAMP FROM B1 SECOND PODIUM
33 24

.00 [0"]
RAMP RATIO 1:8 RAMP RATIO 1:8

RAMP DOWN TO

RAMP RATIO 1:8


CELLAR
5.00 M WIDE DRIVE WAY
6.00 M WIDE DRIVE WAY
25
32

W2 V
1 D1
MH
TOILET
1.22X2.00 TOILET
4.50m V
1.22X2.00
WATCHMAN ROOM D1

2.50m
31 3.70x 4.52M
SCOOTER PARKING 37
MH
26 4.50m
VENTILATION CUT-OUT VENTILATION CUT-OUT
D
14.37 SQ.MT 21.95 SQ.MT

43.88m
DRIVE WAY

DRIVE WAY
D

1.00M WIDE GREEN BELT


PP
2 3
1.2X1.2M

36 30 27
ELECTRICAL ROOM
4.07X3.96M

2.23m
44.46m

LIFT
2.00X2.00m
1.00M WIDE GREEN BELT

FIRE LIFT 2.40m

1.50m

1.50m
5.50 M WIDE DRIVE WAY 2.00X2.00m LIFT
X' 2.10m 2.00X2.00m
DN
X'

3.81m

3.81m
35 34 29 28 1.50m

RAMP RATIO 1:8


SECOND PODIUM
1.50m
UP

RAMP UP TO
1.50m

1.50m
LIFT DN
F/D UP
LOBBY
F/D

5 4

VENTILATION CUT-OUT
14.37 SQ.MT

SCOOTER PARKING

MH

5.00 M WIDE

KTL
DRIVE WAY
2.50m 2.50m 2.50m 2.50m

MH
4.50m

4.50m

4.50m

4.50m
1U 1V 1W
VENTILATION
H.T L.T CUT-OUT

7 8 9 10 11 12 13 14 15 16 17
8.91 SQ.MT
18 19 7.00m
7.39m
STROM WATER SUMP

0m
CELLAR LINE 12
7.00m

7.10m
.0 .0
1 2 DRIVE WAY DRIVE WAY 0 m

GARBAGE BIN 1.00M WIDE GREEN BELT MUNCIPAL WATER


GATE SUMP
GATE

81.57m
STROM WATER LINE
Y WATER LINE SEWERAGE LINE

EXISTING 12M (40'0")WIDE ROAD

PODIUM -1
TOTAL N O OF CARS - 38

You might also like