MODEL:T-6 150 mm (69 di
DESCRIPTION AND INSTRUCTION FOR INSTALLATION OF
PRESSURE RELIEF VALVE
port opening with switch, indi
oil (13335) filed trensiormer,
lag and rain gaurd, sutable for
MODEL: $-6 — 150 mm (6°) dia port opening. wih switch, indicating flag and ran gaurd, suitable to:
synthetic liquid filed wanstormer.
PRESSURE RELIEF VALVE WITH RAIN GUARD.
(On page 2 details of Switch Box & Flag Box are shown by removing Rain Guard. )
Glossary of terms
PRV Pressure Relief Valve,
Tank Tank in which Transformer winding & oil etc. are housed,
Figures: Figures in Brackets in wtite-up refer to pan list of Org. C8-601.A5.
Application .
This PRV 1s designed to be used on Power Transformers and similar applications. Whon pressure int
tank rises avove predetermined safe limi, this valve operates end performs fillewing fun
Allows the pressute to drop by instantaneously opening a port of ‘about 159 mm dia
Gives visual indication of valve operation by taising a tag.
Operates a micro switch
This switen has 1NO and 1 NC contacts (Fou! terminals). Hence switch can be el
circuit
Specitications
See Page 4
Tests
Routine Tests are cairied out on each PRY. A Test Certiicate is prepated cine sent vith eanstyn
1
AUG
tively used inFt PRESSURE RELIEF VALVE, Fig.2 DETAILS OF SWITCH BOX
680.15 FoR MOUNTS
NOP QUA SUPPLY,
ROUNINE TESTS:
2: GASSER vine :
FN GUAAO APPEARING IN PHOTO IS HOF SHOWN N ORAWANG
PARTS LIST FOR 1 ANO 2
a [emtawa teresa eam
is [erupts ne Tea ;
is | sweater att
esos ar eeearmal foro
7 aaa rn ;
ve] wie paar omen | WRB eas] + | ron
Bure ASS ala
: woot ia aaa
2 ze Seema
a 1 pase sma
8 eee sucon etoneen
2 the Serb
i 7 a
FIG-4 WIRING AND SWITCH OPERATION
BEFORE VALVE OFEAATON ! _arTEN VALVE orenAnOK
FIG.3 DETAILS OF MOUNTING PAD nes [ea
4 wee asa NOIL 1 iy puso 14 saret ecaeT Maar
of mane a + Sat th eS te
| us mute
FE aera a
7 oem a
cid LF SOS wos et SuKaur uovos
pa es Sra lananan PONE
11S NOT SHOWA W URAC en
NOTE TAPPING OF ROLES TO 3E CONE BEFORE WELDING. one [sone | paescune nevier
2. THe LOCATION As PUR SITE REQUPMENT VALVE
5. Pad Is nor OUR surrer sene| nis
L5A
Ex)
54
58
Cohstruction and Working :
(Rater Org. O8-601-R'5)
{fils PRV has an iniogral ange with six holes for
mounting. ‘The valve can be mounted vertically
‘Srhorizantally 01 tne lank. The PRV has got 8
ott of about 160 mm dia. This port Is sealed by
& etalnless steel diaphragm (4). This diaphragm
ests on an ‘O' ring and is kopt pressed by Iwo
heaw duty springs (6), thereby Keeping the port
‘closed, ‘The other side of diaphragm is exposed
totank pressure, Whenever pressure in the tank
tises due fo any reason, the same pressure actt
fon the diaphvagm from Inside. When pressure
rises above predetermined safe limit, th
‘inphragm gots ited from ts seat, ‘This liting is
instantaneous and allows vapours, gases or tquld
to come oxt of tank depending upon tho postion
of valve on tank. The daphragm regains is
poation as soon as pressure in the tank diops
below set limit. The lift of diaphragm is utilized
to porate flag (12) and micro switch (13) with
the help of rod (8). The flag and switch remain
‘sperated until thoy are reset manually.
Ghecke For Valve 5 s
PAV is ganer in a comrugat
Doe, The mathod of packing may Vary. The
PRY should be checked as follows, bofere it ia
Installed.
Rlemove the valve trom packing and keep it on
a able, Remove all packings, stings fixed to
‘valve, Check tial no pats are dameged in vanst.
it any damage is found, refer to faults ar
remedies column In this leaflet,
Product label indicates the Model and bursting
pressure, Ensure that proper valve Is teken,
Remove tain guard. Then remove the cover of
‘Switch bax. Connect suitable testing device to +
terminals of switch. Cheek the position of contact
as per ‘Balote valve operation’ diagram of
FIG 4 - Wiring and Switch Operation.
For manual checking, it switch operating rod (9)
by hand. Tho jit will result in operation of ewitch
& indicaling flag as follows,
‘Switch - Contac! will change over to ‘After valve
‘operation’, This will be confiemed by
the testing device connected to
terminals,
= The indicating flag (12) will be lied as
Fiag
Switch & Indicating lag should be reset manuelly
ater checking
Swiich - Press Knob (14) which is positioned at
lower sida of saiten box. After pressing
the knob contacts will change over to
‘etore Valve Operation’ positon,
+ Turn the flag down as indicated by an
iro on flag box. Flag will aguice
aiiginal positon before iting ol rod (0)
Flag
Atter checking of switch operation & flag operation
fit cover of sate box, Then fix the rain guard as
per i's original position
5. Each PRV is tested with compressed air to check
the bursting pressure. However, customer is
advised to check tne valve by stimulating pressure
‘onditions before insiallation on transiormer. We
Gan provide schemalic drawing for fabrication of
test pad.
Mf PRY is found operating at pressure out of
tolerance limi, i willnave (0 be returned (0 us for
fesetiing. Changing of buisting pressure can not
bbe dene outside our factory.
‘While conducting such Tests at your end care
should be taken thal small particles do not have
‘a passage through the port opening. Such
particlesare likely to get Wrapped between
Glaphragm and gasket which will affect functioning
of PRY.
Tt shuld also be noted that inaccurate pressure
‘gauge may lead to wrong conclusions. Hence
Accurate pressure gauge of 0 10 2.5 Kg/em’ may
be used with least count 0.05 Kglem® or better
6. Check For Installation :
The following checks should be observed before
instalation of PRV on Transtorme
81. Check that the orientation of pad is properly done,
62. Check that the propor bots, M 12 X 90 with thick
washers aio taken for installation, Bols other
than this size shoud not be used,
63 We supplied a gasket (2) with PRV. Any
‘other gaskot than supplied with the valve can be
used with dus precaution,
Provide cable gland of 1" BS Conduct with
‘Suitable bush for cable to be used,
After all above checks, the PRV is ready for
installation
64
7. Installation :
Each valve should be cleaned trom inside (tank
side] with compressed di: jot. All particles should
be removed from tank side, While cleaning, care
should be taken that the jet does not aitack the
‘swilch and the flag mechanism, The PRV should
be installed considering the following aspects.
7.1. The indicating fag is easily seen from distance.
“The valve is accessitle for manual resetting and
for touine manual checking
While installing remove dit and clean the
mounting surface.
7.2. The rubber gasket supplied with the valve should
be properly cleanod & be located in the re:
carefully. Tighten M12 bos evenly with care
7.8 Remove Rain Gaurd, Remove cover of Switch
Box (6). Cec conic eevia totermnal ole
provided in tne swich bor trough ala gland
(16) sg s
FA. Cheek the oporaton of ag and aviteh by ning
perating rod @) as done Guang chaching as pet
83 8 84. Aller checling ol Flag and cont
Sheu, tepiace cover ot hich Box and
Ran ua
7.8 The PAV can be pul te serviceof
Faults and Remedi
ioe Vive tina H\iuwen! wea UAEIGH mre (9 fi IKAIG Ni nk tata pity ITeiomime Win: Moenthig tty
tak doicate lie. Hence W ts likely to got dainayed, 1Hhe Uidivating Nag daly Uw ‘opluaod al yout wil
‘asking for replacement,
You can repal with the help Of good Instrument mechanic minor faults occurting in working of switch ot flay
Meohaniains, However for breskage or damage to mojor parts tke diaphragm, base, vaive cover send the
PAV back (0 us for leakage through diaphragm PRY mut be ¢elumed to us
In any case the Sr. No. of PRY must be Informed so thal sending correct replacement Is possible, This will
‘also save lot of communication,
General Notes :
‘Store the valve on its base duly packed In polythene bag to ensure that dirt or other solid patties do not
* eniar the valve port from tank aide.
92
98
94
Bo not remove the protection cover when itis stored.
‘Keep the flat gasket (2) duly tied o the valve, Remove it only when it is to be Installed, This gasket should
be kept dry.
‘Ar stallion of valve ontranstormer, test perodcaly te urevonng of seh operation ana tag operat
by ling the operating rod manually, This will ensure the switch operation and flag opsration when valve
‘opens due to rise in pressure inside the tank.
Wis not possible to change the operating pressure at site.
“The valve gaskets are of entiraly different naturs for synthetic quid and transformer oll. Hance use proper
valve for liquid as described on product label,
Models S-3W and T-8W are supplied without switch and Indicating flag.
‘Wo continously review specfleatiors and whore eppropralo,nraduce medications. We therefore resen
the fight to change specifications in this catalogue without prior nolic.
A Test Ceniticate is prepared after carrying out routine fests on each PRY. One copy of TC Is packed with
‘consignment,
SPECIFICATIONS ;
1 LIQUID IN TANK SYNTHETIC LIQUID OR
‘TRANSFORMER OIL AS PER ORDER.
2 = OPERATING PRESSURE 0.42, 0.49, 0.56, 0.7, KG/CM
ANY ONE VALUE AS FER ORDER
3+ OPERATING TOLERANCE 40.07 KG/CME (1 LB SQ.INCH)
4 OPERATING TIME INSTANTANEOUS
® 8 VALVE RESETTING AUTOMATIC.
6 SWITCH RESETTING MANUAL,
7 VISUAL INDICATOR RESETTING MANUAL
é OPERATING TEMPERATURE 0 TO 100° COF LIQUID IN TANK)
8 ENVIRONMENT INDOOR OR OUTDOOR
10 ‘SWITCH MICRO SWITCH 0.7.07.
" PORT OPENING 160 @ NOMINAL
393
SUKRUT UDYOG .
9/1AErandavana, Pune 411 004, INDIA
@ Telephone : (0212) 341726 , 341514
(@ GRAM : SUKAUT , PUNE
4
CAT No. 60/4