Question 1
Correct
110161
Preventive Corrective Adaptive Perfective
John bought a new Laptop with a high end configuration. To protect his laptop and the applications installed he installed a antivirus
software.This is an example for Preventive Maintenance
Question 2
Correct
110161
The standard document where the requester fills the change in the change management Change Request Form
process
Process that ensures that changes made are recorded and controlled
Change Management
110161
Your answer is correct.
The correct answer is: The standard document where the requester fills the change in the change management process → Change Request
Form, Process that ensures different versions of the project is managed → Configuration Management, Process that ensures that changes
made are recorded and controlled → Change Management, Who authenticates that the change proposed is valid → Change Control Board
https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 1/4
10/31/22, 10:56 PM Post-Quiz: Attempt review
Question 3
Correct
Select one:
a. True
b. False
Question 4
Correct
110161
From the options identify the features that are part of the software configuration management
b. Support management
c. Synchronisation control
d. Version management
110161
Version Management, Synchronization Control and Concurrency Control are the features that are part of the software configuration
management
The correct answers are: Version management, Concurrency control, Synchronisation control
Question 5
Incorrect
110161
The entry door of the Server room inside the company can be considered as equivalent to
configuration management.
https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 2/4
10/31/22, 10:56 PM Post-Quiz: Attempt review
Question 6
Correct
_________ is a committee that makes decisions regarding whether or not proposed changes to a software project can be incorporated.
Select one:
a. Decision Committee
b. Updation Control Board
c. Modify Control Board
d. Change Control Board
Question 7
Correct
Select one:
a. TRUE
b. FALSE
110161
Question 8
Correct
Select one:
a. Check-out
b. Baseline
c. Evolution graph
d. Review Graph 110161
Evolution Graph describes the change history of an object
The correct answer is: Evolution graph
Jump to...
https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 3/4
10/31/22, 10:56 PM Post-Quiz: Attempt review
110161
110161
110161
https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 4/4