You are on page 1of 3
ject information ven Proje 20.MB in BIS ANSE: ‘nal Code: (CT HNS 4 the necessary tools, equipments and infarmation you are expected to perform the following three expected projects ‘The assessor should ask oral questions on which he/she Is satisfied by your performance Assessment Venus:-well equipped assessment center or real work place: Total time allotted for all project: 3:00 hrs: ct 1 Propose and design network infrastructure Time Allowed, -1:00hr Competency covered 283.4Bulll Internet Infrastructure iMigraie to New Technology Manage and Maintain Small/Medium’ Business Oparation Proje the candidate is expected to perform the following five tasks he information prox Hect yeu are required to design company network & internet infrastructure for Importing, distrib tlon of drugs & medical company's application soi sales, maintenance, 8 for resellers usin ware Ithas 5 HRM, public relation & marketing GH and Gina 1d wit a distance of Jitain 12 users in Company mailing system stem security ~~ N \ \ prdwar i £ (naitruction:-undar this projact you are expected 19 P" ‘based on the information provided ~ cams Taakt. Identity the basic resources required © Tims Allowed: -1:30hre im tre rovowi Instruction: - under this task you are expected ta perro (on the Information provide: ? A. Identify hardware needed to built the infrastruetur S: Mendy Sofware rigeaed fo bull the fastens © [entity type of intarnet connectivity needed (0 Bul stquctre Visio 2010 oft office 08! Task 2 Design the infrastructure of network using Mier’ the infrastructure Instruction: under this task, you ahould prepare logical design (OF : using MS Visio that considers |. Appropriate network devices uitable types of cable to be u 3. Intemet connectivity ort strategy Project 2 Plane, organize and assist to develop organizational ellent SUPP Time allotted 30 Minute vered 1.0819Plan and Organize Work = 1Assistwith Policy Development for Client Support E11 Determine Maintenance Strateay the candidate is expected to perform Propose Client suppo' instruction: Under this Mechanism and maintenance strategy to minimizing the down time of the network system TheCompany needs annual maintenance service for all pes. The company posts the announcement for interested bidders. - Instruction: -under this project you are expected to perform the following tive tasks based-on mation provided ae a wot Coda: ICT HNS 4 ‘reskt:- prepare SLA of The Company using Microsoft PowerPoint instruction: -under this task You assume as an IT administrator who wins the bid and expected to prepare SLA of TheCompany using Microsoft PowerPoint. (Hint— use the following points to prepare the SLA) » Objective of the services: > Services provider responsibiiiies > ‘Customer responsibilities > ‘Services technique » Modification and review of the agreement ‘Cecupational Code: ICT HNS 4 Ne. Vern description Quantity Unit; Specification ; a Se "| eompater a a standard ae = "is window 7 — | preinstalled uipment(per candidate) OO : jun. 2017)

You might also like