You are on page 1of 7
oa WEN ID racecar CONSUIING Grom rasow ous Sato ravaNt ENGINEERS SARCHITECTS Att: Mr, M.K. Ajayakumar Contractor's Representative Address: M/S Afcons Sam India Consortium, AFCONS INFRASTRUCTURE LIMITED, Plot No.87, Khasra No.360, Hari Puram, Near Sanjay Baug, Mauza Jaganpur, Agra, Uttar Pradesh-282005 Contract: AGCC-02: Design and Construction of Tunnel from start of underground ramp (Near Fatehabad Road Metro Station) to end of ramp after RBS college Metro station including seven underground Metro stations (viz. Taj Mahal, Agra Fort, Jama Masi, S.N. Medical College, Agra College, Raja ki Mandi and RBS College) including Architectural finishes, E&M, TVS, ECS ete. on Corridor-t of ‘Agra MRTS Project at Agra, Uttar Pradesh, India Code: Agra-LET~IVTI-QAS-00652-E01 Date: 10-October-2022 Subject: NCN No. 81 Segments stacking deficiencies in Bay 2 at casting yard AGCC-02 Ref.: [1] Agra-NCN-JVTI-GAS.00081-£01 dated on 08.10.22 Dear Sir, Hereby GC submits the NCN No. 81 “Segments stacking deficiencies in Bay 2 at casting yard AGCC-02." for your answer & closure. The Contractor is advised to submit the CAPA within 7 days after reception of this letter and its attachment. This is for your information and Records. Tey] ical Thanking you, for TYPSA, pen Td Jocorec feasmnes TALFERR JV, I SZ) | 8 . ‘Designation [iol] Despair Ro CO Enelosements:Agr2-NCN-JVT-OAS-00081-£0' dated on 08.10.22 - Conrte: + Ure; D, Dye, cem uD. AaM asa sass, 9) 2. GC: DBM, AMI, JO2, KKM, VKK, NRD, SHD. v Lucknow Office: 790.8 71". Levene Cyber Height, lalpur Colony. Vibhut Khang, om Nagar, Lusk Ut fedesh -226010 “a HE Ei vraccene — Non Conformity Notice (NCN) | Project Name and Contractor Code AGCC-OZAFCONS-SANINOIA CONSORTIUM | _Agra:NON=JVT-QAS-00081-£01 General Consultant: TYPSA-ITALFERR JV | Date: | 08.10.2022 PRODUCT: - ‘The contractor is hereby notified that the work identified below are considered rejected for the reasons stated until the contractor submits Compliance to address the issue or formally responds to this notice why the work concemed are acceptable with evidence to substantiate compliance, PROCESS: - The contractor's response is expected within 7 days of the date of receipt of the notice through official letter correspondence Submission of NCRICAR, Investigation Report & Preventive measures to avoid | recurrence. Details of Non-conforming works / deficient process Works/Process | Segments stacking deficiencies in Bay 2 Location Casting Yard-Underground Finding Engineer representative observed deficiencies in stacking of concrete segment and AFCONS js not following the guidelines of stacking & storage of concrete ‘segment in Bay 2 as per the project requirements. ‘The Current issues at hand conceming to deficiency in stacking issues are listed below: 1. Center to Center spacing for Precast Segments i less than the 1m which is notin line with the approved procedure. Segments stacked in the bay 2 shall be preferably stacked with uniform spacing and maintaining proper barricading such that there will be hassle free during shifting of segments to minimize breakage and defacement issues. 2. Wooden battens utilised at stacking yard at base (In contact with PCC) are not having sound weight and the thickness of wooden battens are less (i is suggested to use the wooden battens wit higher hcknes at bose level or lad | dlstbuton) | 3. Segment stacked in bay 2 are in a haphazard manner and the area is not properly compacted and levelled surface and hardened concrete surface layer. 4, Initiation of carrying the PCC layer in Bay 2s still pending. Therefore, the Contractor is advised to respond the NCN with the CAPA in the | dedicated page “Contractor Proposal of the Remedial actions within 07 days” | Reference Document: Site Photograph, MS of Precast Segment fgre-NON-IVT-OAS-O “a BB sracrern ine cae upmrc Non Conformity Notice (NCN) [Type of Non-Conformity Notice —___Diiinor — EiMajor Location: Casting Yard Underground —_ — Traceability Code: Agra. Agra Metro Conidors 1éamp:2 > 01. Agr condor 1. Skandra to Taj East Gate > 01.01 Civ, Architectural and Eletro-Mecharical > 01.01.03, Balance Conder > 1-AGCCO2. Twin Tunnel incl 4 UG Station tramp General Consultant Representative: Name: Position: Signature: Date: José Antonio Olivares | K1 QA Expert h j » 08-10-2022 NON-IVTI-GAS. ies! coREATNG Zw Non Conformity Notice (NCN) PHOTOGRAPHS/ATTACHMENTS. $ Image 3 showing segment stacked on ground Surface {not properly compacted) a a DB racrerr Non Conformity Notice (NCN) Image 5 showing less space b/w segments Image 6 Initiation of PCC in Boy 2 “a LB sratrern Kay J Non Conformity Notice (NCN) Contractor Proposal of the remedial actions: AgreNON. \Ti-aas-0008 Position: Signature: Date: wa We LI rarer Non Conformity Notice (NCN) General Consultant's Review on Compliance: Tl Approved (Next Activity may proceed) C1 Approved with comments (Next activity may proceed to incorporation of comments) Cy Rejected (Revise and resubmit, next activity cannot proceed) 1 The Contractor has not taken any remedial action and wil continue under his responsibility General Consultant Representative: Name: Position | Sionature | Date: a ‘Agre-NON-JVT-QAS-0008"-E Page 6

You might also like