Installation Guide
Commissioning overview
The following overview lists the operating steps for using your optimail for the first
time. You have to perform these steps in the given order before you can use the
optimail. If certain steps are inapplicable for installation and commissioning of your
optimail (e.g. because you have not ordered a sealer) simply proceed with the next
one. All steps are described in detail on the following pages.
Step 1: Unpacking
Step 9: Turning on
Contents
Commissioning overview __________________________________________ 2
Safety tips ______________________________________________________ 4
Installing and commissioning optimail _______________________________ 5
Step 1: Unpacking __________________________________________5
Step 2: Checking the contents of the package ____________________6
Step 3: Installing the optimail __________________________________7
Step 4: Installing the ribbon cassette ____________________________7
Step 5: Mounting the scale platform (optional) ______________________9
Step 6: Installing the catch tray (optional) ________________________10
Step 7: Installing the sealer (optional) ___________________________11
Step 8: Connecting the optimail _______________________________13
Step 9: Turning on _________________________________________15
Step 10: Authorization _______________________________________16
Step 11: Loading postage / TELESET ___________________________22
Zero-rated postal imprint _________________________________________ 25
Tips for dealing with issues occurring during commissioning __________ 26
Service ________________________________________________________ 31
The optimail is designed so that you can install and start it yourself with the help
of this Installation Guide.
We will gladly provide support for installing your optimail. Simply contact our
service or your local sales agent.
Safety tips
Please observe the following tips when installing and commissioning for your own
safety:
• Install and commission the optimail according to the instructions in this guide.
• Check that the machine is complete and undamaged. Do not start operating the
optimail if parts are damaged or missing. Please contact the Francotyp-Postalia
Service.
• Use only the power and modem cables provided or approved by Francotyp-
Postalia. Make sure that cables are not damaged.
• When you move the optimail from a cold environment (i.e. below 50°F / 10°C):
Wait at least 24 hours before connecting the optimail. The optimail requires this
period to adapt to the ambient conditions.
• Only operate the optimail on a grounded single-phase power socket that conforms
to the power requirements indicated on the serial number plate.
• Make sure the socket for connecting the optimail is close by and easily accessible
at all times.
• Do not remove any parts of the housing.
• Never cover the ventilation slots in the housing.
• We recommend to use only approved FP equipment and FP original parts.
The manufacturer FP has established reliability, safety and applicability.
The manufacturer cannot assess the reliability, safety and applicability for products
not approved by FP, and therefore not vouch for such products.
• If you are using an external Francotyp-Postalia communication device
(GSM Modem or Universal Link Box) for optimail: carefully read the product
information that came with the GSM Modem / the Universal Link Box.
Step 1: Unpacking
11 1
10
9
2
7 6 5 4 3
Ribbon spool
Cassette
latch
Filler hole
• Fill the sealer with tap water or sealing
liquid. The special sealing liquid is
available from Francotyp-Postalia.
Catches
Power cable
• Connect the power cable to the postage
meter. The power connection is at the rear
of the optimail.
• Plug the power plug into a grounded
Power cable
single-phase power socket.
Make sure your office power supply con-
forms to power requirements shown on the
serial number plate of the optimail.
Step 9: Turning on
A Security Device protects the optimail against manipulation. This Security Device
monitors the status of the postage meter. This is why you must first sign in (authorize)
at the TELESET data center and load postage (validate). The optimail guides you
through this authorization procedure. Simply follow the instructions on the display.
Caption Multi function keys The optimail caption indicates the current
step of the authorization procedure.
The left window area displays instructions
and current settings (display area).
The right window area (menu area) displays
the control functions for the authorization
procedure (CONTINUE, CANCEL…) and
various options, e.g. for modem
configuration.
Use the multi function keys – the keys to the
right of the display – to select the desired
Display area Menu area setting / function.
(here still empty)
Also heed the information in the status bar.
Status bar
Connection Configuration
There are three ways of connecting optimail:
– Internal Modem
– GSM Modem
– Universal Link Box (ULB).
• Start Connection Configuration with
CONTINUE.
optimail scans connected devices and offers
a list where you can select from available
connection types. This can take a few sec-
onds.
Connection Configuration:
Internal Modem
You must edit the configuration to match the
internal modem to your telephone connection
so the optimail can establish a connection to
the TELESET data center.
• Select INTERNAL MODEM.
The optimail prompts you for
– the connection type (phone type)
– the access method
– the exchange digit if applicable.
The table on page 19 shows and explains the
possible settings.
The TELESET data center number is stored
at the factory.
Exchange digit The exchange digit Use the numeric keys to type the
depends on the exchange digit. The exchange digit can
telephone system. comprise several digits. Normally, a ‘0’
is used.
Connection Configuration:
GSM Modem (optional)
To operate the GSM Modem you must type
the PIN of your modem’s SIM card.
• Select GSM MODEM.
Connection Configuration:
Universal Link Box (optional)
You must configure the network connection
before optimail can establish a connection
with the TELESET data center.
• Have the Francotyp-Postalia customer
information with the data for your network
at hand. If necessary, contact your network
administrator.
• Select UNIVERSAL LINK BOX.
optimail will now try to establish a connection
with your network. A message will inform you
of the test result.
• Follow the instructions on the display to
configure the network.
You will find extensive information about the
procedure of the network configuration and
the explanation of technical terms and
abbreviations used in network installation
online at www.francotyp.com.
Authorization
optimail will call the data center when
Connection Configuration has been
completed successfully.
It will take about 1 to 2 minutes to establish
the connection and to authorize your opti-
mail. Please stand by.
The optimail displays a message when the
authorization was successful and prompts
you to load postage.
• Select CONTINUE to start the TELESET
process (Step 11).
You now load the first postage into your postage meter. The sum you enter is loaded
into your optimail as a postage credit. The called amount is paid according to your
contract with Francotyp-Postalia Canada Inc.
Installation is complete.
• Press .
• Use the arrow key to scroll to the next
page.
• Use the multi function keys to select:
IMPRINT MANAGEMENT ZERO-
RATED POSTAL IMPRINT.
optimail sets the ‘Zero-Rated Postal Imprint’.
• Place an empty envelope or a folded sheet
on the letter catch tray:
– side to be printed face up
– the top edge must touch the letter guide.
• Push the envelope in direction of the arrow
until the optimail feeds the envelope. The
illustration shows the approximate position
where the optimail starts feeding the letter.
A roller pushes the envelope against ribbon
and print head as soon as the letter sensor
detects the envelope. Printing starts. The
optimail prints and ejects the imprinted
envelope to the right.
The optimail prints a normal meter imprint
with the postage value ‘00.00’ (zero-rated
postal imprint).
Service