You are on page 1of 30
Girona Techies No. 57 song Roe, lust Park, xlangshaa, Ningbo, (09878 6878 1608 #ésolis PV Grid Tie Inverter Solis Three Phase Inverter Installation and Operation Manual & ©Ginlong Technologies Co.,Lts Important notes ‘ntraduction ens 3 4.4 Product Description 3 4.2Packaging List 4 2, Safety Instructions 5 21 Salely Symbols = 5 2.2.Ganeral Safety Instruction 5 2.aNotice For Use 6 3. Overview 7 2.1 Inverter Interface Instructions 7 2.2LED StatusindieatorLight 7 B.BKeypad eer 5 aavep 8 4. Product handing ans storage ® 4.1 Proguct Handing 8 4.2 Product Storage 0 5.1 Salect a Location for tne Inverter a 5.2 Mounting the Inverter a 5.9 Elecrical Connections 6 5.3.1 Protective ground wire connection(E) 6 5.3.20 side connection 8 5..3AC da connection 20 5.3.4Max. overcurrent protection device (OCPD) ~~~ 23 5.3.5 invertor monitoring connection 2 6. Startand Stop ar 6.1 Startthe invertor ar 8.2 Stop the inverter 27 7. General Operation 2 7.4Main Mens 2 72 Information 28 72.1 Lock ser 30 7a Seting 20 7.3.1 Seting Tine 30 7.8.2Sotting Adsross 30 7.4.3 Alarm Message a 7.4.2 Running Message at 7.4.3Version 22 7.4.5 Monthly Energy 2 17.4.8 Yearly Eneroy 33 1.4.7 Daly Record 2 7.4.9 Warn Massage 2 7.5 Advanced Settings - Technicians Only 3s 7.5.1 Select Gre Standars “ 7.5.2 Grid ONOFF 35 7.8. Caer Energy 8 7.5.4Now Passwors 36 7.88 Power Contra! Py 7.5.6 Callorate Eneray 36 7.5.7 Special setings a 7.5.8 STO. Mode Settings a 7.5.9 Restore Settings a” 7.5.10 HMI Undat 28 7.5.12 Debug Parameter 28 7.5.14 Power Parameter 38 78ARC Fault 0 7.6.4 Enable the AFC! function 40 7.62Are Fault 40 8. Maintonance “ 9. Trouble Shooting 4 1. Introduction an} powers ¢ 2 (40-50)K, 80K-46 (530K 0-70)K-HY —TOKHVG 1. Introduction 2. Safety Instructions A Seow . Dy 2iessercrao 2. Safety Instructions A Sihouncemmnmaana Dy Wikies Seen A caution, 3. Overview an Sten (AC) Stns sntened abla tarpon DE ltr anh “Ont Righ ALAR LED (peo! nese tesla 3. Overview 4. Product handing and storage SS ee 4. Installation 5. Installation 5. Installation 5. Installation a+ 5. Installation 5. Installation SS x: Ve 5. Installation 5. Installation 5. Installation 5. Installation SS 5. Installation IEEE 5. Installation a 5. Installation 5. Installation 5. Installation 5. Installation Monitoring syste co ard (suse. 25) 3 e485, oT nese 5. Installation 6. Start & Stop ES 7 Operation 7_Operation Opera n 7 Operat jon colshushumangtggmarer "avmanmaanneitanu a & seen Here ‘Tha olwing stan ae diapayeen th Satign manual Tigre Seno 2.erson 4: Daly nergy 6 Monty Enray ‘Tre aeslayshors 10 ates arm nesses (ee Figure 8) Sere cone seoed 7. Operation 7. Operation A De rien enty tenement A ea Opera n 7 Operat jon anger User nt 4-791 ovo.vn 296-2950 O.0-F150 29K 243H2) ovcnve 2e0-24tw Ov crrzsrsane(s-ame) ange forUser Det a5.a0}640 ove 120-1200 Ov. 80 2.5350 263K) ov.c.va 10-1000 Onc. s1.an4(6-3He) wows sss2n Uwosrt ara shais-s9.59 ENTER ay oa iad re. 7. Operation 7. Operation 199 Yt try tO ve st submenu shown below estore Seng etets herve tofactry dau. Stecting wil show the 7. Operation 7. Operation 7. Operation 8. Maintenance 8. Maintenance 8. Maintenance EL 9. Troubleshooting 9 Troubleshooting 9. Troubleshooting 9 Troubleshooting 9. Troubleshooting 1 Specification 10. Specification 1 Specification 10. Specification 1 Specification 10. Specification 1 Specification 10. Specification

You might also like