[MAIN CONTRACTOR'S DIRECTION (MCD) __A HYUNDAI @Keangnam manana
‘Waterfront integrated Resort Direction Ref Noi | HKN-MCD-CN- 15555
Te ‘Abas Eginng a aa
“a PMIPD iain Tp ‘Naser
No ofpas inal Ws ae) | z Te ‘Conscion
Direction Details
Sie Cornoutke Sing wok ike calor ara [ Comment Da
WL Pras carey ot the following works a the pec oaton within thespecfed completion period
Your works aren ty
WE pursuartootvant ctausos in tho Conations of the Subcontract. you are hereby crete to comply with the flowing
‘olator than he dao speced stove ram recat of ths Direction fling which he Mn Conary proceed,
‘without any tutor eternce fo you 1 execs ho work on your bohal nd al cots snd expanses shat be dodted
‘tam any maney or marie i oto become de oy unde our Subcoad.
outs heping / Clearing of debris Removal of watt) works not completed by the
‘completion date, HRN may proceed withthe necessary works andthe cost of doing so together with admin
‘charges, shall be back chared to your company.
Imerease current manpower
Repalt Replacement of unsutable equipment
Provide plant/eauipment tot :to spect).
‘Submit method statement / shop drawing sche
manpower report work record
‘Submit recovery programme with supporting report describing the revised methods
Rect! rmedy the detective works =
Removal ofunauthorzed works: =o specty)
Others:-(to specify)
Hore we are instructing you to caryout the cladding work(ou ie) forthe escalator area en LO2, BOHOY as
000 as possible (Please find the flached drawing for your reference)
goooo0000 oO
ae pH W—
Tamer Te Sane
Design: Project Manager Das: Deputy Cosmin Manage
caesar a beeer
[1 aking 00 ot defects where cotis borne by you
of re pt
Disb:
CURR ce Nome Quan Dass Geum ovr Blew