Elite Terms 31-60

You might also like

You are on page 1of 30
22:01 BO © WS A atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 31 1/1P a Which of the following is a regulatory sign (traffic): Cross Road sign Roundabout sign Reverse turn sign VY Left lane must turn left sign Score 1/1P Q. 32 W1Poo a Is atype of thermoplastic lane marking designed to aid and provide motorist with visual audio and motion warnings on the road Linear Delineation System Guide post -_7 Rimble ctrine 22:01 BO © WS A atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 32 1/1P A Is a type of thermoplastic lane marking designed to aid and provide motorist with visual audio and motion warnings on the road Linear Delineation System Guide post VY Rumble strips None of the above Score 1/1P Q. 33 1/1P Aa Messages when painted on pavement should be limited to words or less. They shall only be used to supplement other traffic control devices four ~7 three 22:01 BO © 199 FZ atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q.33 1/1P Aa Messages when painted on pavement should be limited to words or less. They shall only be used to supplement other traffic control devices four VY three two None of the above Score 1/1P Q. 34 W1P oa The shape is reserved exclusively for the STOP sign Rectangle Circle Trianala 22:01 BO © 199 FZ atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee a megareview.testportal.net © testportal Q. 34 W1P oa The shape is reserved exclusively for the STOP sign Rectangle Circle Triangle Y Octagon Score 1/1P Q.35 OP oa The symbol is mainly used for regulatory signs x rectangle circle triangle actanon 22:01 BO © 799 FZ atl ul 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee a megareview.testportal.net © testportal Q. 35 0/1P a The symbol is mainly used for regulatory signs x rectangle circle triangle octagon Score 0/1P Q. 36 O/1P A The equilateral triangle with one point vertically upward is used for sign Warning Guide Regulatory “s Cnanial Inctrinntian 22:01 BO © WT FR atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 36 OP ow The equilateral triangle with one point vertically upwardisusedfor _—__ sign Warning Guide Regulatory xX Special Instruction Score 0/1P Q. 37 O/IP oa Foundation for all building where the surface of the ground slopes more than 1 unit verticalin units horiztonal shall be level or shall be stepped so that both top and bottom of such foundation are level. x 2 22:01 BO © VW FZ atl tlh 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 37 ONMP oA Foundation for all building where the surface of the ground slopes more than 1 unit verticalin___ units horiztonal shall be level or shall be stepped so that both top and bottom of such foundation are level. x 2 4 5 10 Score 0/1P Q. 38 WPA (NSCP 2015) Basic Wind Speed is a gust speed measured froma certain distance above the ground. 5-second 4-second 22:01 BO © SE BR atl al 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 38 W1Pooa (NSCP 2015) Basic Wind Speed is a gust speed measured from a certain distance above the ground. 5-second 4-second SY 3-second 2-second Score 1/1P Q. 39 WIP oa (NSCP 2015) Low Rise Building is an enclosed or partially enclosed building that has a mean roof height, h, less than or equal to 15m 22:22 BO © VW FZ atl lh 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 39 WIP oA (NSCP 2015) Low Rise Building is an enclosed or partially enclosed building that has a mean roof height, h, less than or equal to 15m VY 18m 21m None of the above Score 1/1P Q. 40 o/1P a (NSCP 2015) Low Rise Building is an enclosed or partially enclosed building that has a mean roof height, h, that does not exceed the least horizontal dimension larnect horizantal dimensian 22:22 BO © WSF FR atl al 95%H x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 40 ONP oA (NSCP 2015) Low Rise Building is an enclosed or partially enclosed building that has a mean roof height, h, that does not exceed the least horizontal dimension largest horizontal dimension average horizontal dimension x None of the Above Score 0/1P Q. 41 11P oa Rigid Building - fundamental frequency is greater than or equal to Y 1.0 Hz 2.0 Hz 4.0 Hz 22:22 BO © VB Se atl al 95%H x [NOV-2022] Online Training Exam 01 - Test sum... a megareview.testportal.net eee © testportal Q. 41 1/1P Aa Rigid Building - fundamental frequency is greater than or equal to VY 1.0 Hz 2.0 Hz 4.0 Hz 5.0 Hz Score 1/1P Q. 42 WP oOo A Seismic Importance factor, I, of essential facilities is equal to 2.0 1.25 ann 22:22 BO © 9F2 Se vat) atl 95%H x [NOV-2022] Online Training Exam 01 - Test sum... eee a megareview.testportal.net © testportal Q. 42 WP oA Seismic Importance factor, I, of essential facilities is equal to 2.0 Y 1.50 1.25 1.00 Score 1/1P Q. 43 o/1P Aa Seismic Importance factor, |, of hazardous facility is equal to x 2.0 22:22 BO © 9F2 Se vat) atl 95%H x [NOV-2022] Online Training Exam 01 - Test sum... eee a megareview.testportal.net © testportal Q. 43 O/1P a Seismic Importance factor, |, of hazardous facility is equal to xX 2.0 1.50 1.25 1.00 Score 0O/1P Q. 44 Poo Seismic Importance factor, |, of standard occupancy is equal to 2.00 1.50 1.25 22:22 BO © 199 Se atl al 95% 4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 44 INP ow Seismic Importance factor, |, of standard occupancy is equal to 2.00 1.50 1.25 Y 1.00 Score 1/1P Q. 45 1/1P Aa The seismic zone factor, Z, of the philippines is equal to (except for Palawan province, Sulu and Tawi-tawi) 0.2 7 0.4 0.8 22:22 BO © 199 FZ atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 45 1/1P a The seismic zone factor, Z, of the philippines is equal to (except for Palawan province, Sulu and Tawi-tawi) 0.2 VY 0.4 0.8 1.0 Score 1/1P Q. 46 Poa (Irregular structures) It shall be considered to exist where the horizontal dimension of the lateral-force-resisting system in any storey is more than 130% of that in an adjacent storey. One-Storey penthouses need not be considered. Stiffness Irregularity 22:22 BO © WZ atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 46 1P ow (Irregular structures) It shall be considered to exist where the horizontal dimension of the lateral-force-resisting system in any storey is more than 130% of that in an adjacent storey. One-Storey penthouses need not be considered. Stiffness Irregularity VY Vertical Geometric Irregularity Weak Storey Irregularity Torsional Irregularity Score 1/1P Q. 47 11P oa (Irregular structures) shall be considered to exist when the maximum storey drift, computed including accidental torsion, at one end of the structure transverse to an axis is more than 1.2 times the average of 22:22 BO © V2 Se atl) al 95%H x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 47 1/1P a (Irregular structures) shall be considered to exist when the maximum storey drift, computed including accidental torsion, at one end of the structure transverse to an axis is more than 1.2 times the average of the storey drifts of the two ends of the structure. Re-Entrant Corner Irregularity Diaphragm Discontinuity Irregularity Y Torsional Irregularity Weak Storey Irregularity Score 1/1P Q. 48 WP oA (Irregular structures) one in which the storey strength is less than 80% of that in the storey above. 22:22 BO © 199 > atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 48 1/1P Aa (Irregular structures) one in which the storey strength is less than 80% of that in the storey above. Soft Storey Irregularity Y Weak Storey Irregularity Weight Irregularity Non-parallel systems irregularity Score 1/1P Q. 49 OMP oA (Irregular Structures) Discontinuities in a lateral force path, such as out-of-plane offsets of the vetical elements. Discontinuity in Capacity Irregularity Non-Parallel Systems 22:22 BO © 199 Se atl al 95% 4 x [NOV-2022] Online Training Exam 01 - Test sum... eee a megareview.testportal.net © testportal Q. 49 0/1P a (Irregular Structures) Discontinuities in a lateral force path, such as out-of-plane offsets of the vetical elements. Discontinuity in Capacity Irregularity Non-Parallel Systems Irregularity Out-of-Plane Offsets Irregularity >< In-Plane Discontinuity in Vertical Lateral-Force- Resisting Element Irregularity Score 0/1P Q. 50 1/1P Aa (Irregular Structures) one in which the lateral stiffness is less than 70% of that in the storey above or less than 80% of the average stiffness of the three stories above 22:22 BO © WSF Se at) al 9544 x [NOV-2022] Online Training Exam 01 - Test sum... @ megareview.testportal.net © testportal Q. 50 1/1P a (Irregular Structures) one in which the lateral stiffness is less than 70% of that in the storey above or less than 80% of the average stiffness of the three stories above Weak Storey VY Soft Storey Vertical Geometric Irregularity Diaphragm Discontinuity Irregularity Score 1/1P Q.51 OMP oA In CPM, the minimum possible time for completion of an activity, corresponding to maximal resource concentration. Crash Time Normal Time 22:22 BO © 199 FZ atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 51 OMP ow In CPM, the minimum possible time for completion of an activity, corresponding to maximal resource concentration. Crash Time Normal Time Pessimistic Time >< Optimistic Time Score 0/1P Q. 52 OP A In CPM, the maximum time for completion of an activity, corresponding to minimal resource usage. x Pessimistic Time Crash Time Normal Time 22:22 BO © 199 FZ atl tl 95%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 52 OMP oA In CPM, the maximum time for completion of an activity, corresponding to minimal resource usage. x Pessimistic Time Crash Time Normal Time Optimistic Time Score 0/1P Q. 53 1/1P Aa Atermin the CPM method describing the process of reducing the time required to complete an activity. Speeding VY Crashing Riichina 22:03 BO © 499 Za tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 53 1/1P a Atermin the CPM method describing the process of reducing the time required to complete an activity. Speeding VY Crashing Rushing None of the above Score 1/1P Q. 54 OP oa Which of the following is/are true? |. Backward pass is the process of moving backward along anetwork from end to beginning, computing the latest finish time and then the latest start time for each activity Il. Normal distribution is a probability distribution used to model the activity times tn Pent 22:03 BO © 799 ZR at tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 54 OP oa Which of the following is/are true? |. Backward pass is the process of moving backward along anetwork from end to beginning, computing the latest finish time and then the latest start time for each activity Il. Normal distribution is a probability distribution used to model the activity times in PERT. lll. Forward Pass is the process of moving along a network from beginning to end, computing the earliest start time and earliest finish time for each activity. IV. A branch is a line ina PERT network indicating an activity (in AOA) or a precedence (in AON). Also called an arc. x | and Ill only I, Il, and IV only I, Ill, and IV All of the above 22:03 BO x [NOV-2022] Online Training Exam 01 - Test sum... © WS AR atl tl 96%4 @ megareview.testportal.net © testportal Q. 55 OP oa The PERT/Cost model assumes that Score 0/1P Q. 56 each activity achieves its optimistic time the costs are uniformly distributed over the life of the activity activity times are statistically independent none of the above Poa The PERT/Cost control report requires a budget for each activity requires a report on the percentage of completion of 22:03 BO © WL FR at tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 56 1/1P a The PERT/Cost control report requires a budget for each activity requires a report on the percentage of completion of each activity calculates cost overruns SY all of the above Score 1/1P Q.57 1/1P Aa In PERT/CPM, it is a graphical method of representing a project with nodes and arcs. Branch Event Activity List 22:03 BO © WH A at tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 57 1/1P a In PERT/CPM, itis a graphical method of representing a project with nodes and arcs. Branch Event Activity List VY Network Diagram Score 1/1P Q. 58 WP ow The marginal cost of crashing a network could change when the activity being crashed reaches its crash time the activity being crashed reaches a point where another path is also critical 22:03 BO © WE AZ at tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 58 1/1P a The marginal cost of crashing a network could change when the activity being crashed reaches its crash time the activity being crashed reaches a point where another path is also critical VY both a andb None of the above Score 1/1P Q. 59 OP oA In the CPM time-cost trade-off function the cost at normal time is 0 x within the range of feasible times, the activity cost increases linearly as time 22:03 BO © WE Fat tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal Q. 59 O/1P A In the CPM time-cost trade-off function the cost at normal time is 0 xX within the range of feasible times, the activity cost increases linearly as time increases cost decreases linearly as time increases none of the above Score 0/1P Q. 60 WP oa In Time-Cost Trade-off Function (CPM system), calculating Max Crash Hour is equal to Normal time + Crash Time 7 Normal Time - Crash Time 22:03 BO © WE Fat tl 96%4 x [NOV-2022] Online Training Exam 01 - Test sum... eee @ megareview.testportal.net © testportal time increases none of the above Score 0/1P Q. 60 11P oA In Time-Cost Trade-off Function (CPM system), calculating Max Crash Hour is equal to Normal time + Crash Time VY Normal Time - Crash Time Crash Time - Normal time Crash Time + Normal time Score 1/1P Poweredby (© testportal

You might also like