1.

Add a Note in the drawing that this wall will not be used in the river portion where
scour can take place.

Reply: Noted.

2. Mention unit of base pressure mentioned in the table.

Reply: Noted.

3. In notes section some lines as ' slab bottom main bar" wall/Column main bar are
mentioned. Delete all these lines if not required or give meaning to these lines.

Reply: Noted and corrected.

4. s1 and s2 shear links are shown in drawings but. give complete details for the same as
total height above 6m requires shear reinforcement. Please check.

Reply: Shear links are not required in design.

5. At height " k "some bars are curtailed. Give dimension of "k" also add curtailment
check height k in the design document.

Reply: Noted and curtailment checks are provided in design.