Greetings sir
Safety is everyone responsibility, not only u
&me or safety team,it's a team work then
only will get good results like completing
the projects without LTI.
We are 40 members available 24*7
working hard to train ,innovate new
ideas,advice,guide to implement safety at
our projects. U can cal any time to take
advices.
Now 2 families lost their person's with a
small issue.
We can't comper satesate there families.
Kindly follow the sofe work pre ~edures and
risk assessment mitigation measures ,jsa
for all activities.Y because tl example of transmission line
example.
Regarding pipe laying allow only 3 pipes
laying at a time with
Survey for underground utilities
Excavate with valid permit system
Maintain sloping for excavation and use
trench boxes
Use fit and good conditioned equipment
like hydra and Lifting tools,welding
machine,dgs.
Weld pit for outer welding
Follow confined space procedures for inner
welding.Follow emergency procedures,
Maintain ventilation
Maintain safe access egress
Maintain supervision
Gas testing
Ppes
Tripping devices use karo
EGE
Again iam advising and instructing to
implement safe work procedures at
workplace.
Ty