You are on page 1of 4
Greetings sir Safety is everyone responsibility, not only u &me or safety team,it's a team work then only will get good results like completing the projects without LTI. We are 40 members available 24*7 working hard to train ,innovate new ideas,advice,guide to implement safety at our projects. U can cal any time to take advices. Now 2 families lost their person's with a small issue. We can't comper satesate there families. Kindly follow the sofe work pre ~edures and risk assessment mitigation measures ,jsa for all activities. Y because tl example of transmission line example. Regarding pipe laying allow only 3 pipes laying at a time with Survey for underground utilities Excavate with valid permit system Maintain sloping for excavation and use trench boxes Use fit and good conditioned equipment like hydra and Lifting tools,welding machine,dgs. Weld pit for outer welding Follow confined space procedures for inner welding. Follow emergency procedures, Maintain ventilation Maintain safe access egress Maintain supervision Gas testing Ppes Tripping devices use karo EGE Again iam advising and instructing to implement safe work procedures at workplace. Ty

You might also like